Extracted from MTO on 12-Jul-2025 00:50,
last changed 03-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 23-Sep-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 23-Sep-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-Sep-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-Sep-2013 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 23-Sep-2013 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 23-Sep-2013 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 23-Sep-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 23-Sep-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-Sep-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-Sep-2013 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 23-Sep-2013 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 23-Sep-2013 | |
Type | Number | Details |
Iron Ore Inclusion | 399385 | Lodged:15:40 12 June 2012RECORDED:15:40 12 June 2012AUTHORISED:00:00 23 September 2013 |
Miscellaneous Entry | | In the Perth Warden's Court on the 27th February, 2013, a Ballot was conducted to determine priority between applications for Exploration Licences 08/2397 and 08/2398:
1st Drawn: E08/2398
2nd Drawn: E08/2397 |
Application to Amend | 395606 | Lodged:15:45 11 March 2013Amending:AddressFrom:FMG PILBARA PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:15:45 11 March 2013 |
Excess Tonnage | 461541 | Lodged:08:30 02 February 2015RECORDED:08:30 02 February 2015GRANTED:13:37:44 03 February 2015An additional 2,325 tonnes |
Forfeiture | 526096 | Initiated:27/02/2018 for non-compliance with expenditure conditionsRECORDED:15:43 20 March 2018Notice Issued:Regulation 50 Notice sent 27/02/2018 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:03/04/2018FINALISED:Order by Minister on 28 May 2018 that E 08/2398-I be Penalty Imposed |
Fine | 531394 | Fine in respect to:Forfeiture Process 526096Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,742.00Notification date:29/05/2018Due date:03/07/2018Pursuant to:Section 96A(5)RECORDED:29 May 2018PAYMENT RECEIVED:06 June 2018FINALISED:06 June 2018Receipt Number:84217325658Amount:$1,742.00Remaining balance:$0.00 |
Extension / Renewal of Term | 539048 | Lodged:13:54:06 13 September 2018Applied For Period:5 YearsRECORDED:13:54:06 13 September 2018REFUSED:14 January 2019Licence Expired:14/01/2019 |
Expiry - Full | 545941 | EFFECTIVE:Midnight 14 January 2019 |