| # | Ver | Text | Start | End |
| 1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 22-Jun-2015 | |
| 2 | 2 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration. | 22-Jan-2026 | |
| 2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 22-Jun-2015 | 21-Jan-2026 |
| 3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Jun-2015 | |
| 4 | 2 | Unless the written approval of the Environmental Officer, Department of Mines, Petroleum and Exploration is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Jan-2026 | |
| 4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Jun-2015 | 21-Jan-2026 |
| 5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Jun-2015 | |
| 6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Jun-2015 | |
| 7 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration. | 22-Jan-2026 | |
| 8 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department of Mines, Petroleum and Exploration upon request. | 22-Jan-2026 | |
| 9 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 22-Jan-2026 | |
| 10 | 1 | Exploration activities conducted under Programme of Work Reg ID 128179 are to be conducted in accordance with the management strategies and measures recommended by the Department of Water and Environmental Regulation for minimising impacts to watercourses and riparian vegetation as per the email “North West Region - General Advice program of work (PoW) - Water Resource protection and (Rights in water and irrigation (RiWi) - Tenement E08/2629” dated 13 August 2024, stored on DMPE file no. EARS-POW-128179, Object ID A80341065. | 22-Jan-2026 | |
| Cond # | Ver | Text | Start | End |
| 1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 22-Jun-2015 | |
| 2 | 2 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration. | 22-Jan-2026 | |
| 2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 22-Jun-2015 | 21-Jan-2026 |
| 3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Jun-2015 | |
| 4 | 2 | Unless the written approval of the Environmental Officer, Department of Mines, Petroleum and Exploration is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Jan-2026 | |
| 4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Jun-2015 | 21-Jan-2026 |
| 5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Jun-2015 | |
| 6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Jun-2015 | |
| 7 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration. | 22-Jan-2026 | |
| 8 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department of Mines, Petroleum and Exploration upon request. | 22-Jan-2026 | |
| 9 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 22-Jan-2026 | |
| 10 | 1 | Exploration activities conducted under Programme of Work Reg ID 128179 are to be conducted in accordance with the management strategies and measures recommended by the Department of Water and Environmental Regulation for minimising impacts to watercourses and riparian vegetation as per the email “North West Region - General Advice program of work (PoW) - Water Resource protection and (Rights in water and irrigation (RiWi) - Tenement E08/2629” dated 13 August 2024, stored on DMPE file no. EARS-POW-128179, Object ID A80341065. | 22-Jan-2026 | |
| Type | Number | Details |
| Forfeiture | 494223 | Initiated:27/09/2016 for non-compliance with reporting requirements( Form 5 )RECORDED:09:22:45 22 September 2016Notice Issued:Regulation 50 Notice sent 27/09/2016 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:01/11/2016FINALISED:Order by Minister on 01 February 2017 that E 08/2629 be No Penalty Imposed |
| Partial Surrender - Voluntary | 508201 | Lodged:12:07 13 June 2017Surrendered Blocks:HAMERSLEY RANGE 3136 v
HAMERSLEY RANGE 3207 e, k, p, u, z
HAMERSLEY RANGE 3208 a, b, f, g, l, m, n, o, p, q, t, u, v, z
HAMERSLEY RANGE 3209 l, q, v
HAMERSLEY RANGE 3280 a, e
HAMERSLEY RANGE 3281 aSurrendered Total:26 BL.REGISTERED:12:07 13 June 2017 |
| Excess Tonnage | 541704 | Lodged:13:52:24 31 October 2018RECORDED:13:52:24 31 October 2018GRANTED:13:25:31 01 November 2018Additional 9,500 tonnes |
| Excess Tonnage | 570458 | Lodged:08:30 20 January 2020RECORDED:08:30 20 January 2020REFUSED:09:11:35 26 February 2020 |
| Extension / Renewal of Term | 570464 | Lodged:08:30 20 January 2020Applied For Period:5 YearsRECORDED:08:30 20 January 2020GRANTED:08 June 2020Granted Period:5 YearsTerm Extended To:21/06/2025 |
| Application to Amend | 640771 | Lodged:08:30 04 February 2022Amending:Address (Including DTC Details)From:Principal Residence : SANDER, Thomas Peter, 23 TUNNEL RD, SWAN VIEW, WA, 6056 and DTC :SANDER, Thomas Peter, THOMAS PETER SANDER, 23 TUNNEL RD, SWAN VIEW, WA, 6056To:Principal Residence : SANDER, Thomas Peter, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxx@mmwc.com.au, xxxxxxx866 and DTC :SANDER, Thomas Peter, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxx@mmwc.com.au, xxxxxxx866RECORDED:08:30 04 February 2022 |
| Extension / Renewal of Term | 731990 | Lodged:08:30 29 April 2025Applied For Period:2 YearsRECORDED:08:30 29 April 2025GRANTED:25 July 2025Granted Period:2 YearsTerm Extended To:21/06/2027 |