Tenement: E08-2003

View on Landtracker Maps (logon required)

Extracted from MTO on 25-Jun-2025 00:34, last changed 10-Jan-2024.

Tenement Summary

Identifier:E 08/2003-IType:Exploration Licence
Status:DeadDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:4 BL
Purposes:Term:5 Years (Extended)
Markout:Received:21-May-2009 12:10
Commence:06-Jan-2011 Expiry:05-Jan-2021

Holders

Company NameSharesTotal Shares
FMG PILBARA PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
FMG PILBARA PTY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25021-May-2009 4.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.06-Jan-2011
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.06-Jan-2011
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.06-Jan-2011
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.06-Jan-2011
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.06-Jan-2011
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
06-Jan-2011
71No interference with Geodetic Survey Station WYLOO 58 & 59 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.06-Jan-2011
81No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.06-Jan-2011
91No mining within 25 metres of either side of the Dampier to Perth Gas/Petroleum pipeline as shown in TENGRAPH.
06-Jan-2011
101No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP06-Jan-2011
111No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.06-Jan-2011
121The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP06-Jan-2011
131No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.06-Jan-2011
141Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .06-Jan-2011
151The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.06-Jan-2011
161Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.06-Jan-2011

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.06-Jan-2011
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.06-Jan-2011
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.06-Jan-2011
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.06-Jan-2011
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.06-Jan-2011
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
06-Jan-2011
71No interference with Geodetic Survey Station WYLOO 58 & 59 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.06-Jan-2011
81No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.06-Jan-2011
91No mining within 25 metres of either side of the Dampier to Perth Gas/Petroleum pipeline as shown in TENGRAPH.
06-Jan-2011
101No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP06-Jan-2011
111No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.06-Jan-2011
121The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP06-Jan-2011
131No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.06-Jan-2011
141Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .06-Jan-2011
151The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.06-Jan-2011
161Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.06-Jan-2011

Dealings

TypeNumberDetails
Iron Ore Inclusion322468Lodged:11:13 04 June 2009RECORDED:11:13 04 June 2009AUTHORISED:00:00 06 January 2011
Application to Amend395606Lodged:15:45 11 March 2013Amending:AddressFrom:FMG PILBARA PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:15:45 11 March 2013
Application to Amend420704Lodged:16:10 10 April 2013Amending:AddressFrom:Residential : FMG PILBARA PTY LTD, SAME AS CORRESPONDENCE and Correspondence :FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004To:Residential : FMG PILBARA PTY LTD, ADDRESS NOT PROVIDED and Correspondence :FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:16:10 10 April 2013
Application to Amend476089Lodged:14:51:26 19 October 2015Amending:AddressFrom:FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:FMG PILBARA PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:14:51:26 19 October 2015
Extension / Renewal of Term479189Lodged:11:34:09 18 December 2015Applied For Period:5 YearsRECORDED:11:34:09 18 December 2015GRANTED:02 June 2016Granted Period:5 YearsTerm Extended To:05/01/2021
Application to Amend485406Lodged:14:01:11 20 April 2016Amending:AddressFrom:FMG PILBARA PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:14:01:11 20 April 2016
Partial Surrender - Voluntary507448Lodged:14:33 01 June 2017Surrendered Blocks:HAMERSLEY RANGE 2407 y, zSurrendered Total:2 BL.REGISTERED:14:33 01 June 2017
Extension of Time551044Lodged:08:30 05 April 2019Type:Stat DecRECORDED:08:30 05 April 2019APPROVED:10:25:34 08 April 2019Time to lodge extended to 04/04/2019
Surrender - Outright558857Lodged:09:31:47 23 July 2019REGISTERED:09:31:47 23 July 2019

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202008-Jan-2019 10081746$2,268.004 BL01-Jun-2017 $2,268.00$0.00
Rental201908-Jan-2018 7948832634$2,140.004 BL01-Jun-2017 $2,140.00$0.00
Rental201809-Jan-2017 MT-210010892694-DD$1,640.106 BL06-Jan-2011 $1,640.10$0.00
Rental201708-Dec-2015 MT-210010454236-DD$1,586.106 BL06-Jan-2011 $1,586.10$0.00
Rental201604-Dec-2014 MT-210010220576-DD$1,139.406 BL06-Jan-2011 $1,139.40$0.00
Rental201510-Dec-2013 MT-210010149487-DD$1,110.606 BL06-Jan-2011 $1,110.60$0.00
Rental201408-Jan-2013 06-119142PERTH$700.206 BL06-Jan-2011 $700.20$0.00
Rental201310-Jan-2012 06-104684PERTH$681.006 BL06-Jan-2011 $681.00$0.00
Rental201215-Dec-2010 87895PERTH$62.106 BL06-Jan-2011 $683.10$0.00
Rental201221-May-2009 1251KARRATHA$621.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2020$29,167.0012-Sep-2019 $8,559.00$6,291.00$0.00$0.00$2,268.00$0.00$0.00false
2019$50,000.0006-Mar-2019 $13,161.0054886006-Mar-2019 $50,000.00Granted11-Apr-2019 $9,671.00$0.00$0.00$3,290.00$200.00$0.00false
2018$38,334.0006-Mar-2018 $15,251.0052487906-Mar-2018 $38,334.00Granted23-May-2018 $12,316.00$0.00$57.00$2,678.00$200.00$0.00false
2017$50,000.0007-Mar-2017 $51,287.00$25,935.00$0.00$12,841.00$2,511.00$10,000.00$0.00false
2016$30,000.0019-Feb-2016 $47,952.00$39,165.00$0.00$0.00$1,586.00$7,201.00$0.00false
2015$30,000.0017-Feb-2015 $148,787.00$125,851.00$0.00$0.00$1,936.00$21,000.00$0.00false
2014$20,000.0026-Feb-2014 $11,099.0044108826-Feb-2014 $20,000.00Granted30-Jun-2014 $5,438.00$0.00$0.00$1,661.00$4,000.00$0.00false
2013$20,000.0028-Feb-2013 $24,002.00$5,734.00$0.00$13,037.00$1,231.00$4,000.00$0.00false
2012$20,000.0002-Mar-2012 $3,417.0039263102-Mar-2012 $20,000.00Granted30-Apr-2012 $1,676.00$0.00$0.00$1,406.00$335.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
15-Jun-2010 Tenement ApplicationNT Cleared