Extracted from MTO on 28-Feb-2021 03:36,
last changed 08-Dec-2020.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 04-Apr-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Apr-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Apr-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 04-Apr-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the Licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 04-Apr-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 04-Apr-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Apr-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Apr-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 04-Apr-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the Licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 04-Apr-2017 | |
Type | Number | Details |
Amalgamation | 504541 | Lodged:08:30 13 April 2017Amalgamating:Whole of P 08/563Situated within:External boundaries of E 08/2845Granted 18/10/2017 in respect to P 08/563 |
Caveat | 546488 | Lodged:12:31:46 23 January 2019Caveat Type:Consent CaveatCaveator:OLYNTHOS GROUP PTY LTDShares Caveated:100/100 shares PILBARA STONE PTY LTDRECORDED:12:31:46 23 January 2019WITHDRAWN:14:50:41 07 April 2020 |
Extension of Time | 553919 | Lodged:16:10:49 16 May 2019Type:Form 5RECORDED:16:10:49 16 May 2019APPROVED:16:31:24 16 May 2019Time extended until 7 June 2019 |
Withdrawal of Dealing | 575662 | Lodged:14:50:41 07 April 2020In respect to:Caveat 546488RECORDED:14:50:41 07 April 2020 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
11-May-2017 | Tenement Amalgamation | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2017-05-262017-09-26CLEARED - Expedited Applies2017-10-1123.72 HA232232S1154539E193km N'ly of Gascoyne Junction | | | THUDGARI PEOPLE(WCD2009/002)WC1997/095WAD6212/1998trueWCD2009/002131EXISTYes | | 12PilbaraYamatji Marlpa Aboriginal Corporation |
18-Jul-2016 | Tenement Application | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2016-08-052016-12-05CLEARED - Expedited Applies2017-04-043 BL23230S115460E193km N'ly of Gascoyne Junction | WO2016/06112016-09-19WC1997/095Objection Withdrawn Agreement2017-03-31 | | THUDGARI PEOPLE(WCD2009/002)WC1997/095WAD6212/1998trueWCD2009/002131EXISTYes | | 12PilbaraYamatji Marlpa Aboriginal Corporation |