Extracted from MTO on 01-Jul-2025 01:07,
last changed 27-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 04-Mar-2015 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 05-Nov-2024 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 04-Mar-2015 | 04-Nov-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Mar-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Mar-2015 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 04-Mar-2015 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 04-Mar-2015 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 04-Mar-2015 | |
8 | 1 | No interference with Geodetic Survey Stations SSM-YANREY 51 and 147, SSM-YRY 152 and SSM-R 601 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 04-Mar-2015 | |
9 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 04-Mar-2015 | |
10 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 05-Nov-2024 | |
11 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 05-Nov-2024 | |
12 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 05-Nov-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 04-Mar-2015 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 05-Nov-2024 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 04-Mar-2015 | 04-Nov-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Mar-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Mar-2015 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 04-Mar-2015 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 04-Mar-2015 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 04-Mar-2015 | |
8 | 1 | No interference with Geodetic Survey Stations SSM-YANREY 51 and 147, SSM-YRY 152 and SSM-R 601 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 04-Mar-2015 | |
9 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 04-Mar-2015 | |
10 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 05-Nov-2024 | |
11 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 05-Nov-2024 | |
12 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 05-Nov-2024 | |
Type | Number | Details |
Application to Amend | 490146 | Lodged:10:36:54 07 July 2016Amending:Address (Including DTC Details)From:METAL HOLDINGS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:METAL HOLDINGS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:10:36:54 07 July 2016 |
Caveat | 520820 | Lodged:11:55 22 December 2017Caveat Type:Consent CaveatCaveator:FORREST & FORREST PTY LTDShares Caveated:100/100 shares METAL HOLDINGS PTY LTDRECORDED:11:55 22 December 2017WITHDRAWN:08:30 20 February 2018 |
Withdrawal of Dealing | 523990 | Lodged:08:30 20 February 2018In respect to:Caveat 520820RECORDED:08:30 20 February 2018 |
Extension / Renewal of Term | 573238 | Lodged:11:19:12 28 February 2020Applied For Period:5 YearsRECORDED:11:19:12 28 February 2020GRANTED:04 May 2020Granted Period:5 YearsTerm Extended To:03/03/2025 |
Application to Amend | 573740 | Lodged:14:29:51 10 March 2020Amending:Address (Including DTC Details)From:Principal Place of Business : FORREST & FORREST PTY LTD, FORREST & FORREST PTY LTD, 80 BIRDWOOD PLACE, DALKEITH, WA, 6009 and DTC :FORREST & FORREST PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH BC, WA, 6849, xxxx@hemts.com.auTo:Principal Place of Business : FORREST & FORREST PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977 and DTC :FORREST & FORREST PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:14:29:51 10 March 2020 |
Partial Surrender - Voluntary | 583369 | Lodged:11:57:09 03 August 2020REJECTED:11:57:09 03 August 2020 |
Partial Surrender - Voluntary | 584359 | Lodged:15:43:03 17 August 2020Surrendered Blocks:HAMERSLEY RANGE 2391 k
HAMERSLEY RANGE 2392 a, b, c, f, g, h, l, m, n, r, s, w, x
HAMERSLEY RANGE 2394 z
HAMERSLEY RANGE 2395 r, v, w
HAMERSLEY RANGE 2464 b, c, d, e, j, k, o, p, t, u
HAMERSLEY RANGE 2465 f, l, q, x, y
HAMERSLEY RANGE 2466 d, e, k, p, x, y, z
HAMERSLEY RANGE 2467 a, b, f, g, l, m, q, v
HAMERSLEY RANGE 2538 d, e, g, j, k, m
HAMERSLEY RANGE 2539 a, f, lSurrendered Total:57 BL.REGISTERED:15:43:03 17 August 2020 |
Application to Amend | 590246 | Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : FORREST & FORREST PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977 and DTC :FORREST & FORREST PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : FORREST & FORREST PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977 and DTC :FORREST & FORREST PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977RECORDED:14:30 11 November 2020 |
