Extracted from MTO on 28-Jun-2025 00:18,
last changed 28-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-Jul-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-Jul-2016 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-Jul-2016 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-Jul-2016 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-Jul-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-Jul-2016 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-Jul-2016 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-Jul-2016 | |
Type | Number | Details |
Iron Ore Inclusion | 478548 | Lodged:08:30 06 November 2015RECORDED:08:30 07 December 2015AUTHORISED:10:00:20 06 July 2016 |
Application to Amend | 540255 | Lodged:14:00 09 October 2018Amending:Address (Including DTC Details)From:Principal Place of Business : RIO TINTO EXPLORATION PTY LIMITED, SAME AS CORRESPONDENCE and DTC :RIO TINTO EXPLORATION PTY LIMITED, C/- RIO TINTO IRON ORE, TENURE MANAGEMENT & STRATEGY GPO BOX A42, PERTH, WA, 6837To:Principal Place of Business : RIO TINTO EXPLORATION PTY LIMITED, 37 BELMONT AVENUE, BELMONT, WA, 6104 and DTC :RIO TINTO EXPLORATION PTY LIMITED, RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 6837, xxxxxxxxxxxxxxxxxxxxxxxxxxxxx@RIOTINTO.COMRECORDED:14:00 09 October 2018 |
Surrender - Outright | 546684 | Lodged:08:30 29 January 2019REGISTERED:08:30 29 January 2019 |