Extracted from MTO on 02-Jul-2025 00:49,
last changed 02-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 18-Apr-2023 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Apr-2023 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Apr-2023 | |
4 | 1 | The Licensee making verbal or written contact with the holder of any underlying pastoral or grazing lease within a reasonable time prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Apr-2023 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Apr-2023 | |
6 | 1 | The Lessee shall, as soon as practibale but in any event within 48 hours, either in writing or by telephone, as the case requires, report to the holder of the underlying pastoral lease any damage caused by the Lessee to pastoral improvements on the underlying pastoral lease. | 18-Apr-2023 | |
7 | 1 | No interference with the optic fibre cable or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 18-Apr-2023 | |
8 | 1 | No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 18-Apr-2023 | |
9 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 18-Apr-2023 | |
| 1 | The licence encroaches onto the Dampier to Bunbury Natural Gas Pipeline and the licnecee's attention is drawn to the following: | 18-Apr-2023 | |
10 | 1 | No mining within 25 metres of either side of the petroleum pipeline licence area of FNA13597 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area. | 18-Apr-2023 | |
11 | 1 | No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 18-Apr-2023 | |
12 | 1 | No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 18-Apr-2023 | |
13 | 1 | The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline. | 18-Apr-2023 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied. | 18-Apr-2023 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 18-Apr-2023 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Apr-2023 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Apr-2023 | |
4 | 1 | The Licensee making verbal or written contact with the holder of any underlying pastoral or grazing lease within a reasonable time prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Apr-2023 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Apr-2023 | |
6 | 1 | The Lessee shall, as soon as practibale but in any event within 48 hours, either in writing or by telephone, as the case requires, report to the holder of the underlying pastoral lease any damage caused by the Lessee to pastoral improvements on the underlying pastoral lease. | 18-Apr-2023 | |
7 | 1 | No interference with the optic fibre cable or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 18-Apr-2023 | |
8 | 1 | No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 18-Apr-2023 | |
9 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 18-Apr-2023 | |
| 1 | The licence encroaches onto the Dampier to Bunbury Natural Gas Pipeline and the licnecee's attention is drawn to the following: | 18-Apr-2023 | |
10 | 1 | No mining within 25 metres of either side of the petroleum pipeline licence area of FNA13597 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area. | 18-Apr-2023 | |
11 | 1 | No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 18-Apr-2023 | |
12 | 1 | No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 18-Apr-2023 | |
13 | 1 | The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline. | 18-Apr-2023 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied. | 18-Apr-2023 | |
Type | Number | Details |
Iron Ore Inclusion | 472572 | Lodged:14:55 02 July 2015RECORDED:15:55 02 July 2015AUTHORISED:15:55 02 July 2015 |
Objection | 471682 | Lodged:14:46:02 22 July 2015Objectors:PASTORAL MANAGEMENT PTY LTDObjection Type:Tenement ApplicationRECORDED:14:46:02 22 July 2015Minute of Programming Directions Lodged to finalise the objectionFINALISED:10:00 15 February 2018Wardens Decision Made on:10:00 15 February 2018Wardens Decision Status:Finalised |
Application to Amend | 522059 | Lodged:11:42:57 22 January 2018Amending:Address (Including DTC Details)From:Principal Place of Business : AMCI (IO) PTY LTD, SAME AS CORRESPONDENCE and DTC :AMCI (IO) PTY LTD, L 1 1 PRESTON ST, COMO, WA, 6152To:Principal Place of Business : AMCI (IO) PTY LTD, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :AMCI (IO) PTY LTD, C/- API MANAGEMENT PTY LTD, PO BOX 7361, CLOSITERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222RECORDED:11:42:57 22 January 2018 |
Application to Amend | 522063 | Lodged:11:57:01 22 January 2018Amending:Address (Including DTC Details)From:Principal Place of Business : AQUILA STEEL PTY LTD, SAME AS CORRESPONDENCE and DTC :AQUILA STEEL PTY LTD, L 1 1 PRESTON ST, COMO, WA, 6152To:Principal Place of Business : AQUILA STEEL PTY LTD, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :AQUILA STEEL PTY LTD, C/- API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222RECORDED:11:57:01 22 January 2018 |
Application to Amend | 690948 | Lodged:11:39:22 28 November 2023Amending:Address (Including DTC Details)From:AQUILA STEEL PTY LTD, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222To:AQUILA STEEL PTY LTD, C/- API MANAGEMENT PTY LTD, LEVEL 18, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222RECORDED:11:39:22 28 November 2023 |
Application to Amend | 690949 | Lodged:11:39:22 28 November 2023Amending:Address (Including DTC Details)From:AMCI (IO) PTY LTD, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222To:AMCI (IO) PTY LTD, C/- API MANAGEMENT PTY LTD, LEVEL 18, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222RECORDED:11:39:22 28 November 2023 |
Surrender - Outright | 699422 | Lodged:13:54:13 21 March 2024REGISTERED:13:54:13 21 March 2024 |