1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 19-Jan-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Jan-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Jan-2018 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Jan-2018 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Jan-2018 | |
6 | 1 | No interference with Geodetic Survey Station YANREY 42 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 19-Jan-2018 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 19-Jan-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 19-Jan-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Jan-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Jan-2018 | |
4 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Jan-2018 | |
5 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Jan-2018 | |
6 | 1 | No interference with Geodetic Survey Station YANREY 42 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 19-Jan-2018 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 19-Jan-2018 | |
Type | Number | Details |
Objection | KR632/112 | Lodged:15:35 08 May 2012Objectors:FORREST AND FORREST PTY LTDObjection Type:Tenement ApplicationRECORDED:15:35 08 May 2012FINALISED:10:00 14 February 2014Wardens Decision Made on:11:00 14 February 2014Wardens Decision Status:FinalisedWardens Decision Text:Warden recommend that all applications be refused. |
Application to Amend | 435603 | Lodged:09:00 22 November 2013Amending:AddressFrom:Residential : CAULDRON ENERGY LTD, SAME AS CORRESPONDENCE and Correspondence :CAULDRON ENERGY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Residential : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and Correspondence :CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901RECORDED:09:00 22 November 2013 |
Application to Amend | 512344 | Lodged:13:48:12 10 August 2017Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and DTC :CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901To:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, NGAIRE KOCH, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555RECORDED:13:48:12 10 August 2017 |
Application to Amend | 524209 | Lodged:15:11:18 21 February 2018Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, NGAIRE KOCH, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555To:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555RECORDED:15:11:18 21 February 2018 |
Application for Forfeiture | 547422 | Lodged:15:56:02 08 February 2019Respondent:CAULDRON ENERGY LTDApplicant:SQUADRON RESOURCES PTY LTDRECORDED:15:56:02 08 February 2019Warden's Determination:Dismissed 30/08/2019 11:32:02 |
Application to Amend | 618461 | Lodged:08:30 23 March 2021Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555To:Principal Place of Business : CAULDRON ENERGY LTD, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941RECORDED:08:30 23 March 2021 |
Application to Amend | 620719 | Lodged:15:18:10 20 April 2021Amending:Address (Including DTC Details)From:CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941To:CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941RECORDED:15:18:10 20 April 2021 |
Extension / Renewal of Term | 667064 | Lodged:14:19:46 17 January 2023Applied For Period:5 YearsRECORDED:14:19:46 17 January 2023GRANTED:28 March 2023Granted Period:5 YearsTerm Extended To:18/01/2028 |