Tenement: E08-2665

View on Landtracker Maps (logon required)

Extracted from MTO on 01-Jul-2025 00:49, last changed 01-Jul-2025.

Tenement Summary

Identifier:E 08/2665Type:Exploration Licence
Status:DeadDistrict:ASHBURTON M.F.
Lodged:PERTHArea:115 BL
Purposes:Term:5 Years
Markout:Received:05-Dec-2014 09:00
Commence:12-Apr-2016 Expiry:11-Apr-2021

Holders

Company NameSharesTotal Shares
CAULDRON ENERGY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
CAULDRON ENERGY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25005-Dec-2014 100.00000 BL
CARNARVON SHIRE154005-Dec-2014 15.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Apr-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Apr-2016
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Apr-2016
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Apr-2016
51No interference with Geodetic Survey Stations SSM-WINNING POOL 13 to 20 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.12-Apr-2016
61No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.12-Apr-2016
71The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Natural Gas Pipeline Purposes Reserves 41171 and 41172.12-Apr-2016
81No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No PL 40  as shown in TENGRAPH.12-Apr-2016
91No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP12-Apr-2016
101No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.12-Apr-2016
111The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP12-Apr-2016
121No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.12-Apr-2016
131Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .12-Apr-2016
141The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.12-Apr-2016
151Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.12-Apr-2016
161Mining on a strip of land 20 metres wide with any water pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.12-Apr-2016

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Apr-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Apr-2016
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Apr-2016
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Apr-2016
51No interference with Geodetic Survey Stations SSM-WINNING POOL 13 to 20 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.12-Apr-2016
61No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.12-Apr-2016
71The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Natural Gas Pipeline Purposes Reserves 41171 and 41172.12-Apr-2016
81No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No PL 40  as shown in TENGRAPH.12-Apr-2016
91No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP12-Apr-2016
101No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.12-Apr-2016
111The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP12-Apr-2016
121No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.12-Apr-2016
131Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .12-Apr-2016
141The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.12-Apr-2016
151Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.12-Apr-2016
161Mining on a strip of land 20 metres wide with any water pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.12-Apr-2016

Dealings

TypeNumberDetails
Application to Amend512344Lodged:13:48:12 10 August 2017Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, SAME AS CORRESPONDENCE and DTC :CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901To:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, NGAIRE KOCH, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555RECORDED:13:48:12 10 August 2017
Application to Amend524209Lodged:15:11:18 21 February 2018Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, NGAIRE KOCH, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555To:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555RECORDED:15:11:18 21 February 2018
Surrender - Outright556073Lodged:13:38:20 13 June 2019REGISTERED:13:38:20 13 June 2019

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202006-May-2019 10094952$25,300.00115 BL12-Apr-2016 $25,300.00$0.00
Rental201918-Apr-2018 (REFUND) FIL-1462$99,590.00115 BL12-Apr-2016 $15,410.00$0.00
Rental201918-Apr-2018 PAYMENT 2671 CAULDRON ENERGY$115,000.00
Rental201823-Mar-2017 MT-210010991014-EF$14,892.50115 BL12-Apr-2016 $14,892.50$0.00
Rental201705-Dec-2014 06-141167PERTH$14,041.50115 BL12-Apr-2016 $14,041.50$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2020$43,125.00false
2019$115,000.00false
2018$115,000.0008-Jun-2018 $56,233.6953225007-Jun-2018 $115,000.00Granted16-Jul-2018 $17,815.14$0.00$0.00$29,046.27$9,372.28$0.00false
2017$115,000.0017-May-2017 $44,730.3950653918-May-2017 $115,000.00Granted29-Jun-2017 $8,701.01$0.00$0.00$30,279.38$5,750.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
14-Jan-2015 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-01-282015-05-28CLEARED - Expedited Applies2016-04-11115 BL232029S115230E132km E'ly of Coral BayWO2015/01612015-02-12WC1997/028Objection Withdrawn Agreement2016-04-08WO2015/01602015-02-12WC2004/005Objection Withdrawn Agreement2016-04-08Budina People(WC2004/005)WC2004/005WAD131/2004falseDeterminedGnulli(WC1997/028)WC1997/028WAD6161/1998falseDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation12PilbaraYamatji Marlpa Aboriginal Corporation