Extracted from MTO on 04-Jul-2025 00:44,
last changed 04-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 05-Nov-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 05-Nov-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Nov-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Nov-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Nov-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Nov-2015 | |
7 | 1 | No interference with Geodetic Survey Stations WYL 126 and WYL 135 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 05-Nov-2015 | |
8 | 1 | No mining within 25 metres of either side of the Goldfields Gas pipeline (PL 24) as shown in TENGRAPH. | 05-Nov-2015 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 05-Nov-2015 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 05-Nov-2015 | |
11 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 05-Nov-2015 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the Director Petroleum DMP. | 05-Nov-2015 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 05-Nov-2015 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 05-Nov-2015 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 05-Nov-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 05-Nov-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 05-Nov-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Nov-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Nov-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Nov-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Nov-2015 | |
7 | 1 | No interference with Geodetic Survey Stations WYL 126 and WYL 135 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 05-Nov-2015 | |
8 | 1 | No mining within 25 metres of either side of the Goldfields Gas pipeline (PL 24) as shown in TENGRAPH. | 05-Nov-2015 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 05-Nov-2015 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 05-Nov-2015 | |
11 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 05-Nov-2015 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the Director Petroleum DMP. | 05-Nov-2015 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 05-Nov-2015 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 05-Nov-2015 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 05-Nov-2015 | |
Type | Number | Details |
Application to Amend | 476104 | Lodged:15:29:07 19 October 2015Amending:AddressFrom:NORTHERN STAR RESOURCES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:15:29:07 19 October 2015 |
Partial Surrender - Voluntary | 477272 | Lodged:12:39:37 11 November 2015Surrendered Blocks:HAMERSLEY RANGE 2185 o, p, t, u, ySurrendered Total:5 BL.REGISTERED:12:39:37 11 November 2015 |
Forfeiture | 500341 | Initiated:17/01/2017 for non-compliance with expenditure conditionsRECORDED:12:00 25 January 2017Notice Issued:Regulation 50 Notice sent 17/01/2017 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:21/02/2017FINALISED:Order by Minister on 30 March 2017 that E 08/2655 be Penalty Imposed |
Fine | 503960 | Fine in respect to:Forfeiture Process 500341Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,318.00Notification date:04/04/2017Due date:09/05/2017Pursuant to:Section 96A(5)RECORDED:05 April 2017PAYMENT RECEIVED:01 May 2017FINALISED:01 May 2017Receipt Number:06-160149Amount:$1,318.00Remaining balance:$0.00 |
Extension / Renewal of Term | 588608 | Lodged:11:08:22 21 October 2020Applied For Period:5 YearsRECORDED:11:08:22 21 October 2020GRANTED:27 January 2021Granted Period:5 YearsTerm Extended To:04/11/2025 |
Application to Amend | 619821 | Lodged:08:30 09 April 2021Amending:Address (Including DTC Details)From:NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904To:NORTHERN STAR RESOURCES LTD, NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxxxxxx@nsrltd.com, xxxxx100RECORDED:08:30 09 April 2021 |
Application to Amend | 619822 | Lodged:08:30 09 April 2021Amending:Address (Including DTC Details)From:NORTHERN STAR RESOURCES LTD, SAME AS CORRESPONDENCETo:NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:08:30 09 April 2021 |
Application to Amend | 652280 | Lodged:14:01:28 27 June 2022Amending:Address (Including DTC Details)From:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904 and DTC :NORTHERN STAR RESOURCES LTD, NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxxxxxx@nsrltd.com, xxxxx100To:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :NORTHERN STAR RESOURCES LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:14:01:28 27 June 2022 |
Application to Amend | 667996 | Lodged:09:35:26 01 February 2023Amending:Address (Including DTC Details)From:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxx997 and DTC :NORTHERN STAR RESOURCES LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxx997To:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- BLACK CAT (PAULSENS) PTY LTD C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :NORTHERN STAR RESOURCES LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- BLACK CAT (PAULSENS) PTY LTD C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:09:35:26 01 February 2023 |
Application to Amend | 709118 | Lodged:15:40 10 July 2024Amending:Address (Including DTC Details)From:Principal Place of Business : BLACK CAT (PAULSENS) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :BLACK CAT (PAULSENS) PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997To:Principal Place of Business : BLACK CAT (PAULSENS) PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :BLACK CAT (PAULSENS) PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:15:40 10 July 2024 |
Surrender - Outright | 717392 | Lodged:14:52:17 18 October 2024REGISTERED:14:52:17 18 October 2024 |