Extracted from MTO on 11-Jul-2025 00:43,
last changed 04-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 26-Apr-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 26-Apr-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 26-Apr-2019 | |
4 | 1 | The holder notifying the lessee of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, at least 20 Business Days prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.
| 26-Apr-2019 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 26-Apr-2019 | |
6 | 1 | To construct a fence around all wells, bores, storage tanks, pumping stations and any other installations as determined by the Environmental Officer, Department of Mines, Industry Regulation and Safety (DMIRS) having such dimensions and to be constructed of such materials and be of such standard as determined by the Environmental Officer, DMIRS. | 26-Apr-2019 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence L08/70 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 26-Apr-2019 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Foreshore, Seabed and Navigable Waters. | 26-Apr-2019 | |
9 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 26-Apr-2019 | |
10 | 1 | Consent to explore on Temporary Reserve 70/5350 granted by the Minister responsible for the Mining Act 1978. | 26-Apr-2019 | |
11 | 1 | No mining within 25 metres of either side of the petroleum pipeline licence area of Nos 16, 19, 20, 103 and 110 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area. | 26-Apr-2019 | |
12 | 1 | No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 26-Apr-2019 | |
13 | 1 | No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 26-Apr-2019 | |
14 | 1 | The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline. | 26-Apr-2019 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied. | 26-Apr-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 26-Apr-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 26-Apr-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 26-Apr-2019 | |
4 | 1 | The holder notifying the lessee of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, at least 20 Business Days prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.
| 26-Apr-2019 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 26-Apr-2019 | |
6 | 1 | To construct a fence around all wells, bores, storage tanks, pumping stations and any other installations as determined by the Environmental Officer, Department of Mines, Industry Regulation and Safety (DMIRS) having such dimensions and to be constructed of such materials and be of such standard as determined by the Environmental Officer, DMIRS. | 26-Apr-2019 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence L08/70 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 26-Apr-2019 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Foreshore, Seabed and Navigable Waters. | 26-Apr-2019 | |
9 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 26-Apr-2019 | |
10 | 1 | Consent to explore on Temporary Reserve 70/5350 granted by the Minister responsible for the Mining Act 1978. | 26-Apr-2019 | |
11 | 1 | No mining within 25 metres of either side of the petroleum pipeline licence area of Nos 16, 19, 20, 103 and 110 and to a depth of 50 metres being the Consultation Area as shown in TENGRAPH, without the mining tenement holder and the petroleum pipeline licensee consulting with each other and reaching agreement on access and mining activities to be undertaken within the Consultation Area. | 26-Apr-2019 | |
12 | 1 | No surface excavation approaching closer to the boundary of the Consultation Area than a distance equal to three times the depth of the excavation without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 26-Apr-2019 | |
13 | 1 | No explosives being used or stored within 150 metres of the petroleum licence area without the mining tenement holder and the petroleum pipeline licensee reaching agreement as to a lesser distance. | 26-Apr-2019 | |
