1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 06-Jan-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 06-Jan-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-Jan-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-Jan-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-Jan-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-Jan-2011 | |
7 | 1 | No interference with Geodetic Survey Station WYLOO 58 & 59 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 06-Jan-2011 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 06-Jan-2011 | |
9 | 1 | No mining within 25 metres of either side of the Dampier to Perth Gas/Petroleum pipeline as shown in TENGRAPH.
| 06-Jan-2011 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 06-Jan-2011 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 06-Jan-2011 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 06-Jan-2011 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP. | 06-Jan-2011 | |
14 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 06-Jan-2011 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 06-Jan-2011 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 06-Jan-2011 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 06-Jan-2011 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 06-Jan-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-Jan-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-Jan-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-Jan-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-Jan-2011 | |
7 | 1 | No interference with Geodetic Survey Station WYLOO 58 & 59 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 06-Jan-2011 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 06-Jan-2011 | |
9 | 1 | No mining within 25 metres of either side of the Dampier to Perth Gas/Petroleum pipeline as shown in TENGRAPH.
| 06-Jan-2011 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 06-Jan-2011 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 06-Jan-2011 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 06-Jan-2011 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP. | 06-Jan-2011 | |
14 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 06-Jan-2011 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 06-Jan-2011 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 06-Jan-2011 | |
Type | Number | Details |
Iron Ore Inclusion | 322468 | Lodged:11:13 04 June 2009RECORDED:11:13 04 June 2009AUTHORISED:00:00 06 January 2011 |
Application to Amend | 395606 | Lodged:15:45 11 March 2013Amending:AddressFrom:FMG PILBARA PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:15:45 11 March 2013 |
Application to Amend | 420704 | Lodged:16:10 10 April 2013Amending:AddressFrom:Residential : FMG PILBARA PTY LTD, SAME AS CORRESPONDENCE and Correspondence :FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004To:Residential : FMG PILBARA PTY LTD, ADDRESS NOT PROVIDED and Correspondence :FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:16:10 10 April 2013 |
Application to Amend | 476089 | Lodged:14:51:26 19 October 2015Amending:AddressFrom:FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:FMG PILBARA PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:14:51:26 19 October 2015 |
Extension / Renewal of Term | 479189 | Lodged:11:34:09 18 December 2015Applied For Period:5 YearsRECORDED:11:34:09 18 December 2015GRANTED:02 June 2016Granted Period:5 YearsTerm Extended To:05/01/2021 |
Application to Amend | 485406 | Lodged:14:01:11 20 April 2016Amending:AddressFrom:FMG PILBARA PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:14:01:11 20 April 2016 |
Partial Surrender - Voluntary | 507448 | Lodged:14:33 01 June 2017Surrendered Blocks:HAMERSLEY RANGE 2407 y, zSurrendered Total:2 BL.REGISTERED:14:33 01 June 2017 |
Extension of Time | 551044 | Lodged:08:30 05 April 2019Type:Stat DecRECORDED:08:30 05 April 2019APPROVED:10:25:34 08 April 2019Time to lodge extended to 04/04/2019 |
Surrender - Outright | 558857 | Lodged:09:31:47 23 July 2019REGISTERED:09:31:47 23 July 2019 |