Extracted from MTO on 12-Jul-2025 00:37,
last changed 04-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 11-Sep-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Sep-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Sep-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Sep-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Sep-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 11-Sep-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Sep-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Sep-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Sep-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Sep-2017 | |
Type | Number | Details |
Extension of Time | 492835 | Lodged:14:50:54 24 August 2016Type:Service on PastoralistRECORDED:14:50:54 24 August 2016APPROVED:14:16 30 August 2016 |
Extension of Time | 492855 | Lodged:15:38:54 24 August 2016Type:SecurityRECORDED:15:38:54 24 August 2016APPROVED:14:16 30 August 2016 |
Forfeiture | 542775 | Initiated:16/11/2018 for non-compliance with rent requirementsRECORDED:10:58:17 15 November 2018Notice Issued:Regulation 50 Notice sent 16/11/2018 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:21/12/2018FINALISED:Order by Minister on 11 January 2019 that E 08/2848 be Penalty Imposed |
Fine | 545864 | Fine in respect to:Forfeiture Process 542775Fine reason:Non-compliance with rent obligationsPenalty amount:$219.00Notification date:15/01/2019Due date:19/02/2019Pursuant to:Section 96A(5)RECORDED:15 January 2019PAYMENT RECEIVED:23 January 2019FINALISED:23 January 2019Receipt Number:90595612588Amount:$219.00Remaining balance:$0.00 |
Application to Amend | 560730 | Lodged:14:27:47 14 August 2019Amending:NameFrom:BERKUT MINERALS PTY LTDTo:CARNABY RESOURCES LIMITEDRECORDED:14:27:47 14 August 2019 |
Surrender - Outright | 562683 | Lodged:16:00:28 09 September 2019REGISTERED:16:00:28 09 September 2019 |