# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 25-Aug-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 25-Aug-2016 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 25-Aug-2016 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 25-Aug-2016 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 06-Sep-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 25-Aug-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 25-Aug-2016 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 25-Aug-2016 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 25-Aug-2016 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 06-Sep-2017 | |
Type | Number | Details |
Extension of Time | 480437 | Lodged:16:17:42 19 January 2016Type:Service on PastoralistRECORDED:16:17:42 19 January 2016APPROVED:14:00 21 January 2016 |
Extension of Time | 516900 | Lodged:15:07:44 23 October 2017Type:Form 5RECORDED:15:07:44 23 October 2017APPROVED:11:46:55 24 October 2017Time to lodge extended to 01/11/2017 |
Forfeiture | 519656 | Initiated:06/12/2017 for non-compliance with reporting requirementsRECORDED:09:51:45 06 December 2017Notice Issued:Regulation 50 Notice sent 06/12/2017 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:10/01/2018FINALISED:Order by Minister on 23 March 2018 that E 08/2808 be Penalty Imposed |
Fine | 526337 | Fine in respect to:Forfeiture Process 519656Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$180.00Notification date:04/04/2018Due date:09/05/2018Pursuant to:Section 96A(5)RECORDED:23 March 2018PAYMENT RECEIVED:02 May 2018FINALISED:02 May 2018Receipt Number:83273892037Amount:$180.00Remaining balance:$0.00 |
Caveat | 546486 | Lodged:12:31:46 23 January 2019Caveat Type:Consent CaveatCaveator:OLYNTHOS GROUP PTY LTDShares Caveated:100/100 shares PILBARA STONE PTY LTDRECORDED:12:31:46 23 January 2019WITHDRAWN:14:50:41 07 April 2020 |
Extension of Time | 575611 | Lodged:15:39:38 06 April 2020Type:OtherRECORDED:15:39:38 06 April 2020WITHDRAWN:10:31:40 14 April 2020 |
Withdrawal of Dealing | 575662 | Lodged:14:50:41 07 April 2020In respect to:Caveat 546486RECORDED:14:50:41 07 April 2020 |