14 | 1 | The rights of ingress to and egress from the petroleum pipeline licence area being at all times preserved for the employees, contractors and agents of the owners and operators of the pipeline. | 26-Apr-2019 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purposes of protecting the pipeline and any existing condition imposed for this purpose may be cancelled or varied. | 26-Apr-2019 | |
Type | Number | Details |
Objection | 465312 | Lodged:14:19:16 09 April 2015Objectors:FORREST AND FORREST PTY LTDObjection Type:Tenement ApplicationRECORDED:14:19:16 09 April 2015received minute of programming directions dated 2 September 2016 to finalise objection.FINALISED:10:00 10 March 2017Wardens Decision Made on:10:00 10 March 2017Wardens Decision Status:Finalised |
Objection | 465957 | Lodged:13:18:35 20 April 2015Objectors:BHP BILLITON PETROLEUM (AUSTRALIA) PTY. LTD. (ACN 006923879)Objection Type:Tenement ApplicationRECORDED:13:18:35 20 April 2015WITHDRAWN:10:00 20 July 2016 |
Objection | 466630 | Lodged:15:43:49 30 April 2015Objectors:QUARRY PARK PTY LTDObjection Type:Tenement ApplicationRECORDED:15:43:49 30 April 2015WITHDRAWN:10:00 30 July 2015 |
Extension of Time | 490589 | Lodged:11:30 07 July 2016Type:ObjectionRECORDED:11:30 07 July 2016APPROVED:10:00 12 July 2016 |
Objection | 490527 | Lodged:10:10 13 July 2016Objectors:DDGT PTY LTDObjection Type:Tenement ApplicationRECORDED:10:10 13 July 2016received minute of programming directions dated 19 January 2017 to finalise objectionsFINALISED:10:00 10 March 2017Wardens Decision Made on:10:00 10 March 2017Wardens Decision Status:Finalised |
Objection | 490528 | Lodged:10:10 13 July 2016Objectors:DBP DEVELOPMENT GROUP NOMINEES PTY LIMITEDObjection Type:Tenement ApplicationRECORDED:10:10 13 July 2016received minute of programming directions dated 19 January 2017 to finalise objectionsFINALISED:10:00 10 March 2017Wardens Decision Made on:10:00 10 March 2017Wardens Decision Status:Finalised |
Objection | 490529 | Lodged:10:10 13 July 2016Objectors:DDG ASHBURTON PTY LIMITEDObjection Type:Tenement ApplicationRECORDED:10:10 13 July 2016received minute of programming directions dated 19 January 2017 to finalise objectionsFINALISED:10:00 10 March 2017Wardens Decision Made on:10:00 10 March 2017Wardens Decision Status:Finalised |
Objection | 490530 | Lodged:10:10 13 July 2016Objectors:DDG OPERATIONS PTY LTDObjection Type:Tenement ApplicationRECORDED:10:10 13 July 2016received minute of programming directions dated 19 January 2017 to finalise objectionsFINALISED:10:00 10 March 2017Wardens Decision Made on:10:00 10 March 2017Wardens Decision Status:Finalised |
Objection | 504672 | Lodged:14:38 18 April 2017Objectors:ONSLOW PREMIUM SANDS PTY LTDObjection Type:Tenement ApplicationREJECTED:14:38 18 April 2017 |
Application to Amend | 555678 | Lodged:12:05:07 07 June 2019Amending:NameFrom:ASHBURTON SALT PTY LTDTo:K PLUS S SALT AUSTRALIA PTY LTDRECORDED:12:05:07 07 June 2019 |
Partial Surrender - Voluntary | 564592 | Lodged:16:15:08 11 October 2019Surrendered Blocks:HAMERSLEY RANGE 1594 p
HAMERSLEY RANGE 1666 jSurrendered Total:2 BL.REGISTERED:16:15:08 11 October 2019Surrendered area pursuant to Section 95A for that portion of Hamersley Range blocks 1594: k, p, t, y and 1666: d, h, j shaded red on the plan attached to the partial surrender document. |
Conversion | 631401 | New Tenement:M 08/535Application Date:14:45 28 Jun 2021Section:S67 |
Partial Surrender - Voluntary | 678155 | Lodged:11:34:36 09 June 2023Surrendered Blocks:HAMERSLEY RANGE 1520 z
HAMERSLEY RANGE 1523 t, x, y
HAMERSLEY RANGE 1595 b, c, dSurrendered Total:7 BL.REGISTERED:11:34:36 09 June 2023 |
Partial Surrender - Voluntary | 702127 | Lodged:08:30 24 April 2024Surrendered Blocks:HAMERSLEY RANGE 1521 v
HAMERSLEY RANGE 1594 t, y
HAMERSLEY RANGE 1666 dSurrendered Total:4 BL.REGISTERED:08:30 24 April 2024 |
Extension / Renewal of Term | 702131 | Lodged:08:30 24 April 2024Applied For Period:5 YearsRECORDED:08:30 24 April 2024GRANTED:24 June 2024Granted Period:5 YearsTerm Extended To:25/04/2029 |
Surrender - Outright | 735888 | Lodged:14:06 16 June 2025REGISTERED:14:06 16 June 2025 |