Tenement: E08-2385

View on Landtracker Maps (logon required)

Extracted from MTO on 11-Jul-2025 00:54, last changed 26-Jun-2025.

Tenement Summary

Identifier:E 08/2385Type:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:31 BL
Purposes:Term:5 Years (Extended)
Markout:Received:04-Apr-2012 14:20
Commence:19-Jan-2018 Expiry:18-Jan-2028

Holders

Company NameSharesTotal Shares
CAULDRON ENERGY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
CAULDRON ENERGY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25004-Apr-2012 31.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.19-Jan-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.19-Jan-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.19-Jan-2018
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.19-Jan-2018
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
19-Jan-2018
61No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.19-Jan-2018
71No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No. 16, 19 and 103 as shown in TENGRAPH.19-Jan-2018
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS19-Jan-2018
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.19-Jan-2018
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS19-Jan-2018
111No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMIRS .19-Jan-2018
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS .19-Jan-2018
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.19-Jan-2018
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.19-Jan-2018
1In respect to the area designated as CPL 38 (former Mt Minnie PL) in TENGRAPH the following conditions apply:19-Jan-2018
151Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
19-Jan-2018
161The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
19-Jan-2018
171Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.19-Jan-2018

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.19-Jan-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.19-Jan-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.19-Jan-2018
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.19-Jan-2018
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
19-Jan-2018
61No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.19-Jan-2018
71No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No. 16, 19 and 103 as shown in TENGRAPH.19-Jan-2018
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS19-Jan-2018
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.19-Jan-2018
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS19-Jan-2018
111No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMIRS .19-Jan-2018
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS .19-Jan-2018
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.19-Jan-2018
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.19-Jan-2018
1In respect to the area designated as CPL 38 (former Mt Minnie PL) in TENGRAPH the following conditions apply:19-Jan-2018
151Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, Department of Mines, Industry Regulation and Safety (DMIRS) the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMIRS. The program to include:
  • maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
  • the purpose, specifications and life of all proposed disturbances;
  • proposals which may disturb any declared rare or geographically restricted flora and fauna; and
  • techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
19-Jan-2018
161The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMIRS. Such rehabilitation as is appropriate and may include:
  • stockpiling and return of topsoil;
  • backfilling all holes, trenches and costeans;
  • ripping;
  • contouring to the original landform;
  • revegetation with seed; and
  • capping and backfilling of all drill holes.
19-Jan-2018
171Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMIRS and arranging an inspection as required.19-Jan-2018

Dealings

TypeNumberDetails
ObjectionKR631/112Lodged:15:35 08 May 2012Objectors:FORREST AND FORREST PTY LTDObjection Type:Tenement ApplicationRECORDED:15:35 08 May 2012FINALISED:10:00 14 February 2014Wardens Decision Made on:10:00 14 February 2014Wardens Decision Status:FinalisedWardens Decision Text:Warden recommend that all applications be refused.
Application to Amend435602Lodged:09:00 22 November 2013Amending:AddressFrom:Residential : CAULDRON ENERGY LTD, SAME AS CORRESPONDENCE and Correspondence :CAULDRON ENERGY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Residential : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and Correspondence :CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901RECORDED:09:00 22 November 2013
Application to Amend512344Lodged:13:48:12 10 August 2017Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and DTC :CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901To:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, NGAIRE KOCH, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555RECORDED:13:48:12 10 August 2017
Application to Amend524209Lodged:15:11:18 21 February 2018Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, NGAIRE KOCH, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555To:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555RECORDED:15:11:18 21 February 2018
Application for Forfeiture547421Lodged:15:56:02 08 February 2019Applicant:SQUADRON RESOURCES PTY LTDRespondent:CAULDRON ENERGY LTDRECORDED:15:56:02 08 February 2019Warden's Determination:Dismissed 30/08/2019 11:31:06
Application to Amend618461Lodged:08:30 23 March 2021Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555To:Principal Place of Business : CAULDRON ENERGY LTD, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941RECORDED:08:30 23 March 2021
Application to Amend620719Lodged:15:18:10 20 April 2021Amending:Address (Including DTC Details)From:CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941To:CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941RECORDED:15:18:10 20 April 2021
Extension / Renewal of Term667063Lodged:14:18:13 17 January 2023Applied For Period:5 YearsRECORDED:14:18:13 17 January 2023GRANTED:28 March 2023Granted Period:5 YearsTerm Extended To:18/01/2028
Extension of Time667889Lodged:09:30 27 January 2023Type:OtherRECORDED:09:30 27 January 2023APPROVED:09:19:13 31 January 2023Time to lodge extended to COB 14 February 2023
Partial Surrender - Compulsory694379Lodged:13:42 18 January 2024Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 1742 z HAMERSLEY RANGE 1743 l, m, n, q, r HAMERSLEY RANGE 1814 e, k, p, t, u, y, z HAMERSLEY RANGE 1815 f HAMERSLEY RANGE 1886 d HAMERSLEY RANGE 1958 a, b, c, d, fSurrendered Total:20 BL.REGISTERED:Midnight 18 January 2024Surrendered area to be released 08:30:00 09/02/2024 under Section 65 (3)Surrendered area released 08:30:00 09/02/2024 under Section 65 (3)

