Tenement: E08-2863

View on Landtracker Maps (logon required)

Extracted from MTO on 11-Jul-2025 01:36, last changed 27-Jun-2025.

Tenement Summary

Identifier:E 08/2863Type:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:22 BL
Purposes:Term:5 Years (Extended)
Markout:Received:26-Jul-2016 14:42
Commence:07-Jun-2019 Expiry:06-Jun-2029

Holders

Company NameSharesTotal Shares
WYLOO METALS PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
SQUADRON RESOURCES PTY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25026-Jul-2016 22.00000 BL

Conditions

#VerTextStartEnd
12All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, IndustryRegulation and Safety.27-Aug-2024
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.07-Jun-2019 26-Aug-2024
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.07-Jun-2019
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.07-Jun-2019
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.07-Jun-2019
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
07-Jun-2019
61The rights of ingress to and egress from Miscellaneous Licences 08/52 and 08/132 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.07-Jun-2019
71No interference with Geodetic Survey Stations J 84A/102, J 84A/104, J 85A/4, J85A/1,  Yanrey 40 and Yanrey 40T and  and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.07-Jun-2019
81No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.07-Jun-2019
91No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.07-Jun-2019
1In respect to the area designated as CPL 38 in TENGRAPH the following conditions apply:07-Jun-2019 08-Jul-2021
101Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
07-Jun-2019 08-Jul-2021
111The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
07-Jun-2019 08-Jul-2021
121Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.07-Jun-2019 08-Jul-2021
131No mining within 25 metres of either side of the petroleum pipeline licence area of PPA 69 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area.07-Jun-2019
141No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance.07-Jun-2019
151No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance.07-Jun-2019
161The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline.07-Jun-2019
171Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied.07-Jun-2019
181The Licensee's attention is drawn to the existence of File Notation Area subject to Ashburton North Stategic Industrial Area Improvement Scheme - Subject to Western Australian Planning Commision granted pursuant to section 91 of the Land Administration Act 1997 and which is shown designated asFNA 12505 in TENGRAPH.07-Jun-2019 15-Dec-2020
191All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.27-Aug-2024
201The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.27-Aug-2024
211All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.27-Aug-2024

Endorsements

Cond #VerTextStartEnd
12All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, IndustryRegulation and Safety.27-Aug-2024
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.07-Jun-2019 26-Aug-2024
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.07-Jun-2019
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.07-Jun-2019
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.07-Jun-2019
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
07-Jun-2019
61The rights of ingress to and egress from Miscellaneous Licences 08/52 and 08/132 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.07-Jun-2019
71No interference with Geodetic Survey Stations J 84A/102, J 84A/104, J 85A/4, J85A/1,  Yanrey 40 and Yanrey 40T and  and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.07-Jun-2019
81No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.07-Jun-2019
91No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.07-Jun-2019
1In respect to the area designated as CPL 38 in TENGRAPH the following conditions apply:07-Jun-2019 08-Jul-2021
101Prior to any ground-disturbing activity, as defined by the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Resource and Environmental Compliance, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
07-Jun-2019 08-Jul-2021
111The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Resource and Environmental Compliance, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
07-Jun-2019 08-Jul-2021
121Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.07-Jun-2019 08-Jul-2021
131No mining within 25 metres of either side of the petroleum pipeline licence area of PPA 69 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area.07-Jun-2019
141No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance.07-Jun-2019
151No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance.07-Jun-2019
161The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline.07-Jun-2019
171Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied.07-Jun-2019
181The Licensee's attention is drawn to the existence of File Notation Area subject to Ashburton North Stategic Industrial Area Improvement Scheme - Subject to Western Australian Planning Commision granted pursuant to section 91 of the Land Administration Act 1997 and which is shown designated asFNA 12505 in TENGRAPH.07-Jun-2019 15-Dec-2020
191All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.27-Aug-2024
201The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.27-Aug-2024
211All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.27-Aug-2024

