Extracted from MTO on 01-Jul-2025 01:07,
last changed 01-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 11-Jun-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 11-Jun-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Jun-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Jun-2013 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Jun-2013 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Jun-2013 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Historical Site & Buildings Reserve 35118, and Foreshore, Seabed and Navigable Waters. | 11-Jun-2013 | |
8 | 1 | No mining within 25 metres of either side of the Gas Pipeline 21.
| 11-Jun-2013 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 11-Jun-2013 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 11-Jun-2013 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 11-Jun-2013 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer DMP. | 11-Jun-2013 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 11-Jun-2013 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 11-Jun-2013 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 11-Jun-2013 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 11-Jun-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 11-Jun-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Jun-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Jun-2013 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Jun-2013 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Jun-2013 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Historical Site & Buildings Reserve 35118, and Foreshore, Seabed and Navigable Waters. | 11-Jun-2013 | |
8 | 1 | No mining within 25 metres of either side of the Gas Pipeline 21.
| 11-Jun-2013 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 11-Jun-2013 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 11-Jun-2013 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 11-Jun-2013 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer DMP. | 11-Jun-2013 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 11-Jun-2013 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 11-Jun-2013 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 11-Jun-2013 | |
Type | Number | Details |
Objection | KR222/112 | Lodged:13:30 14 October 2011Objectors:FORREST AND FORREST PTY LTDObjection Type:Tenement ApplicationRECORDED:13:30 14 October 2011FINALISED:10:00 08 June 2012Wardens Decision Made on:10:00 08 June 2012Wardens Decision Status:OtherWardens Decision Text:Warden made orders in terms of Minute of Consent Orders dated 8 June 2012 whereby Objection withdrawn and Minderoo Station excised from grant of E08/2329. |
Application to Amend | 412292 | Lodged:14:55 30 November 2012Amending:AddressFrom:QUARRY PARK PTY LTD, C/-, PO BOX 890, INNALOO, WA, 6018To:QUARRY PARK PTY LTD, C/- M&M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008RECORDED:14:55 30 November 2012 |
Application to Amend | 476397 | Lodged:09:53:58 26 October 2015Amending:AddressFrom:QUARRY PARK PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:QUARRY PARK PTY LTD, SUITE G5, 49 MELVILLE PDE, SOUTH PERTH, WA, 6151RECORDED:09:53:58 26 October 2015 |
Application to Amend | 509710 | Lodged:12:15:53 04 July 2017Amending:Address (Including DTC Details)From:QUARRY PARK PTY LTD, SUITE G5, 49 MELVILLE PDE, SOUTH PERTH, WA, 6151To:QUARRY PARK PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxx866RECORDED:12:15:53 04 July 2017 |
Extension / Renewal of Term | 532189 | Lodged:10:19:48 07 June 2018Applied For Period:5 YearsRECORDED:10:19:48 07 June 2018GRANTED:13 August 2018Granted Period:5 YearsTerm Extended To:10/06/2023 |
Caveat | 566344 | Lodged:15:48 08 November 2019Caveat Type:Absolute CaveatCaveator:ASHBURTON MINERAL RESOURCES PTY LTDShares Caveated:100/100 shares QUARRY PARK PTY LTDRECORDED:15:48 08 November 2019REMOVED:By Order of Warden, John O' Sullivan 11 September 2020 |
Plaint | 577031 | Lodged:11:48:39 30 April 2020Plaintiffs:QUARRY PARK PTY LTD, SLATER, Anthony WarrenRespondents:ASHBURTON MINERAL RESOURCES PTY LTDRECORDED:11:48:39 30 April 2020Warden's Determination:Finalised 10:00 21 September 2020The Plaint was Finalised based on the Minute of consent orders lodged by both parties dated 11 September 2020 where
1. The following caveats be removed by consent:
(a) Caveat 566341 affecting E08/2328
(b) Caveat 566344 affecting E08/2329
(c) Caveat 566342 affecting E08/2642
(d) Caveat 566364 affecting M08/487; and
(e) Caveat 566353 affectingL08/71
2. There be no order as to costs, save for the costs orders made by the Warden on 19 June 2020, 3 July 2020, 31 July 2020 and 27 August 2020.
Which was approved by the Warden on the 21 September 2020 |
Caveat | 671651 | Lodged:15:26:17 23 March 2023Caveat Type:Consent CaveatCaveator:QUARRY PARK PTY LTDShares Caveated:100/100 shares CAULDRON ENERGY LIMITEDRECORDED:15:26:17 23 March 2023 |
Extension / Renewal of Term | 678176 | Lodged:13:22:23 09 June 2023Applied For Period:2 YearsRECORDED:13:22:23 09 June 2023GRANTED:06 October 2023Granted Period:2 YearsTerm Extended To:10/06/2025 |
Extension of Time | 679511 | Lodged:16:29:32 26 June 2023Type:OtherRECORDED:16:29:32 26 June 2023APPROVED:11:48:58 03 July 2023Time extended to lodge to 28 June 2023 |
Extension / Renewal of Term | 735308 | Lodged:08:30 09 June 2025Applied For Period:2 YearsRECORDED:08:30 09 June 2025 |