Tenement: E08-2137

View on Landtracker Maps (logon required)

Extracted from MTO on 12-Jul-2025 00:49, last changed 26-Jun-2025.

Tenement Summary

Identifier:E 08/2137-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:7 BL
Purposes:Term:5 Years (Extended)
Markout:Received:13-Apr-2010 14:08
Commence:19-Apr-2013 Expiry:18-Apr-2027

Holders

Company NameSharesTotal Shares
ZANTHUS RESOURCES PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
FMG PILBARA PTY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25013-Apr-2010 7.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.19-Apr-2013
22All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.04-Oct-2024
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.19-Apr-2013 03-Oct-2024
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.19-Apr-2013
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.19-Apr-2013
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.19-Apr-2013
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
19-Apr-2013
71No exploration activities being carried out on Stock Route Reserve 9701 which restrict the use of the reserve.19-Apr-2013
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Crown Reserve 41787.19-Apr-2013
91All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.04-Oct-2024
101The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.04-Oct-2024
111All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.04-Oct-2024

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.19-Apr-2013
22All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.04-Oct-2024
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.19-Apr-2013 03-Oct-2024
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.19-Apr-2013
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.19-Apr-2013
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.19-Apr-2013
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
19-Apr-2013
71No exploration activities being carried out on Stock Route Reserve 9701 which restrict the use of the reserve.19-Apr-2013
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Crown Reserve 41787.19-Apr-2013
91All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.04-Oct-2024
101The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.04-Oct-2024
111All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.04-Oct-2024

Dealings

TypeNumberDetails
Iron Ore Inclusion345537Lodged:11:23 27 April 2010RECORDED:11:23 27 April 2010AUTHORISED:00:00 19 April 2013
Application to Amend395606Lodged:15:45 11 March 2013Amending:AddressFrom:FMG PILBARA PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:15:45 11 March 2013
Forfeiture495005Initiated:27/09/2016 for non-compliance with expenditure conditionsRECORDED:10:00 06 October 2016Notice Issued:Regulation 50 Notice sent 27/09/2016 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:01/11/2016FINALISED:Order by Minister on 03 November 2016 that E 08/2137-I be Penalty Imposed
Fine496498Fine in respect to:Forfeiture Process 495005Fine reason:Non-compliance with expenditure obligationsPenalty amount:$3,928.00Notification date:04/11/2016Due date:09/12/2016Pursuant to:Section 96A(5)RECORDED:04 November 2016PAYMENT RECEIVED:14 November 2016FINALISED:14 November 2016Receipt Number:06-157469Amount:$3,928.00Remaining balance:$0.00
Extension / Renewal of Term527583Lodged:14:09:53 10 April 2018Applied For Period:5 YearsRECORDED:14:09:53 10 April 2018GRANTED:19 June 2018Granted Period:5 YearsTerm Extended To:18/04/2023
Partial Surrender - Compulsory549522Lodged:11:24:55 18 March 2019Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 1608 m, r, w, x HAMERSLEY RANGE 1680 b, c, g, h, m, n, o, r, s, t, w, x, y HAMERSLEY RANGE 1751 e, k HAMERSLEY RANGE 1752 a, b, c, d, f, g, h, j, lSurrendered Total:28 BL.REGISTERED:Midnight 18 April 2019Surrendered area to be released 08:30:00 16/05/2019 under Section 65 (3)Surrendered area released 08:30:00 16/05/2019 under Section 65 (3)
Application to Amend587109Lodged:10:26:02 25 September 2020Amending:Address (Including DTC Details)From:Principal Place of Business : FMG PILBARA PTY LTD, SAME AS CORRESPONDENCE and DTC :FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004To:Principal Place of Business : FMG PILBARA PTY LTD, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxxxxxxxxxxxx@fmgl.com.au and DTC :FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxxxxxxxxxxxx@fmgl.com.auRECORDED:10:26:02 25 September 2020
Application to Amend587934Lodged:15:58 08 October 2020Amending:Address (Including DTC Details)From:FMG PILBARA PTY LTD, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxxxxxxxxxxxx@fmgl.com.auTo:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxxxxxxxxxxxx@fmgl.com.auRECORDED:15:58 08 October 2020
Partial Surrender - Voluntary627295Lodged:13:55:11 01 July 2021Surrendered Blocks:HAMERSLEY RANGE 1608 b, c, d, e, g, h, j, k, n, o, p, s, t, u, y, z HAMERSLEY RANGE 1609 q, v HAMERSLEY RANGE 1680 d, e, j, k, p, u, z HAMERSLEY RANGE 1681 a, f, l, m, q, r, v, w HAMERSLEY RANGE 1753 b, cSurrendered Total:35 BL.REGISTERED:13:55:11 01 July 2021
Application to Amend670270Lodged:08:30 07 March 2023Amending:Address (Including DTC Details)From:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxxxxxxxxxxxx@fmgl.com.auTo:FMG PILBARA PTY LTD, SUITE 9, LEVEL 3, 47 HAVELOCK STREET, WEST PERTH, WA, 6005, xxxxx@czrresources.com, xxxxxxx050RECORDED:08:30 07 March 2023
Application to Amend670272Lodged:08:30 07 March 2023Amending:Address (Including DTC Details)From:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxxxxxxxxxxxx@fmgl.com.auTo:FMG PILBARA PTY LTD, CZR RESOURCES LTD, PO BOX 16, WEST PERTH, WA, 6872, xxxxx@czrresources.com, xxxxxxxxx050RECORDED:08:30 07 March 2023
Extension / Renewal of Term673279Lodged:11:42:32 13 April 2023Applied For Period:2 YearsRECORDED:11:42:32 13 April 2023GRANTED:05 July 2023Granted Period:2 YearsTerm Extended To:18/04/2025
Caveat685655Lodged:09:21:13 11 September 2023Caveat Type:Consent CaveatCaveator:FMG PILBARA PTY LTDShares Caveated:100/100 shares ZANTHUS RESOURCES PTY LTDRECORDED:09:21:13 11 September 2023
Excess Tonnage698005Lodged:08:30 06 March 2024RECORDED:08:30 06 March 2024Approved Additional Tonnes:9,000GRANTED:15:30:43 03 May 2024
Extension / Renewal of Term731447Lodged:12:18:34 17 April 2025Applied For Period:2 YearsRECORDED:12:18:34 17 April 2025GRANTED:23 June 2025Granted Period:2 YearsTerm Extended To:18/04/2027

