Extracted from MTO on 28-Jun-2025 01:00,
last changed 28-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Apr-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Apr-2016 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Apr-2016 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Apr-2016 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Repeater Station Site Reserve 41946. | 22-Apr-2016 | |
6 | 1 | No interference with Geodetic Survey Stations 13 to 15 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 22-Apr-2016 | |
7 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 22-Apr-2016 | |
8 | 1 | No mining within 25 metres of either side of the Gas pipeline contained within Pipeline Licence No. 87 and File Notation Area 8971 as shown in TENGRAPH. | 22-Apr-2016 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 22-Apr-2016 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 22-Apr-2016 | |
11 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 22-Apr-2016 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the Director Petroleum DMP. | 22-Apr-2016 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 22-Apr-2016 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 22-Apr-2016 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 22-Apr-2016 | |
| 1 | In respect to the area designated as CPL 38 in TENGRAPH the following conditions apply: | 22-Apr-2016 | |
16 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 22-Apr-2016 | |
17 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 22-Apr-2016 | |
18 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 22-Apr-2016 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Apr-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Apr-2016 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Apr-2016 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Apr-2016 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Repeater Station Site Reserve 41946. | 22-Apr-2016 | |
6 | 1 | No interference with Geodetic Survey Stations 13 to 15 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 22-Apr-2016 | |
7 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 22-Apr-2016 | |
8 | 1 | No mining within 25 metres of either side of the Gas pipeline contained within Pipeline Licence No. 87 and File Notation Area 8971 as shown in TENGRAPH. | 22-Apr-2016 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 22-Apr-2016 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 22-Apr-2016 | |
11 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 22-Apr-2016 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the Director Petroleum DMP. | 22-Apr-2016 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 22-Apr-2016 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 22-Apr-2016 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 22-Apr-2016 | |
| 1 | In respect to the area designated as CPL 38 in TENGRAPH the following conditions apply: | 22-Apr-2016 | |
16 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 22-Apr-2016 | |
17 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 22-Apr-2016 | |
18 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 22-Apr-2016 | |
Type | Number | Details |
Objection | 449171 | Lodged:10:10 19 June 2014Objectors:FORREST AND FORREST PTY LTDObjection Type:Tenement ApplicationRECORDED:10:10 19 June 2014filed Minute of Programming directions March 2015 to finalise objections.FINALISED:10:30 27 March 2015Wardens Decision Made on:10:30 27 March 2015Wardens Decision Status:Finalised |
Conversion | 493818 | New Tenement:M 08/516Application Date:13:44:24 13 Sep 2016Section:S67Converted 00:00 05 May 2017 being commencement of term of M 08/516 |
Application to Amend | 499337 | Lodged:11:54:15 05 January 2017Amending:NameFrom:KALAMAZOO RESOURCES PTY LTDTo:KALAMAZOO RESOURCES LIMITEDRECORDED:11:54:15 05 January 2017 |
Partial Surrender - Voluntary | 573987 | Lodged:13:32:35 12 March 2020Surrendered Blocks:HAMERSLEY RANGE 1599 x, y, z
HAMERSLEY RANGE 1671 d, eSurrendered Total:5 BL.REGISTERED:13:32:35 12 March 2020 |
Surrender - Outright | 576299 | Lodged:14:16:35 17 April 2020REGISTERED:14:16:35 17 April 2020 |