Application to Amend | 633379 | Lodged:10:36:38 01 October 2021Amending:Address (Including DTC Details)From:Principal Place of Business : FORREST & FORREST PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977 and DTC :FORREST & FORREST PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : FORREST & FORREST PTY LTD, 171-173 MOUNTS BAY ROAD, PERTH, WA, 6000, xxxxxxxxx@wyloometals.com, xxxxxxx949 and DTC :FORREST & FORREST PTY LTD, FORREST & FORREST PTY LTD, PO BOX 3155, BROADWAY NEDLANDS, WA, 6009, xxxxxxxxx@wyloometals.com, xxxxxxx949RECORDED:10:36:38 01 October 2021 |
Partial Surrender - Voluntary | 646047 | Lodged:14:25:40 30 March 2022Surrendered Blocks:HAMERSLEY RANGE 2392 j, o, t, y, z
HAMERSLEY RANGE 2465 a, g, m, rSurrendered Total:9 BL.REGISTERED:14:25:40 30 March 2022 |
Partial Surrender - Voluntary | 687586 | Lodged:12:24:48 10 October 2023Surrendered Blocks:HAMERSLEY RANGE 2322 v, w
HAMERSLEY RANGE 2393 k, p, u
HAMERSLEY RANGE 2394 a, b, f, g, l, m, q, r, u, w
HAMERSLEY RANGE 2395 f, l, q
HAMERSLEY RANGE 2465 n, s
HAMERSLEY RANGE 2466 s, u
HAMERSLEY RANGE 2538 hSurrendered Total:23 BL.REJECTED:12:24:48 10 October 2023 |
Partial Surrender - Voluntary | 688176 | Lodged:14:16:33 19 October 2023Surrendered Blocks:HAMERSLEY RANGE 2322 v, w
HAMERSLEY RANGE 2393 k, p, u
HAMERSLEY RANGE 2394 a, b, f, g, l, m, q, r, u, w
HAMERSLEY RANGE 2395 f, l, q
HAMERSLEY RANGE 2465 n, s
HAMERSLEY RANGE 2466 s, u
HAMERSLEY RANGE 2538 hSurrendered Total:23 BL.REGISTERED:14:16:33 19 October 2023 |
Application to Amend | 688492 | Lodged:12:09:55 24 October 2023Amending:Address (Including DTC Details)From:Principal Place of Business : FORREST & FORREST PTY LTD, 171-173 MOUNTS BAY ROAD, PERTH, WA, 6000, xxxxxxxxx@wyloometals.com, xxxxxxx949 and DTC :FORREST & FORREST PTY LTD, FORREST & FORREST PTY LTD, PO BOX 3155, BROADWAY NEDLANDS, WA, 6009, xxxxxxxxx@wyloometals.com, xxxxxxx949To:Principal Place of Business : FORREST & FORREST PTY LTD, LEVEL 1, 8 RICHARDSON STREET, WEST PERTH, WA, 6005, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200 and DTC :FORREST & FORREST PTY LTD, FORREST & FORREST PTY LTD, PO BOX 1810, WEST PERTH, WA, 6872, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200REJECTED:12:09:55 24 October 2023 |
Application to Amend | 688895 | Lodged:12:31:36 30 October 2023Amending:Address (Including DTC Details)From:Principal Place of Business : FORREST & FORREST PTY LTD, 171-173 MOUNTS BAY ROAD, PERTH, WA, 6000, xxxxxxxxx@wyloometals.com, xxxxxxx949 and DTC :FORREST & FORREST PTY LTD, FORREST & FORREST PTY LTD, PO BOX 3155, BROADWAY NEDLANDS, WA, 6009, xxxxxxxxx@wyloometals.com, xxxxxxx949To:Principal Place of Business : FORREST & FORREST PTY LTD, LEVEL 1, 8 RICHARDSON STREET, WEST PERTH, WA, 6005, xxxxxxxxx@wyloometals.com, xxxxxxxxxxxx200 and DTC :FORREST & FORREST PTY LTD, FORREST & FORREST PTY LTD, PO BOX 1810, WEST PERTH, WA, 6872, xxxxxxxxx@wyloometals.com, xxxxxxxxxxxx200RECORDED:12:31:36 30 October 2023 |
Partial Surrender - Voluntary | 707897 | Lodged:10:44:35 27 June 2024Surrendered Blocks:HAMERSLEY RANGE 2322 x
HAMERSLEY RANGE 2392 p, u
HAMERSLEY RANGE 2393 q, v, w, x
HAMERSLEY RANGE 2394 c, h, j, k, n, o, p, s, t, x, y
HAMERSLEY RANGE 2465 b, c, h, j, o, p, t, u
HAMERSLEY RANGE 2466 b, c, g, h, j, l, m, n, o, q, r, t, w
HAMERSLEY RANGE 2538 b, cSurrendered Total:41 BL.REGISTERED:10:44:35 27 June 2024 |
Application to Amend | 720970 | Lodged:13:45:41 02 December 2024Amending:Address (Including DTC Details)From:Principal Place of Business : FORREST & FORREST PTY LTD, LEVEL 1, 8 RICHARDSON STREET, WEST PERTH, WA, 6005, xxxxxxxxx@wyloometals.com, xxxxxxxxxxxx200 and DTC :FORREST & FORREST PTY LTD, FORREST & FORREST PTY LTD, PO BOX 1810, WEST PERTH, WA, 6872, xxxxxxxxx@wyloometals.com, xxxxxxxxxxxx200To:Principal Place of Business : FORREST & FORREST PTY LTD, LEVEL 8, TOWER 3 CAPITAL SQUARE, 1 SPRING STREET, PERTH, WA, 6000, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200 and DTC :FORREST & FORREST PTY LTD, WYLOO METALS PTY LTD, PO BOX 7142, CLOISTERS SQUARE, PERTH, WA, 6850, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200RECORDED:13:45:41 02 December 2024 |
Extension / Renewal of Term | 725065 | Lodged:14:41:32 05 February 2025Applied For Period:2 YearsRECORDED:14:41:32 05 February 2025GRANTED:03 April 2025Granted Period:2 YearsTerm Extended To:03/03/2027 |