Extracted from MTO on 04-Mar-2021 04:32,
last changed 27-Jun-2020.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 21-Apr-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 21-Apr-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 21-Apr-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 21-Apr-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 21-Apr-2017 | |
6 | 1 | No interference with Geodetic Survey Station NMF 270 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 21-Apr-2017 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on foreshore, seabed and navigable waters. | 21-Apr-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 21-Apr-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 21-Apr-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 21-Apr-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 21-Apr-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 21-Apr-2017 | |
6 | 1 | No interference with Geodetic Survey Station NMF 270 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 21-Apr-2017 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on foreshore, seabed and navigable waters. | 21-Apr-2017 | |
Type | Number | Details |
Objection | 485662 | Lodged:09:58:05 27 April 2016Objectors:PASTORAL MANAGEMENT PTY LTDObjection Type:Tenement ApplicationRECORDED:09:58:05 27 April 2016WITHDRAWN:10:00 05 October 2016 |
Extension of Time | 485750 | Lodged:11:35 28 April 2016Type:Service on PastoralistRECORDED:11:35 28 April 2016APPROVED:11:00 29 April 2016 |
Partial Surrender - Voluntary | 550118 | Lodged:10:32:32 25 March 2019Surrendered Blocks:HAMERSLEY RANGE 1171 u
HAMERSLEY RANGE 1172 c, d, g, h, l, m
HAMERSLEY RANGE 1243 lSurrendered Total:8 BL.REGISTERED:10:32:32 25 March 2019 |
Forfeiture | 558385 | Initiated:31/07/2019 for non-compliance with reporting requirements( Form 5 )RECORDED:16:09 15 July 2019Notice Issued:Regulation 50 Notice sent 31/07/2019 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:04/09/2019FINALISED:Order by Minister on 02 September 2019 that E 08/2831 be Penalty Imposed |
Fine | 562104 | Fine in respect to:Forfeiture Process 558385Fine reason:Non-compliance with expenditure obligationsPenalty amount:$540.00Notification date:02/09/2019Due date:07/10/2019Pursuant to:Section 96A(5)RECORDED:02 September 2019PAYMENT RECEIVED:09 September 2019FINALISED:09 September 2019Receipt Number:10113955Amount:$540.00Remaining balance:$0.00 |