Tenement Summary

Identifier:E 08/2499Type:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:7 BL
Purposes:Term:5 Years (Extended)
Markout:Received:01-Jul-2013 13:18
Commence:12-Nov-2014 Expiry:11-Nov-2026

Holders

Company NameSharesTotal Shares
BLACK CAT (PAULSENS) PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
NORTHERN STAR RESOURCES LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25001-Jul-2013 7.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.12-Nov-2014
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.12-Nov-2014
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Nov-2014
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Nov-2014
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Nov-2014
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Nov-2014
71No interference with Geodetic Survey Station SSM-WYLOO 6 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.12-Nov-2014
81No mining within 25 metres of either side of the Gas pipeline contained within Pipeline Licence No 24 as shown in TENGRAPH.
12-Nov-2014
91No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP12-Nov-2014
101No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline.12-Nov-2014
111The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP.12-Nov-2014
121No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer DMP.12-Nov-2014
131Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP .12-Nov-2014
141The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline.12-Nov-2014
151Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline.12-Nov-2014

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.12-Nov-2014
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.12-Nov-2014
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Nov-2014
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Nov-2014
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Nov-2014
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Nov-2014
71No interference with Geodetic Survey Station SSM-WYLOO 6 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.12-Nov-2014
81No mining within 25 metres of either side of the Gas pipeline contained within Pipeline Licence No 24 as shown in TENGRAPH.
12-Nov-2014
91No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP12-Nov-2014
101No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline.12-Nov-2014
111The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP.12-Nov-2014
121No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer DMP.12-Nov-2014
131Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP .12-Nov-2014
141The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline.12-Nov-2014
151Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline.12-Nov-2014

Dealings

TypeNumberDetails
Application to Amend476104Lodged:15:29:07 19 October 2015Amending:AddressFrom:NORTHERN STAR RESOURCES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:15:29:07 19 October 2015
Extension / Renewal of Term566327Lodged:14:58:15 08 November 2019Applied For Period:5 YearsRECORDED:14:58:15 08 November 2019GRANTED:13 January 2020Granted Period:5 YearsTerm Extended To:11/11/2024
Application to Amend619821Lodged:08:30 09 April 2021Amending:Address (Including DTC Details)From:NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904To:NORTHERN STAR RESOURCES LTD, NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxxxxxx@nsrltd.com, xxxxx100RECORDED:08:30 09 April 2021
Application to Amend619822Lodged:08:30 09 April 2021Amending:Address (Including DTC Details)From:NORTHERN STAR RESOURCES LTD, SAME AS CORRESPONDENCETo:NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:08:30 09 April 2021
Application to Amend652280Lodged:14:01:28 27 June 2022Amending:Address (Including DTC Details)From:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904 and DTC :NORTHERN STAR RESOURCES LTD, NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxxxxxx@nsrltd.com, xxxxx100To:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :NORTHERN STAR RESOURCES LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:14:01:28 27 June 2022
Application to Amend667996Lodged:09:35:26 01 February 2023Amending:Address (Including DTC Details)From:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxx997 and DTC :NORTHERN STAR RESOURCES LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxx997To:Principal Place of Business : NORTHERN STAR RESOURCES LTD, C/- BLACK CAT (PAULSENS) PTY LTD C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :NORTHERN STAR RESOURCES LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- BLACK CAT (PAULSENS) PTY LTD C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:09:35:26 01 February 2023
Application to Amend709118Lodged:15:40 10 July 2024Amending:Address (Including DTC Details)From:Principal Place of Business : BLACK CAT (PAULSENS) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :BLACK CAT (PAULSENS) PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997To:Principal Place of Business : BLACK CAT (PAULSENS) PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :BLACK CAT (PAULSENS) PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:15:40 10 July 2024
Extension / Renewal of Term718664Lodged:09:08:14 04 November 2024Applied For Period:2 YearsRECORDED:09:08:14 04 November 2024GRANTED:13 January 2025Granted Period:2 YearsTerm Extended To:11/11/2026
Mortgage719713Lodged:08:32:57 18 November 2024Mortgaged Shares:100/100 shares BLACK CAT (PAULSENS) PTY LTDMortgagee:NORTHERN STAR RESOURCES LTDREGISTERED:08:32:57 18 November 2024DISCHARGED:12:21:17 31 March 2025Mortgage Discharge:729633 Rejected 08:30 31 March 2025Full Discharge:729716 Registered 12:21:17 31 March 2025
Mortgage - Discharge729633Lodged:08:30 31 March 2025In respect to:Mortgage 719713REJECTED:08:30 31 March 2025
Mortgage - Discharge729716Lodged:12:21:17 31 March 2025In respect to:Mortgage 719713REGISTERED:12:21:17 31 March 2025