Dealings

TypeNumberDetails
Objection491668Lodged:12:06:38 02 August 2016Objectors:YARRI MINING PTY LTDObjection Type:Tenement ApplicationWithdrawn on 9 August, 2016
Objection491812Lodged:15:10:10 04 August 2016Objectors:YARRI MINING PTY LTDObjection Type:Tenement ApplicationRECORDED:15:10:10 04 August 2016WITHDRAWN:10:00 15 December 2017
Application to Amend525623Lodged:09:39:21 15 March 2018Amending:Address (Including DTC Details)From:SQUADRON RESOURCES PTY LTD, 80 BIRDWOOD PARADE, DALKEITH, WA, 6009To:SQUADRON RESOURCES PTY LTD, C/-HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxxx977RECORDED:09:39:21 15 March 2018
Application to Amend531446Lodged:15:47:31 29 May 2018Amending:Address (Including DTC Details)From:SQUADRON RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:SQUADRON RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:15:47:31 29 May 2018
Application to Amend554325Lodged:15:35 21 May 2019Amending:Address (Including DTC Details)From:Principal Place of Business : SQUADRON RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :SQUADRON RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849To:Principal Place of Business : SQUADRON RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :SQUADRON RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxx977RECORDED:15:35 21 May 2019
Application to Amend581636Lodged:11:28:02 08 July 2020Amending:NameFrom:SQUADRON RESOURCES PTY LTDTo:WYLOO METALS PTY LTDREJECTED:11:28:02 08 July 2020
Application to Amend581792Lodged:08:30 10 July 2020Amending:NameFrom:SQUADRON RESOURCES PTY LTDTo:WYLOO METALS PTY LTDRECORDED:08:30 10 July 2020
Application to Amend590133Lodged:14:30 11 November 2020REJECTED:14:30 11 November 2020Relodged:11:12 13 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO METALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :WYLOO METALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxx977To:Principal Place of Business : WYLOO METALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :WYLOO METALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxx977RECORDED:11:12 13 November 2020
Partial Surrender - Voluntary618324Lodged:16:21:12 19 March 2021Surrendered Blocks:HAMERSLEY RANGE 1525 x, z HAMERSLEY RANGE 1596 g, n, s, x HAMERSLEY RANGE 1597 c, d, e, j, k, o, p, u, z HAMERSLEY RANGE 1598 a, f, l, q, v, w, z HAMERSLEY RANGE 1668 c HAMERSLEY RANGE 1669 e, k HAMERSLEY RANGE 1670 a, b, f, g, l, m, r, s, w, x HAMERSLEY RANGE 1740 u, z HAMERSLEY RANGE 1742 b, c, g, h HAMERSLEY RANGE 1812 e, j, k, p, u, z HAMERSLEY RANGE 1813 f, l, m, q, r, s, v, w, x, y HAMERSLEY RANGE 1884 e, k, p, u, z HAMERSLEY RANGE 1885 a, b, c, d, e, f, g, h, j, k, l, m, n, o, p, q, r, s, t, u, v, w, x, y, z HAMERSLEY RANGE 1956 e HAMERSLEY RANGE 1957 a, b, c, d, eSurrendered Total:93 BL.REGISTERED:16:21:12 19 March 2021
Application to Amend633392Lodged:13:18:54 01 October 2021Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO METALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :WYLOO METALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxx977To:Principal Place of Business : WYLOO METALS PTY LTD, 171-173 MOUNTS BAY ROAD, PERTH, WA, 6000, xxxxxxxxx@wyloometals.com, xxxxxxx949 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 3155, BROADWAY NEDLANDS, WA, 6009, xxxxxxxxx@wyloometals.com, xxxxxxx949RECORDED:13:18:54 01 October 2021
Partial Surrender - Voluntary683114Lodged:14:42:19 07 August 2023Surrendered Blocks:HAMERSLEY RANGE 1813 t, u, zSurrendered Total:3 BL.REGISTERED:14:42:19 07 August 2023
Application to Amend688493Lodged:12:09:55 24 October 2023Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO METALS PTY LTD, 171-173 MOUNTS BAY ROAD, PERTH, WA, 6000, xxxxxxxxx@wyloometals.com, xxxxxxx949 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 3155, BROADWAY NEDLANDS, WA, 6009, xxxxxxxxx@wyloometals.com, xxxxxxx949To:Principal Place of Business : WYLOO METALS PTY LTD, LEVEL 1, 8 RICHARDSON STREET, WEST PERTH, WA, 6005, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 1810, WEST PERTH, WA, 6872, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200RECORDED:12:09:55 24 October 2023
Partial Surrender - Voluntary696528Lodged:13:00:10 14 February 2024Surrendered Blocks:HAMERSLEY RANGE 1524 m, r, w HAMERSLEY RANGE 1525 w HAMERSLEY RANGE 1596 b, h, o, t, y HAMERSLEY RANGE 1597 b, h, n, t, y HAMERSLEY RANGE 1668 d, j, o, u, z HAMERSLEY RANGE 1669 d, j, o, p, u, z HAMERSLEY RANGE 1670 q, v HAMERSLEY RANGE 1740 e, k, p HAMERSLEY RANGE 1741 e, k, p HAMERSLEY RANGE 1742 aSurrendered Total:34 BL.REGISTERED:13:00:10 14 February 2024
Extension / Renewal of Term704232Lodged:08:30 16 May 2024Applied For Period:5 YearsRECORDED:08:30 16 May 2024GRANTED:23 July 2024Granted Period:5 YearsTerm Extended To:06/06/2029
Application to Amend720693Lodged:10:36:23 28 November 2024Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO METALS PTY LTD, LEVEL 1, 8 RICHARDSON STREET, WEST PERTH, WA, 6005, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 1810, WEST PERTH, WA, 6872, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200To:Principal Place of Business : WYLOO METALS PTY LTD, LEVEL 8, TOWER 3 CAPITAL SQUARE, 1 SPRING STREET, PERTH, WA, 6000, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 7142, CLOISTERS SQUARE, PERTH, WA, 6850, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200RECORDED:10:36:23 28 November 2024
Application to Amend720697Lodged:10:56:29 28 November 2024Amending:Address (Including DTC Details)FromToREJECTED:10:56:29 28 November 2024
Partial Surrender - Voluntary723760Lodged:13:07 17 January 2025Surrendered Blocks:HAMERSLEY RANGE 1524 g, n, s, x HAMERSLEY RANGE 1525 v HAMERSLEY RANGE 1596 c, j, p, u, z HAMERSLEY RANGE 1597 a, g, m, s, x HAMERSLEY RANGE 1668 e, k, p HAMERSLEY RANGE 1669 c, q, t, v, y HAMERSLEY RANGE 1741 a, d, f, j, l, o, q, u, v, z HAMERSLEY RANGE 1813 aSurrendered Total:34 BL.REGISTERED:13:07 17 January 2025

