Extracted from MTO on 08-Jul-2025 00:36,
last changed 30-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Sep-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 29-Sep-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Sep-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Sep-2015 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Sep-2015 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the Licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Sep-2015 | |
7 | 1 | No interference with Geodetic Survey Station SSM-NMF 560 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-Sep-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Sep-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 29-Sep-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Sep-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Sep-2015 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Sep-2015 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the Licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Sep-2015 | |
7 | 1 | No interference with Geodetic Survey Station SSM-NMF 560 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-Sep-2015 | |
Type | Number | Details |
Application to Amend | 488216 | Lodged:11:30 10 June 2016Amending:NameFrom:RED EARTH RESOURCES PTY LTDTo:MINERAL DEVELOPMENTS PTY LTDRECORDED:11:30 10 June 2016 |
Application to Amend | 535558 | Lodged:15:20 20 July 2018Amending:Address (Including DTC Details)From:Principal Place of Business : MINERAL DEVELOPMENTS PTY LTD, ADDRESS NOT PROVIDED and DTC :MINERAL DEVELOPMENTS PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024To:Principal Place of Business : MINERAL DEVELOPMENTS PTY LTD, LEVEL 1, ALTONA STREET, WEST PERTH, WA, 6005 and DTC :MINERAL DEVELOPMENTS PTY LTD, MARCO TENTORI, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxxx@atmwa.net.au, xxxxxxxxx095RECORDED:15:20 20 July 2018 |
Licence Instrument | 562059 | Lodged:15:57:11 30 August 2019ISSUED:07:49:41 17 September 2019 |
Surrender - Outright | 564393 | Lodged:16:28:13 08 October 2019REJECTED:16:28:13 08 October 2019 |
Surrender - Outright | 565914 | Lodged:13:59:06 01 November 2019REGISTERED:13:59:06 01 November 2019 |