Extracted from MTO on 29-Jun-2025 00:54,
last changed 29-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Jul-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Jul-2016 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Jul-2016 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Jul-2016 | |
| 1 | In respect to the area designated as CPL 34 in TENGRAPH the following conditions apply: | 18-Jul-2016 | |
5 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 18-Jul-2016 | |
6 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 18-Jul-2016 | |
7 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 18-Jul-2016 | |
8 | 1 | In respect of the area covered by this licence if the Jurruru People (being the applicants in Federal Court Application No. WC2000/008) send a request by pre-paid post to the licencee's or agents address, not more than ninety days after the grant of this licence, the licencee shall within thirty days of the request execute in favour of the Jurruru People the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatji Marlpa Aboriginal Corporation. | 18-Jul-2016 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Jul-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Jul-2016 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Jul-2016 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Jul-2016 | |
| 1 | In respect to the area designated as CPL 34 in TENGRAPH the following conditions apply: | 18-Jul-2016 | |
5 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 18-Jul-2016 | |
6 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 18-Jul-2016 | |
7 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 18-Jul-2016 | |
8 | 1 | In respect of the area covered by this licence if the Jurruru People (being the applicants in Federal Court Application No. WC2000/008) send a request by pre-paid post to the licencee's or agents address, not more than ninety days after the grant of this licence, the licencee shall within thirty days of the request execute in favour of the Jurruru People the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatji Marlpa Aboriginal Corporation. | 18-Jul-2016 | |
Type | Number | Details |
Extension of Time | 587354 | Lodged:16:25 29 September 2020Type:Form 5RECORDED:16:25 29 September 2020APPROVED:11:19:01 20 November 2020 |
Extension of Time | 589800 | Lodged:16:25 06 November 2020Type:Exemption from ExpenditureRECORDED:16:25 06 November 2020WITHDRAWN:08:33 13 November 2020 |
Extension of Time | 590321 | Lodged:15:55 12 November 2020Type:Exemption from ExpenditureRECORDED:15:55 12 November 2020APPROVED:15:26 19 November 2020 |
Surrender - Outright | 628061 | Lodged:14:25:08 13 July 2021REGISTERED:14:25:08 13 July 2021 |