1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Aug-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 18-Aug-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Aug-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Aug-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Aug-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Aug-2011 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Aug-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 18-Aug-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Aug-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Aug-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Aug-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Aug-2011 | |
Type | Number | Details |
Iron Ore Inclusion | 353208 | Lodged:12:07 11 August 2010RECORDED:12:07 11 August 2010AUTHORISED:00:00 18 August 2011 |
Forfeiture | 428054 | Initiated:16/07/2013 for non-compliance with expenditure conditionsRECORDED:16:00 30 July 2012Notice Issued:Regulation 50 Notice sent 16/07/2013 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:15/08/2013FINALISED:Order by Minister on 22 August 2013 that E 08/2200-I be Penalty Imposed |
Application to Amend | 395606 | Lodged:15:45 11 March 2013Amending:AddressFrom:FMG PILBARA PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:15:45 11 March 2013 |
Fine | 429615 | Fine in respect to:Forfeiture Process 428054Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,425.00Notification date:23/08/2013Due date:25/09/2013Pursuant to:Section 96A(5)RECORDED:23 August 2013PAYMENT RECEIVED:29 August 2013Receipt Number:06-127862Amount:$1,425.00Remaining balance:$0.00FINALISED:29 August 2013 |
Extension / Renewal of Term | 492375 | Lodged:15:49:48 16 August 2016Applied For Period:5 YearsRECORDED:15:49:48 16 August 2016GRANTED:10 November 2016Granted Period:5 YearsTerm Extended To:17/08/2021 |
Surrender - Outright | 541712 | Lodged:14:42:21 31 October 2018REGISTERED:14:42:21 31 October 2018 |