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202611-Apr-2025 10798694$5,488.007 BL01-Jul-2021 $5,488.00$0.00
Rental202517-Apr-2024 10549424$5,229.007 BL01-Jul-2021 $5,229.00$0.00
Rental202414-Apr-2023 10348057$4,977.007 BL01-Jul-2021 $4,977.00$0.00
Rental202302-May-2022 10259737$4,739.007 BL01-Jul-2021 $4,739.00$0.00
Rental202221-Apr-2021 10193135$25,830.0042 BL18-Apr-2019 $25,830.00$0.00
Rental202121-Apr-2020 10141521$25,242.0042 BL18-Apr-2019 $25,242.00$0.00
Rental202028-May-2019 (REFUND) FIL-16684$8,400.0042 BL18-Apr-2019 $12,600.00$0.00
Rental202029-Apr-2019 10093887$21,000.00
Rental201910-Apr-2018 9085978436$19,810.0070 BL19-Apr-2013 $19,810.00$0.00
Rental201819-Apr-2017 MT-210011030176-DD$14,101.5070 BL19-Apr-2013 $14,101.50$0.00
Rental201722-Apr-2016 MT-210010581329-DD$13,639.5070 BL19-Apr-2013 $13,639.50$0.00
Rental201629-Apr-2015 MT-210010252367-DD$8,547.0070 BL19-Apr-2013 $8,547.00$0.00
Rental201522-Apr-2014 MT-210010174153-DD$8,330.0070 BL19-Apr-2013 $8,330.00$0.00
Rental201413-Apr-2010 2448KARRATHA$7,546.0070 BL19-Apr-2013 $7,546.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$70,000.00false
2025$70,000.0022-May-2025 $132,151.69$66,485.87$0.00$44,760.09$6,905.73$14,000.00$0.00false
2024$70,000.0014-Jun-2024 $95,953.09$63,134.09$0.00$12,212.50$6,606.50$14,000.00$0.00false
2023$70,000.0016-Jun-2023 $143,713.19$86,333.31$0.00$37,114.88$6,265.00$14,000.00$0.00false
2022Replacement$84,000.0008-Jun-2022 $60,974.0065037527-May-2022 $84,000.00Granted22-Jul-2022 $28,237.00$0.00$0.00$31,290.00$1,447.00$0.00false
2022$84,000.0027-May-2022 $60,974.00$28,237.00$0.00$0.00$31,290.00$1,447.00$0.00true
2021$126,000.0009-Jun-2021 $74,664.0062592809-Jun-2021 $126,000.00Granted23-Jul-2021 $36,165.00$0.00$0.00$30,597.00$7,902.00$0.00false
2020Replacement$84,000.0002-Feb-2021 $95,480.00$56,009.00$0.00$3,488.00$25,575.00$10,408.00$0.00false
2020$84,000.0020-May-2020 $91,998.00$56,015.00$0.00$0.00$25,575.00$10,408.00$0.00true
2019$140,000.0007-Jun-2019 $110,507.0055560007-Jun-2019 $140,000.00Granted17-Jul-2019 $48,272.00$0.00$27,156.00$28,476.00$6,603.00$0.00false
2018$105,000.0014-Jun-2018 $41,224.0053271614-Jun-2018 $105,000.00Granted24-Jul-2018 $17,623.00$0.00$0.00$22,769.00$832.00$0.00false
2017$105,000.0007-Jun-2017 $51,199.0050777707-Jun-2017 $105,000.00Granted19-Jul-2017 $8,176.00$0.00$0.00$22,023.00$21,000.00$0.00false
2016$70,000.0002-Jun-2016 $30,720.0048776602-Jun-2016 $70,000.00Refused27-Sep-2016 $0.00$0.00$0.00$16,720.00$14,000.00$0.00false
2015$70,000.0002-Jun-2015 $135,980.00$104,996.00$0.00$0.00$9,985.00$20,999.00$0.00false
2014$70,000.0011-Jun-2014 $30,728.0044855511-Jun-2014 $70,000.00Granted31-Oct-2014 $1,000.00$0.00$0.00$15,728.00$14,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
03-Jun-2010 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2012-01-112012-05-11CLEARED - Expedited Applies2013-04-1270 BL215529S1155830E48km SW'ly from PannawonicaWO12/4172012-06-07WC1999/012Objection Withdrawn Agreement2013-04-11Kuruma Marthudunera (combined)(WC1999/012)WC1999/012WAD6090/1998falseDetermined12PilbaraYamatji Marlpa Aboriginal Corporation