| 1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 20-Aug-2013 | |
| 2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 20-Aug-2013 | |
| 3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 20-Aug-2013 | |
| 4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 20-Aug-2013 | |
| 5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 20-Aug-2013 | |
| 6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 20-Aug-2013 | |
| Cond # | Ver | Text | Start | End |
| 1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 20-Aug-2013 | |
| 2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 20-Aug-2013 | |
| 3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 20-Aug-2013 | |
| 4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 20-Aug-2013 | |
| 5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 20-Aug-2013 | |
| 6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 20-Aug-2013 | |
| Type | Number | Details |
| Application to Amend | 393893 | Lodged:11:50 23 March 2012Amending:AddressFrom:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:11:50 23 March 2012 |
| Application to Amend | 513764 | Lodged:11:15:49 04 September 2017Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:11:15:49 04 September 2017 |
| Extension / Renewal of Term | 537226 | Lodged:13:13:48 16 August 2018Applied For Period:5 YearsRECORDED:13:13:48 16 August 2018GRANTED:19 November 2018Granted Period:5 YearsTerm Extended To:19/08/2023 |
| Partial Surrender - Compulsory | 561062 | Lodged:08:55:18 19 August 2019Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 2621 t, u, y, z
HAMERSLEY RANGE 2622 q, r, s, v, wSurrendered Total:9 BL.REGISTERED:Midnight 19 August 2019Surrendered area to be released 08:30:00 17/09/2019 under Section 65 (3)Surrendered area released 08:30:00 17/09/2019 under Section 65 (3) |
| Extension of Time | 565125 | Lodged:09:47:45 21 October 2019Type:Form 5RECORDED:09:47:45 21 October 2019APPROVED:09:10:43 22 October 2019Time to lodge extended to 01/11/2019 |
| Application to Amend | 591786 | Lodged:13:44:31 04 December 2020Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:13:44:31 04 December 2020 |
| Extension / Renewal of Term | 683096 | Lodged:14:17:45 07 August 2023Applied For Period:2 YearsRECORDED:14:17:45 07 August 2023GRANTED:24 November 2023Granted Period:2 YearsTerm Extended To:19/08/2025 |
| Application to Amend | 683322 | Lodged:15:42:41 09 August 2023Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:15:42:41 09 August 2023 |
| Application to Amend | 694316 | Lodged:15:52:16 17 January 2024Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:15:52:16 17 January 2024 |
| Surrender - Outright | 713561 | Lodged:14:36:27 29 August 2024REGISTERED:14:36:27 29 August 2024 |