Extracted from MTO on 02-Jul-2025 01:20,
last changed 02-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 23-Feb-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-Feb-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-Feb-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 23-Feb-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 23-Feb-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 23-Feb-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-Feb-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-Feb-2017 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 23-Feb-2017 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 23-Feb-2017 | |
Type | Number | Details |
Application to Amend | 497873 | Lodged:12:48:26 30 November 2016Amending:Address (Including DTC Details)From:Principal Place of Business : AUSTRALIAN COPPER PTY LTD, SAME AS CORRESPONDENCE and DTC :AUSTRALIAN COPPER PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Principal Place of Business : AUSTRALIAN COPPER PTY LTD, C/- KORAB RESOURCES LTD, P.O. BOX 1958, WEST PERTH, WA, 6872, xxxxxx@korab.com.au, xxxxxxx166 and DTC :AUSTRALIAN COPPER PTY LTD, C/- KORAB RESOURCES LTD, C/- KORAB RESOURCES LTD, P.O. BOX 1958, WEST PERTH, WA, 6872, xxxxxx@korab.com.au, xxxxxxx166RECORDED:12:48:26 30 November 2016 |
Extension of Time | 530132 | Lodged:12:53:47 14 May 2018Type:Form 5RECORDED:12:53:47 14 May 2018APPROVED:14:03:29 14 May 2018 |
Extension of Time | 577237 | Lodged:14:43:27 04 May 2020Type:Form 5RECORDED:14:43:27 04 May 2020APPROVED:14:28:26 19 May 2020 |
Extension / Renewal of Term | 641857 | Lodged:11:23:35 21 February 2022Applied For Period:5 YearsRECORDED:11:23:35 21 February 2022GRANTED:28 April 2022Granted Period:5 YearsTerm Extended To:22/02/2027 |
Extension of Time | 642967 | Lodged:11:10:48 08 March 2022Type:OtherRECORDED:11:10:48 08 March 2022APPROVED:08:59:54 09 March 2022Time to lodged extended to COB 21 March 2022 |
Extension of Time | 645246 | Lodged:14:32:16 21 March 2022Type:OtherRECORDED:14:32:16 21 March 2022APPROVED:13:07:11 22 March 2022Time to lodge extended to COB 28 March 2022 |
Extension of Time | 645816 | Lodged:11:12:44 28 March 2022Type:OtherRECORDED:11:12:44 28 March 2022APPROVED:13:06:17 28 March 2022Time to lodge extened to COB 29 March 2022 |
Application for Forfeiture | 707904 | Lodged:11:47:31 27 June 2024Applicant:HAWKER, Andrew JamesRespondent:AUSTRALIAN COPPER PTY LTDRECORDED:11:47:31 27 June 2024Warden's Determination:Dismissed 02/09/2024 10:00:001. Forfeiture application 707904 be dismissed. 2. The mention listed at 10:00am on 2 September 2024 be vacated. 3. There be no orders as to costs.Warden:McPhee |
Surrender - Outright | 708066 | Lodged:14:19:23 28 June 2024REGISTERED:14:19:23 28 June 2024 |