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202631-Jan-2025 10748756$24,304.0031 BL18-Jan-2024 $24,304.00$0.00
Rental202501-Feb-2024 10498773$12,245.0031 BL18-Jan-2024 $12,245.00$0.00
Rental202402-Feb-2023 10324040$19,176.0051 BL19-Jan-2018 $19,176.00$0.00
Rental202319-Jan-2022 10239429$13,362.0051 BL19-Jan-2018 $13,362.00$0.00
Rental202214-Jan-2021 10178444$12,138.0051 BL19-Jan-2018 $12,138.00$0.00
Rental202117-Feb-2020 10133633$7,038.0051 BL19-Jan-2018 $7,038.00$0.00
Rental202018-Jan-2019 10082984$6,936.0051 BL19-Jan-2018 $6,936.00$0.00
Rental201924-Jan-2018 (REFUND) 209516298340PERTH$340.5051 BL19-Jan-2018 $5,788.50$0.00
Rental201904-Apr-2012 209516298340$6,129.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$93,000.00false
2025$62,000.0019-Mar-2025 $45,641.5972868619-Mar-2025 $62,000.00Recorded$4,635.95$0.00$0.00$28,605.64$12,400.00$0.00false
2024$102,000.0018-Mar-2024 $45,353.7569889115-Mar-2024 $102,000.00Granted07-May-2024 $1,670.74$0.00$0.00$31,701.01$11,982.00$0.00false
2023$76,500.0016-Mar-2023 $34,706.0667106316-Mar-2023 $76,500.00Granted21-Jun-2023 $1,072.80$0.00$0.00$24,384.26$9,249.00$0.00false
2022$76,500.0018-Mar-2022 $30,386.2164281304-Mar-2022 $76,500.00Granted13-Apr-2022 $2,263.80$0.00$0.00$20,109.41$8,013.00$0.00false
2021$51,000.0018-Mar-2021 $53,251.00$24,281.00$0.00$0.00$18,770.00$10,200.00$0.00false
2020$25,500.0018-Mar-2020 $27,772.35$3,124.00$0.00$0.00$19,548.35$5,100.00$0.00false
2019$51,000.0019-Mar-2019 $38,361.5154955518-Mar-2019 $51,000.00Granted01-May-2019 $14,493.51$0.00$0.00$13,668.00$10,200.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
06-Jan-2015 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-01-282015-05-28CLEARED - Expedited Applies2015-06-1054 BL22100S115100E59km S'ly of OnslowTHALANYJI(WCD2008/003)WC1999/045WAD6113/1998falseWCD2008/003116EXISTNo12PilbaraYamatji Marlpa Aboriginal Corporation