1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 26-Mar-2018 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 26-Mar-2018 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 26-Mar-2018 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 26-Mar-2018 | |
5 | 1 | No interference with Geodetic Survey Station WYLOO22 & 23 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 26-Mar-2018 | |
6 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 26-Mar-2018 | |
| 1 | Consent to conduct exploration activities on Stock Route 9701 granted, subject to:
| 26-Mar-2018 | |
7 | 1 | No exploration activities being carried out on Stock Route Reserve 9701 which restrict the use of the reserve. | 26-Mar-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 26-Mar-2018 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 26-Mar-2018 | |
3 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 26-Mar-2018 | |
4 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 26-Mar-2018 | |
5 | 1 | No interference with Geodetic Survey Station WYLOO22 & 23 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 26-Mar-2018 | |
6 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 26-Mar-2018 | |
| 1 | Consent to conduct exploration activities on Stock Route 9701 granted, subject to:
| 26-Mar-2018 | |
7 | 1 | No exploration activities being carried out on Stock Route Reserve 9701 which restrict the use of the reserve. | 26-Mar-2018 | |
Type | Number | Details |
Objection | KR232/134 | Lodged:14:15 14 April 2014Objectors:RED SKY STATIONS PTY LTDObjection Type:Tenement ApplicationRECORDED:14:15 14 April 2014received minute of programming directions dated 2 march 2017 to finalise objectionFINALISED:10:00 10 March 2017Wardens Decision Made on:10:00 10 March 2017Wardens Decision Status:Finalised |
Application to Amend | 472931 | Lodged:10:29 17 August 2015Amending:AddressFrom:PILBARA STONE PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:PILBARA STONE PTY LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913RECORDED:10:29 17 August 2015 |
Caveat | 546485 | Lodged:12:31:46 23 January 2019Caveat Type:Consent CaveatCaveator:OLYNTHOS GROUP PTY LTDShares Caveated:100/100 shares PILBARA STONE PTY LTDRECORDED:12:31:46 23 January 2019WITHDRAWN:14:50:41 07 April 2020 |
Extension of Time | 553919 | Lodged:16:10:49 16 May 2019Type:Form 5RECORDED:16:10:49 16 May 2019APPROVED:16:31:12 16 May 2019Time extended until 7 June 2019 |
Forfeiture | 560733 | Initiated:15/08/2019 for non-compliance with reporting requirementsRECORDED:08:30 15 August 2019Notice Issued:Regulation 50 Notice sent 15/08/2019 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:19/09/2019FINALISED:Order by Minister on 07 October 2019 that E 08/2601 be Penalty Imposed |
Fine | 564202 | Fine in respect to:Forfeiture Process 560733Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$180.00Notification date:07/10/2019Due date:11/11/2019Pursuant to:Section 96A(5)RECORDED:07 October 2019PAYMENT RECEIVED:15 October 2019FINALISED:15 October 2019Receipt Number:10118578Amount:$180.00Remaining balance:$0.00 |
Withdrawal of Dealing | 575662 | Lodged:14:50:41 07 April 2020In respect to:Caveat 546485RECORDED:14:50:41 07 April 2020 |
Excess Tonnage | 643183 | Lodged:15:17:05 09 March 2022RECORDED:15:17:05 09 March 2022REFUSED:20:04 22 March 2023 |
Conversion | 658133 | New Tenement:M 08/540Application Date:10:33:39 01 Sep 2022Section:S67 |
Application to Amend | 660947 | Lodged:13:51:55 12 October 2022Amending:Address (Including DTC Details)From:Principal Place of Business : AUSTRALIA STONE GROUP PTY LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxxxxx555 and DTC :AUSTRALIA STONE GROUP PTY LTD, AUSTRALIA STONE GROUP PTY LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxxxxx555To:Principal Place of Business : AUSTRALIA STONE GROUP PTY LTD, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 2028, CARLISLE NORTH, WA, 6101, xxxxxx@auroratenements.com, xxxxxxx800 and DTC :AUSTRALIA STONE GROUP PTY LTD, AURORA TENEMENT CONSULTING PTY LTD, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 2028, CARLISLE NORTH, WA, 6101, xxxxxx@auroratenements.com, xxxxxxx800RECORDED:13:51:55 12 October 2022 |
Application to Amend | 661062 | Lodged:15:13:20 13 October 2022Amending:NameFrom:AUSTRALIA STONE GROUP PTY LTDTo:JOWIN CAPITAL PTY LTDRECORDED:15:13:20 13 October 2022 |
Extension / Renewal of Term | 671666 | Lodged:08:30 24 March 2023Applied For Period:5 YearsRECORDED:08:30 24 March 2023GRANTED:02 June 2023Granted Period:5 YearsTerm Extended To:25/03/2028 |
Application to Amend | 671872 | Lodged:16:18:35 27 March 2023Amending:Address (Including DTC Details)From:Principal Place of Business : JOWIN CAPITAL PTY LTD, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 2028, CARLISLE NORTH, WA, 6101, xxxxxx@auroratenements.com, xxxxxxx800 and DTC :JOWIN CAPITAL PTY LTD, AURORA TENEMENT CONSULTING PTY LTD, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 2028, CARLISLE NORTH, WA, 6101, xxxxxx@auroratenements.com, xxxxxxx800To:Principal Place of Business : JOWIN CAPITAL PTY LTD, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 1907, WEST PERTH, WA, 6872, xxxxxx@auroratenements.com, xxxxxxx800 and DTC :JOWIN CAPITAL PTY LTD, AURORA TENEMENT CONSULTING PTY LTD, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 1907, WEST PERTH, WA, 6872, xxxxxx@auroratenements.com, xxxxxxx800RECORDED:16:18:35 27 March 2023 |
Partial Surrender - Compulsory | 700067 | Lodged:16:01:30 28 March 2024Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 2468 p, u
HAMERSLEY RANGE 2469 f, m, q, rSurrendered Total:6 BL.REGISTERED:16:01:30 28 March 2024Surrendered area to be released 08:30:00 26/04/2024 under Section 65 (3)Surrendered area released 08:30:00 26/04/2024 under Section 65 (3) |