Tenement: E08-2861

View on Landtracker Maps (logon required)

Extracted from MTO on 06-Jul-2025 00:19, last changed 28-Jun-2025.

Tenement Summary

Identifier:E 08/2861-IType:Exploration Licence
Status:DeadDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:15 BL
Purposes:Term:5 Years
Markout:Received:26-Jul-2016 11:58
Commence:27-Feb-2017 Expiry:26-Feb-2022

Holders

Company NameSharesTotal Shares
RIO TINTO EXPLORATION PTY LIMITED100100

Applicants on Receival

Company NameSharesTotal Shares
RIO TINTO EXPLORATION PTY LIMITED100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25026-Jul-2016 15.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.27-Feb-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.27-Feb-2017
31Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.27-Feb-2017
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.27-Feb-2017
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
27-Feb-2017
61No interference with Geodetic Survey Stations EDITH and WYLOO 84 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.27-Feb-2017

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.27-Feb-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.27-Feb-2017
31Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.27-Feb-2017
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.27-Feb-2017
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
27-Feb-2017
61No interference with Geodetic Survey Stations EDITH and WYLOO 84 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.27-Feb-2017

Dealings

TypeNumberDetails
Iron Ore Inclusion491212Lodged:12:17 26 July 2016RECORDED:12:17 26 July 2016AUTHORISED:11:29:08 27 February 2017
Application to Amend540255Lodged:14:00 09 October 2018Amending:Address (Including DTC Details)From:Principal Place of Business : RIO TINTO EXPLORATION PTY LIMITED, C/- RIO TINTO IRON ORE, TENURE MANAGEMENT & STRATEGY GPO BOX A42, PERTH, WA, 6837 and DTC :RIO TINTO EXPLORATION PTY LIMITED, C/- RIO TINTO IRON ORE, TENURE MANAGEMENT & STRATEGY GPO BOX A42, PERTH, WA, 6837To:Principal Place of Business : RIO TINTO EXPLORATION PTY LIMITED, 37 BELMONT AVENUE, BELMONT, WA, 6104 and DTC :RIO TINTO EXPLORATION PTY LIMITED, RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 6837, xxxxxxxxxxxxxxxxxxxxxxxxxxxxx@RIOTINTO.COMRECORDED:14:00 09 October 2018
Surrender - Outright546686Lodged:08:30 29 January 2019PENDING

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201914-Dec-2017 8732256311$2,010.0015 BL27-Feb-2017 $2,010.00$0.00
Rental201826-Jul-2016 620813487783$1,942.5015 BL27-Feb-2017 $1,942.50$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2019$20,000.0018-Feb-2019 $13,900.85$8,043.76$0.00$0.00$1,857.09$4,000.00$0.00false
2018$20,000.0029-Mar-2018 $33,865.33$29,387.90$0.00$0.00$4,477.43$0.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
13-Sep-2016 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2016-10-052017-02-05CLEARED - Expedited Applies2017-02-2315 BL22390S11690E114km S'ly of PannawonicaPuutu Kunti Kurrama People and Pinikura People #1 and #2(WCD2015/003)WC2005/004WAD126/2005falseWCD2015/003BOTHNo12PilbaraYamatji Marlpa Aboriginal Corporation