# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Sep-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 29-Sep-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Sep-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Sep-2015 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Sep-2015 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Sep-2015 | |
7 | 1 | No interference with Geodetic Survey Station J 84A/106 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-Sep-2015 | |
8 | 1 | No exploration being carried out on that portion of land designated FNA 12076 in Tengraph (being Public Access Route Urala Station) that impedes community access. | 29-Sep-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Sep-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 29-Sep-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Sep-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Sep-2015 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Sep-2015 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Sep-2015 | |
7 | 1 | No interference with Geodetic Survey Station J 84A/106 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 29-Sep-2015 | |
8 | 1 | No exploration being carried out on that portion of land designated FNA 12076 in Tengraph (being Public Access Route Urala Station) that impedes community access. | 29-Sep-2015 | |
Type | Number | Details |
Objection | 455365 | Lodged:10:11:10 26 September 2014Objectors:BHP BILLITON (AUSTRALIA) PTY LTDObjection Type:Tenement ApplicationRECORDED:10:11:10 26 September 2014WITHDRAWN:10:00 06 March 2015 |
Objection | 455627 | Lodged:14:01 02 October 2014Objectors:SHIRE OF ASHBURTONObjection Type:Tenement ApplicationRECORDED:14:01 02 October 2014filed Minute of Consent dated 17 december 2014 to finalise objection.FINALISED:10:30 27 March 2015Wardens Decision Made on:10:30 27 March 2015Wardens Decision Status:Finalised |
Application to Amend | 476398 | Lodged:10:06:25 26 October 2015Amending:AddressFrom:SLATER, Anthony Warren, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:SLATER, Anthony Warren, SUITE G5, 49 MELVILLE PDE, SOUTH PERTH, WA, 6151RECORDED:10:06:25 26 October 2015 |
Application to Amend | 509740 | Lodged:14:39:13 04 July 2017Amending:Address (Including DTC Details)From:Principal Residence : SLATER, Anthony Warren, SAME AS CORRESPONDENCE and DTC :SLATER, Anthony Warren, SUITE G5, 49 MELVILLE PDE, SOUTH PERTH, WA, 6151To:Principal Residence : SLATER, Anthony Warren, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxx866 and DTC :SLATER, Anthony Warren, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxx866RECORDED:14:39:13 04 July 2017 |
Caveat | 566342 | Lodged:15:48 08 November 2019Caveat Type:Absolute CaveatCaveator:ASHBURTON MINERAL RESOURCES PTY LTDShares Caveated:100/100 shares SLATER, Anthony WarrenRECORDED:15:48 08 November 2019REMOVED:By Order of Warden, John O' Sullivan 11 September 2020 |
Plaint | 577031 | Lodged:11:48:39 30 April 2020Plaintiffs:QUARRY PARK PTY LTD, SLATER, Anthony WarrenRespondents:ASHBURTON MINERAL RESOURCES PTY LTDRECORDED:11:48:39 30 April 2020Warden's Determination:Finalised 10:00 21 September 2020The Plaint was Finalised based on the Minute of consent orders lodged by both parties dated 11 September 2020 where
1. The following caveats be removed by consent:
(a) Caveat 566341 affecting E08/2328
(b) Caveat 566344 affecting E08/2329
(c) Caveat 566342 affecting E08/2642
(d) Caveat 566364 affecting M08/487; and
(e) Caveat 566353 affectingL08/71
2. There be no order as to costs, save for the costs orders made by the Warden on 19 June 2020, 3 July 2020, 31 July 2020 and 27 August 2020.
Which was approved by the Warden on the 21 September 2020 |
Extension / Renewal of Term | 587195 | Lodged:15:12:05 25 September 2020Applied For Period:2 YearsRECORDED:15:12:05 25 September 2020GRANTED:30 November 2020Granted Period:5 YearsTerm Extended To:28/09/2025 |
Caveat | 671653 | Lodged:15:26:17 23 March 2023Caveat Type:Consent CaveatCaveator:SLATER, Anthony WarrenShares Caveated:100/100 shares CAULDRON ENERGY LIMITEDRECORDED:15:26:17 23 March 2023 |