Extracted from MTO on 11-Jul-2025 00:49,
last changed 10-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-May-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-May-2016 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 30-May-2016 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the Licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 30-May-2016 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licences 08/14 and 08/92 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 30-May-2016 | |
6 | 1 | No interference with Geodetic Survey Stations PW 4, PW 4T, WYLOO 47, WYL 130, WYL 131, WYL 132, WYL 133 and WYL 134 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 30-May-2016 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 30-May-2016 | |
8 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH. | 30-May-2016 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 30-May-2016 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 30-May-2016 | |
11 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 30-May-2016 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP. | 30-May-2016 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 30-May-2016 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 30-May-2016 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 30-May-2016 | |
16 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 13-Apr-2022 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-May-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-May-2016 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 30-May-2016 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the Licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 30-May-2016 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licences 08/14 and 08/92 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 30-May-2016 | |
6 | 1 | No interference with Geodetic Survey Stations PW 4, PW 4T, WYLOO 47, WYL 130, WYL 131, WYL 132, WYL 133 and WYL 134 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 30-May-2016 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 30-May-2016 | |
8 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH. | 30-May-2016 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 30-May-2016 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 30-May-2016 | |
11 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 30-May-2016 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP. | 30-May-2016 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 30-May-2016 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 30-May-2016 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 30-May-2016 | |
16 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 13-Apr-2022 | |
Type | Number | Details |
Application to Amend | 479297 | Lodged:12:58:25 21 December 2015Amending:NameFrom:NORTHERN STAR RESOURCES LIMITEDTo:NORTHERN STAR RESOURCES LTDRECORDED:12:58:25 21 December 2015 |
Application to Amend | 619821 | Lodged:08:30 09 April 2021Amending:Address (Including DTC Details)From:NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904To:NORTHERN STAR RESOURCES LTD, NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxxxxxx@nsrltd.com, xxxxx100RECORDED:08:30 09 April 2021 |
Application to Amend | 619822 | Lodged:08:30 09 April 2021Amending:Address (Including DTC Details)From:NORTHERN STAR RESOURCES LTD, SAME AS CORRESPONDENCETo:NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:08:30 09 April 2021 |
Extension / Renewal of Term | 623488 | Lodged:12:58:15 27 May 2021Applied For Period:5 YearsRECORDED:12:58:15 27 May 2021GRANTED:08 July 2021Granted Period:5 YearsTerm Extended To:29/05/2026 |
Partial Surrender - Compulsory | 647588 | Lodged:11:35:07 21 April 2022Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 2331 k, p
HAMERSLEY RANGE 2332 f, l, m, n, sSurrendered Total:7 BL.REGISTERED:Midnight 29 May 2022Surrendered area to be released 08:30:00 20/06/2022 under Section 65 (3)Surrendered area released 08:30:00 20/06/2022 under Section 65 (3) |
Application to Amend | 652280 | Lodged:14:01:28 27 June 2022Amending:Address (Including DTC Details)From:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904 and DTC :NORTHERN STAR RESOURCES LTD, NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxxxxxx@nsrltd.com, xxxxx100To:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :NORTHERN STAR RESOURCES LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:14:01:28 27 June 2022 |
Application to Amend | 667996 | Lodged:09:35:26 01 February 2023Amending:Address (Including DTC Details)From:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxx997 and DTC :NORTHERN STAR RESOURCES LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxx997To:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- BLACK CAT (PAULSENS) PTY LTD C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :NORTHERN STAR RESOURCES LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- BLACK CAT (PAULSENS) PTY LTD C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:09:35:26 01 February 2023 |
Application to Amend | 709118 | Lodged:15:40 10 July 2024Amending:Address (Including DTC Details)From:Principal Place of Business : BLACK CAT (PAULSENS) PTY LTD, C/MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :BLACK CAT (PAULSENS) PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997To:Principal Place of Business : BLACK CAT (PAULSENS) PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :BLACK CAT (PAULSENS) PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:15:40 10 July 2024 |
Mortgage | 719713 | Lodged:08:32:57 18 November 2024Mortgaged Shares:100/100 shares BLACK CAT (PAULSENS) PTY LTDMortgagee:NORTHERN STAR RESOURCES LTDREGISTERED:08:32:57 18 November 2024DISCHARGED:12:21:17 31 March 2025Mortgage Discharge:729633 Rejected 08:30 31 March 2025Full Discharge:729716 Registered 12:21:17 31 March 2025 |
Mortgage - Discharge | 729633 | Lodged:08:30 31 March 2025In respect to:Mortgage 719713REJECTED:08:30 31 March 2025 |
Mortgage - Discharge | 729716 | Lodged:12:21:17 31 March 2025In respect to:Mortgage 719713REGISTERED:12:21:17 31 March 2025 |