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202531-Oct-2024 10695613$5,488.007 BL12-Nov-2014 $5,488.00$0.00
Rental202431-Oct-2023 10433121$5,229.007 BL12-Nov-2014 $5,229.00$0.00
Rental202307-Nov-2022 28376805647$4,977.007 BL12-Nov-2014 $4,977.00$0.00
Rental202211-Oct-2021 10224487$4,739.007 BL12-Nov-2014 $4,739.00$0.00
Rental202114-Oct-2020 10167722$2,275.007 BL12-Nov-2014 $2,275.00$0.00
Rental202009-Oct-2019 10117845$2,226.007 BL12-Nov-2014 $2,226.00$0.00
Rental201915-Oct-2018 7018983564$1,540.007 BL12-Nov-2014 $1,540.00$0.00
Rental201812-Oct-2017 9539268814$1,456.007 BL12-Nov-2014 $1,456.00$0.00
Rental201720-Oct-2016 MT-210010793018-DD$906.507 BL12-Nov-2014 $906.50$0.00
Rental201627-Oct-2015 MT-210010411771-DD$876.757 BL12-Nov-2014 $876.75$0.00
Rental201501-Jul-2013 318215361607$816.907 BL12-Nov-2014 $816.90$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2025$70,000.00false
2024$70,000.0010-Jan-2025 $72,769.00$52,163.00$0.00$0.00$6,606.00$14,000.00$0.00false
2023$70,000.0019-Dec-2023 $81,417.00$61,084.00$0.00$0.00$6,333.00$14,000.00$0.00false
2022$70,000.0022-Dec-2022 $33,000.0066612222-Dec-2022 $70,000.00Granted01-Feb-2023 $22,140.00$0.00$0.00$6,002.00$4,858.00$0.00false
2021$50,000.0016-Dec-2021 $22,060.0063789617-Dec-2021 $27,940.00Granted01-Feb-2022 $16,238.00$0.00$0.00$3,538.00$2,284.00$0.00false
2020$50,000.0014-Dec-2020 $37,796.0059269917-Dec-2020 $12,204.00Granted29-Jan-2021 $32,665.00$0.00$0.00$3,488.00$1,643.00$0.00false
2019$30,000.0012-Dec-2019 $51,331.00$40,441.00$0.00$0.00$2,802.00$8,088.00$0.00false
2018$30,000.0011-Dec-2018 $14,874.0054454812-Dec-2018 $15,126.00Granted21-Jan-2019 $10,802.00$0.00$0.00$2,606.00$1,466.00$0.00false
2017$20,000.0012-Dec-2017 $22,407.00$16,804.00$0.00$0.00$1,944.00$3,659.00$0.00false
2016$20,000.0014-Dec-2016 $13,304.0049852514-Dec-2016 $6,696.00Granted25-Jan-2017 $7,502.00$0.00$0.00$1,802.00$4,000.00$0.00false
2015$20,000.0011-Dec-2015 $25,829.00$20,135.00$0.00$0.00$1,694.00$4,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
17-Sep-2013 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2013-10-092014-02-09CLEARED - Expedited Applies2014-11-117 BL22310S116730E100km S'ly of PannawonicaWO2014/00662014-02-04WC2001/005Objection Withdrawn Agreement2014-11-11WO2014/00622014-02-04WC2005/004Objection Withdrawn Agreement2014-11-11Puutu Kunti Kurrama and Pinikura(WC2001/005)WC2001/005WAD6007/2001falseDeterminedPuutu Kunti Kurrama and Pinikura 2(WC2005/004)WC2005/004WAD126/2005falseDetermined12PilbaraYamatji Marlpa Aboriginal Corporation