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202607-May-2025 10815045$9,108.0022 BL17-Jan-2025 $9,108.00$0.00
Rental202517-May-2024 10572555$22,120.0056 BL14-Feb-2024 $22,120.00$0.00
Rental202428-Apr-2023 10353136$25,575.0093 BL19-Mar-2021 $25,575.00$0.00
Rental202309-May-2022 10261266$24,366.0093 BL19-Mar-2021 $24,366.00$0.00
Rental202210-May-2021 10195924$13,113.0093 BL19-Mar-2021 $13,113.00$0.00
Rental202110-Jun-2020 54354028467$25,668.00186 BL07-Jun-2019 $25,668.00$0.00
Rental202007-Jun-2019 (REFUND) 620816607049PERTH$777.00186 BL07-Jun-2019 $24,087.00$0.00
Rental202026-Jul-2016 620816607049$24,864.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$50,000.00false
2025$91,334.00false
2024$123,375.0018-Jul-2024 $150,004.00$67,603.00$0.00$32,765.00$38,896.00$10,740.00$0.00false
2023$139,500.0001-Aug-2023 $450,406.00$408,214.00$0.00$0.00$36,912.00$5,280.00$0.00false
2022$93,000.0025-Jul-2022 $100,764.00$68,844.00$0.00$2,467.00$21,849.00$7,604.00$0.00false
2021$170,500.0028-Jul-2021 $145,367.0062915928-Jul-2021 $170,500.00Granted10-Sep-2021 $73,171.00$0.00$3,203.00$49,383.00$19,610.00$0.00false
2020$186,000.0003-Aug-2020 $223,299.00$157,838.00$0.00$0.00$47,458.00$18,003.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
08-Feb-2018 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2018-03-072018-07-07CLEARED - Expedited Applies2019-06-05192 BL2210S11530E42km S'ly of OnslowWO2018/04662018-06-25WC1999/045Objection Withdrawn Agreement2019-06-05THALANYJI(WCD2008/003)WC1999/045WAD6113/1998falseWCD2008/003116EXISTNo12PilbaraYamatji Marlpa Aboriginal Corporation