Extracted from MTO on 04-Jul-2025 00:38,
last changed 01-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 30-Jul-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 30-Jul-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Jul-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Jul-2013 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 30-Jul-2013 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 30-Jul-2013 | |
7 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 30-Jul-2013 | |
8 | 1 | No mining within 25 metres of either side of Pipeline Licences 16 and 19 as shown in TENGRAPH.
| 30-Jul-2013 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 30-Jul-2013 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 30-Jul-2013 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 30-Jul-2013 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer DMP. | 30-Jul-2013 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 30-Jul-2013 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 30-Jul-2013 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 30-Jul-2013 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 30-Jul-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 30-Jul-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Jul-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Jul-2013 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 30-Jul-2013 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 30-Jul-2013 | |
7 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 30-Jul-2013 | |
8 | 1 | No mining within 25 metres of either side of Pipeline Licences 16 and 19 as shown in TENGRAPH.
| 30-Jul-2013 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 30-Jul-2013 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 30-Jul-2013 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 30-Jul-2013 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer DMP. | 30-Jul-2013 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 30-Jul-2013 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 30-Jul-2013 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 30-Jul-2013 | |
Type | Number | Details |
Objection | KR61/090 | Lodged:08:32 25 September 2009Objectors:FORREST AND FORREST PTY LTDObjection Type:Tenement ApplicationRECORDED:08:32 25 September 2009WITHDRAWN:10:00 10 February 2012 |
Application to Amend | 346429 | Lodged:12:55 04 May 2010Amending:AddressFrom:MINE SERVICES AND CONSTRUCTION PTY LTD, P O BOX 613, COTTESLOE, WA, 6011To:MINE SERVICES AND CONSTRUCTION PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008RECORDED:12:55 04 May 2010 |
Application to Amend | 399522 | Lodged:14:45 14 June 2012Amending:AddressFrom:MINE SERVICES AND CONSTRUCTION PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:MINE SERVICES AND CONSTRUCTION PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:14:45 14 June 2012 |
Application to Amend | 467599 | Lodged:15:30 15 May 2015Amending:AddressFrom:Residential : PILBARA PROPERTY MANAGEMENT PTY LTD, SAME AS CORRESPONDENCE and Correspondence :PILBARA PROPERTY MANAGEMENT PTY LTD, 80 BIRDWOOD PARADE, DALKEITH, WA, 6009To:Residential : PILBARA PROPERTY MANAGEMENT PTY LTD, ADDRESS NOT PROVIDED and Correspondence :PILBARA PROPERTY MANAGEMENT PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849RECORDED:15:30 15 May 2015 |
Application to Amend | 490197 | Lodged:13:09:24 07 July 2016Amending:Address (Including DTC Details)From:SQUADRON RESOURCES PTY LTD, C/-HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849To:SQUADRON RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:13:09:24 07 July 2016 |
Application to Amend | 531446 | Lodged:15:47:31 29 May 2018Amending:Address (Including DTC Details)From:SQUADRON RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:SQUADRON RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:15:47:31 29 May 2018 |
Extension / Renewal of Term | 535666 | Lodged:15:14:29 23 July 2018Applied For Period:5 YearsRECORDED:15:14:29 23 July 2018GRANTED:25 September 2018Granted Period:5 YearsTerm Extended To:29/07/2023 |
Application to Amend | 554325 | Lodged:15:35 21 May 2019Amending:Address (Including DTC Details)From:Principal Place of Business : SQUADRON RESOURCES PTY LTD, SAME AS CORRESPONDENCE and DTC :SQUADRON RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : SQUADRON RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :SQUADRON RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxx977RECORDED:15:35 21 May 2019 |
Application to Amend | 581636 | Lodged:11:28:02 08 July 2020From:SQUADRON RESOURCES PTY LTDAmending:NameTo:WYLOO METALS PTY LTDREJECTED:11:28:02 08 July 2020 |
Application to Amend | 581792 | Lodged:08:30 10 July 2020Amending:NameFrom:SQUADRON RESOURCES PTY LTDTo:WYLOO METALS PTY LTDRECORDED:08:30 10 July 2020 |
Application to Amend | 590133 | Lodged:14:30 11 November 2020REJECTED:14:30 11 November 2020Relodged:11:12 13 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO METALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :WYLOO METALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxx977To:Principal Place of Business : WYLOO METALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :WYLOO METALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxx977RECORDED:11:12 13 November 2020 |
Application to Amend | 633392 | Lodged:13:18:54 01 October 2021Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO METALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :WYLOO METALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxx977To:Principal Place of Business : WYLOO METALS PTY LTD, 171-173 MOUNTS BAY ROAD, PERTH, WA, 6000, xxxxxxxxx@wyloometals.com, xxxxxxx949 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 3155, BROADWAY NEDLANDS, WA, 6009, xxxxxxxxx@wyloometals.com, xxxxxxx949RECORDED:13:18:54 01 October 2021 |
Extension / Renewal of Term | 681598 | Lodged:10:39:31 20 July 2023Applied For Period:2 YearsRECORDED:10:39:31 20 July 2023GRANTED:12 October 2023Granted Period:2 YearsTerm Extended To:29/07/2025 |
Application to Amend | 688493 | Lodged:12:09:55 24 October 2023Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO METALS PTY LTD, 171-173 MOUNTS BAY ROAD, PERTH, WA, 6000, xxxxxxxxx@wyloometals.com, xxxxxxx949 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 3155, BROADWAY NEDLANDS, WA, 6009, xxxxxxxxx@wyloometals.com, xxxxxxx949To:Principal Place of Business : WYLOO METALS PTY LTD, LEVEL 1, 8 RICHARDSON STREET, WEST PERTH, WA, 6005, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 1810, WEST PERTH, WA, 6872, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200RECORDED:12:09:55 24 October 2023 |
Application to Amend | 720693 | Lodged:10:36:23 28 November 2024Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO METALS PTY LTD, LEVEL 1, 8 RICHARDSON STREET, WEST PERTH, WA, 6005, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 1810, WEST PERTH, WA, 6872, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200To:Principal Place of Business : WYLOO METALS PTY LTD, LEVEL 8, TOWER 3 CAPITAL SQUARE, 1 SPRING STREET, PERTH, WA, 6000, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 7142, CLOISTERS SQUARE, PERTH, WA, 6850, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200RECORDED:10:36:23 28 November 2024 |
Application to Amend | 720697 | Lodged:10:56:29 28 November 2024Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO METALS PTY LTD, LEVEL 1, 8 RICHARDSON STREET, WEST PERTH, WA, 6005, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 1810, WEST PERTH, WA, 6872, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200To:Principal Place of Business : WYLOO METALS PTY LTD, LEVEL 8, TOWER 3 CAPITAL SQUARE, 1 SPRING STREET, PERTH, WA, 6000, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200 and DTC :WYLOO METALS PTY LTD, WYLOO METALS PTY LTD, PO BOX 7142, CLOISTERS SQUARE, PERTH, WA, 6850, xxxxxxxxx@wyloo.com, xxxxxxxxxxxx200RECORDED:10:56:29 28 November 2024 |