Extracted from MTO on 01-Jul-2025 00:49,
last changed 01-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 28-Jul-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 28-Jul-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 28-Jul-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 28-Jul-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 28-Jul-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 28-Jul-2011 | |
7 | 1 | No mining within 25 metres of either side of the Dampier to Perth Gas/Petroleum pipeline as shown in TENGRAPH.
| 28-Jul-2011 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 28-Jul-2011 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 28-Jul-2011 | |
10 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 28-Jul-2011 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer DMP. | 28-Jul-2011 | |
12 | 1 | Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 28-Jul-2011 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 28-Jul-2011 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 28-Jul-2011 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 28-Jul-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 28-Jul-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 28-Jul-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 28-Jul-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 28-Jul-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 28-Jul-2011 | |
7 | 1 | No mining within 25 metres of either side of the Dampier to Perth Gas/Petroleum pipeline as shown in TENGRAPH.
| 28-Jul-2011 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 28-Jul-2011 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 28-Jul-2011 | |
10 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 28-Jul-2011 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer DMP. | 28-Jul-2011 | |
12 | 1 | Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 28-Jul-2011 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 28-Jul-2011 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 28-Jul-2011 | |
Type | Number | Details |
Iron Ore Inclusion | 402450 | Lodged:12:10 27 July 2012RECORDED:12:10 27 July 2012AUTHORISED:00:00 10 August 2012 |
Forfeiture | 417336 | Initiated:25/01/2013 for non-compliance with expenditure conditionsRECORDED:11:00 19 February 2013Notice Issued:Regulation 50 Notice sent 25/01/2013 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:25/02/2013FINALISED:Order by Minister on 28 February 2013 that E 08/2211-I be Penalty Imposed |
Fine | 418400 | Fine in respect to:Forfeiture Process 417336Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,999.00Notification date:07/03/2013Due date:10/04/2013Pursuant to:Section 96A(5)RECORDED:07 March 2013PAYMENT RECEIVED:25 March 2013Receipt Number:06-122038Amount:$1,999.00Remaining balance:$0.00FINALISED:25 March 2013 |
Partial Surrender - Voluntary | 461993 | Lodged:16:08:28 09 February 2015Surrendered Blocks:HAMERSLEY RANGE 2923 s, t, u, x, y, z
HAMERSLEY RANGE 2924 q, y, z
HAMERSLEY RANGE 2925 t, v, w, x, y
HAMERSLEY RANGE 2995 c
HAMERSLEY RANGE 2996 c, d, e, h, j, k, o
HAMERSLEY RANGE 2997 a, fSurrendered Total:24 BL.REGISTERED:16:08:28 09 February 2015 |
Application to Amend | 466131 | Lodged:14:10 22 April 2015Amending:AddressFrom:Residential : DRAGON ENERGY LTD, SUITE 8, 1297 HAY STREET, WEST PERTH, WA, 6005 and Correspondence :DRAGON ENERGY LTD, PO BOX 1968, WEST PERTH, WA, 6872To:Residential : DRAGON ENERGY LTD, SAME AS CORRESPONDENCE and Correspondence :DRAGON ENERGY LTD, C/- ALLIANCE MINING CONSULTING, PO BOX 7174, KARAWARA, WA, 6152RECORDED:14:10 22 April 2015 |
Application to Amend | 478855 | Lodged:11:40 11 December 2015Amending:AddressFrom:DRAGON ENERGY LTD, C/- ALLIANCE MINING CONSULTING, PO BOX 7174, KARAWARA, WA, 6152To:DRAGON ENERGY LTD, C/- STELLA MINING MANAGEMENT PTY LTD, PO BOX 7174, KARAWARA, WA, 6152RECORDED:11:40 11 December 2015 |
Caveat | 484319 | Lodged:11:19:31 04 April 2016Caveat Type:Subject to Claim CaveatCaveator:SHANDONG LUNAN GEO-ENGINEERING EXPLORATION INSTITUTEShares Caveated:25/100 shares DRAGON ENERGY LTDREJECTED:11:19:31 04 April 2016 |
Caveat | 484871 | Lodged:15:19:40 11 April 2016Caveat Type:Subject to Claim CaveatCaveator:SHANDONG LUNAN GEO-ENGINEERING EXPLORATION INSTITUTEShares Caveated:25/100 shares DRAGON ENERGY LTDRECORDED:15:19:40 11 April 2016LAPSED:Midnight 06 August 2019RE Surrender - Outright 558729 - 14 day letter sent |
Extension / Renewal of Term | 491181 | Lodged:08:30 26 July 2016Applied For Period:5 YearsRECORDED:08:30 26 July 2016GRANTED:17 November 2016Granted Period:5 YearsTerm Extended To:27/07/2021 |
Application to Amend | 498180 | Lodged:11:20:39 07 December 2016Amending:Address (Including DTC Details)From:DRAGON ENERGY LTD, C/- STELLA MINING MANAGEMENT PTY LTD, PO BOX 7174, KARAWARA, WA, 6152To:DRAGON ENERGY LTD, NINA MAS, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxx@atmwa.net.au, xxxxx241RECORDED:11:20:39 07 December 2016 |
Application to Amend | 502547 | Lodged:11:21:24 14 March 2017Amending:NameFrom:DRAGON ENERGY LTDTo:RIVA RESOURCES LIMITEDRECORDED:11:21:24 14 March 2017 |
Surrender - Outright | 558307 | Lodged:08:41:17 12 July 2019REJECTED:08:41:17 12 July 2019 |
Surrender - Outright | 558729 | Lodged:13:30 19 July 2019RE Caveat 484871 - 14 day letter sent 23 July 19REGISTERED:13:30 19 July 2019 |