Extracted from MTO on 02-Jul-2025 01:13,
last changed 02-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 03-Jul-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 03-Jul-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Jul-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Jul-2015 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Jul-2015 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Jul-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 03-Jul-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 03-Jul-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Jul-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Jul-2015 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Jul-2015 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Jul-2015 | |
Type | Number | Details |
Iron Ore Inclusion | 457504 | Lodged:12:20 11 November 2014RECORDED:12:20 11 November 2014AUTHORISED:00:00 03 July 2015 |
Forfeiture | 497326 | Initiated:17/11/2016 for non-compliance with expenditure conditionsRECORDED:11:58 22 November 2016Notice Issued:Regulation 50 Notice sent 17/11/2016 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:22/12/2016FINALISED:Order by Minister on 31 January 2017 that E 08/2653-I be Penalty Imposed |
Fine | 500533 | Fine in respect to:Forfeiture Process 497326Fine reason:Non-compliance with expenditure obligationsPenalty amount:$2,491.00Notification date:07/02/2017Due date:14/03/2017Pursuant to:Section 96A(5)RECORDED:31 January 2017PAYMENT RECEIVED:15 February 2017FINALISED:15 February 2017Receipt Number:06-158726Amount:$2,491.00Remaining balance:$0.00 |
Forfeiture | 542469 | Initiated:06/11/2018 for non-compliance with expenditure conditionsRECORDED:14:30 09 November 2018Notice Issued:Regulation 50 Notice sent 06/11/2018 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:11/12/2018FINALISED:Order by Minister on 18 December 2018 that E 08/2653-I be Penalty Imposed |
Fine | 544899 | Fine in respect to:Forfeiture Process 542469Fine reason:Non-compliance with expenditure obligationsPenalty amount:$5,350.00Notification date:18/12/2018Due date:22/01/2019Pursuant to:Section 96A(5)RECORDED:18 December 2018PAYMENT RECEIVED:27 December 2018FINALISED:03 January 2019Receipt Number:89723676394Amount:$5,350.00Remaining balance:$0.00 |
Surrender - Outright | 556684 | Lodged:13:59:30 21 June 2019REGISTERED:13:59:30 21 June 2019 |