1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 15-Jun-2011 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-Dec-2024 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 15-Jun-2011 | 18-Dec-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Jun-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Jun-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Jun-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Jun-2011 | |
7 | 1 | No interference with Geodetic Survey Station R638 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 15-Jun-2011 | |
8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-Dec-2024 | |
9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 19-Dec-2024 | |
10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 19-Dec-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 15-Jun-2011 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-Dec-2024 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 15-Jun-2011 | 18-Dec-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Jun-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Jun-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Jun-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Jun-2011 | |
7 | 1 | No interference with Geodetic Survey Station R638 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 15-Jun-2011 | |
8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-Dec-2024 | |
9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 19-Dec-2024 | |
10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 19-Dec-2024 | |
Type | Number | Details |
Application to Amend | 383064 | Lodged:11:31 20 September 2011Amending:AddressFrom:CAULDRON ENERGY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638, PERTH BUSINESS CENTRE, WA, 6849To:CAULDRON ENERGY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931RECORDED:11:31 20 September 2011 |
Application to Amend | 397008 | Lodged:13:30 08 May 2012Amending:AddressFrom:Residential : CAULDRON ENERGY LTD, SAME AS CORRESPONDENCE and Correspondence :CAULDRON ENERGY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Residential : CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and Correspondence :CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST PERTH, WA, 6901RECORDED:13:30 08 May 2012 |
Forfeiture | 406013 | Initiated:14/09/2012 for non-compliance with reporting requirements( Form 5 )WITHDRAWN:14 September 2012 (new list to be created)Notice Issued:Regulation 50 Notice sent 14/09/2012 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:22/10/2012 |
Forfeiture | 406041 | Initiated:18/09/2012 for non-compliance with reporting requirements( Form 5 )RECORDED:14:31:06 14 September 2012Notice Issued:Regulation 50 Notice sent 18/09/2012 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:22/10/2012FINALISED:Order by Minister on 16 November 2012 that E 08/2205 be Penalty Imposed |
Extension of Time | 407928 | Lodged:09:30 09 October 2012Type:Exemption from ExpenditureRECORDED:09:30 09 October 2012REFUSED:10:40 15 October 2012 |
Forfeiture | 410871 | Initiated:15/11/2012 for non-compliance with expenditure requirementsRECORDED:16:00:10 14 November 2012Notice Issued:Regulation 50 Notice sent 15/11/2012 for non-compliance with expenditure requirements pursuant to Reg 21/Sec 63A- under expended.Compliance Date:19/12/2012FINALISED:Order by Minister on 07 June 2013 that E 08/2205 be Penalty Imposed |
Fine | 411440 | Fine in respect to:Forfeiture Process 406041Fine reason:Non-compliance with expenditure obligationsPenalty amount:$90.00Notification date:22/11/2012Due date:28/12/2012Pursuant to:Section 96A(5)RECORDED:22 November 2012PAYMENT RECEIVED:18 December 2012Receipt Number:06-118711Amount:$90.00Remaining balance:$0.00FINALISED:18 December 2012 |
Application to Amend | 417992 | Lodged:09:30 28 February 2013Amending:AddressFrom:CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST PERTH, WA, 6901To:CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901RECORDED:09:30 28 February 2013 |
Fine | 424773 | Fine in respect to:Forfeiture Process 410871Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,234.00Notification date:10/06/2013Due date:10/07/2013Pursuant to:Section 96A(5)RECORDED:07 June 2013PAYMENT RECEIVED:18 June 2013Receipt Number:06-125133Amount:$1,234.00Remaining balance:$0.00FINALISED:18 June 2013 |
Application to Amend | 435592 | Lodged:09:00 22 November 2013Amending:AddressFrom:Residential : CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and Correspondence :CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901To:Residential : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and Correspondence :CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901RECORDED:09:00 22 November 2013 |
Extension / Renewal of Term | 488223 | Lodged:13:24:41 10 June 2016Applied For Period:5 YearsRECORDED:13:24:41 10 June 2016GRANTED:25 August 2016Granted Period:5 YearsTerm Extended To:14/06/2021 |
Application to Amend | 512344 | Lodged:13:48:12 10 August 2017Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and DTC :CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901To:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, NGAIRE KOCH, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555RECORDED:13:48:12 10 August 2017 |
Application to Amend | 524209 | Lodged:15:11:18 21 February 2018Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, NGAIRE KOCH, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555To:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555RECORDED:15:11:18 21 February 2018 |
Application to Amend | 618461 | Lodged:08:30 23 March 2021Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555To:Principal Place of Business : CAULDRON ENERGY LTD, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941RECORDED:08:30 23 March 2021 |
Application to Amend | 620719 | Lodged:15:18:10 20 April 2021Amending:Address (Including DTC Details)From:CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941To:CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941RECORDED:15:18:10 20 April 2021 |
Extension / Renewal of Term | 626096 | Lodged:08:30 14 June 2021Applied For Period:2 YearsRECORDED:08:30 14 June 2021GRANTED:16 August 2021Granted Period:2 YearsTerm Extended To:14/06/2023 |
Extension / Renewal of Term | 678408 | Lodged:11:00:57 13 June 2023Applied For Period:2 YearsRECORDED:11:00:57 13 June 2023GRANTED:08 September 2023Granted Period:2 YearsTerm Extended To:14/06/2025 |
Extension / Renewal of Term | 735717 | Lodged:11:14:33 13 June 2025Applied For Period:2 YearsRECORDED:11:14:33 13 June 2025 |