Extracted from MTO on 01-Jul-2025 00:55,
last changed 01-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 19-Apr-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 19-Apr-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Apr-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Apr-2013 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Apr-2013 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Apr-2013 | |
7 | 1 | No mining within 25 metres of either side of the Gas Pipeline.
| 19-Apr-2013 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 19-Apr-2013 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas pipeline. | 19-Apr-2013 | |
10 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 19-Apr-2013 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer DMP. | 19-Apr-2013 | |
12 | 1 | Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 19-Apr-2013 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 19-Apr-2013 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 19-Apr-2013 | |
| 1 | Consent to conduct exploration activities on Stock Route Reserve 9701 granted, subject to:
| 19-Apr-2013 | |
15 | 1 | No exploration activities being carried out on Stock Route Reserve 9701 which restrict the use of the reserve. | 19-Apr-2013 | |
16 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- "Programme of Work on E08/1878 for Fortescue" (Reg ID 40154) dated 19 August 2013 signed by Andrew Winzer and retained on Department of Mines and Petroleum File No. EARS-POW-40154
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
| 09-Oct-2013 | |
17 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 09-Oct-2013 | |
18 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 09-Oct-2013 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 19-Apr-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 19-Apr-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Apr-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Apr-2013 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Apr-2013 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Apr-2013 | |
7 | 1 | No mining within 25 metres of either side of the Gas Pipeline.
| 19-Apr-2013 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 19-Apr-2013 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas pipeline. | 19-Apr-2013 | |
10 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 19-Apr-2013 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer DMP. | 19-Apr-2013 | |
12 | 1 | Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 19-Apr-2013 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 19-Apr-2013 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 19-Apr-2013 | |
| 1 | Consent to conduct exploration activities on Stock Route Reserve 9701 granted, subject to:
| 19-Apr-2013 | |
15 | 1 | No exploration activities being carried out on Stock Route Reserve 9701 which restrict the use of the reserve. | 19-Apr-2013 | |
16 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- "Programme of Work on E08/1878 for Fortescue" (Reg ID 40154) dated 19 August 2013 signed by Andrew Winzer and retained on Department of Mines and Petroleum File No. EARS-POW-40154
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
| 09-Oct-2013 | |
17 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 09-Oct-2013 | |
18 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 09-Oct-2013 | |
Type | Number | Details |
Application to Amend | 395606 | Lodged:15:45 11 March 2013Amending:AddressFrom:FMG PILBARA PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:15:45 11 March 2013 |
Application to Amend | 420704 | Lodged:16:10 10 April 2013Amending:AddressFrom:Residential : FMG PILBARA PTY LTD, SAME AS CORRESPONDENCE and Correspondence :FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004To:Residential : FMG PILBARA PTY LTD, ADDRESS NOT PROVIDED and Correspondence :FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:16:10 10 April 2013 |
Application to Amend | 467238 | Lodged:13:34:28 11 May 2015Amending:AddressFrom:FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:FMG PILBARA PTY LTD, AQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379, HAY STREET, EAST PERTH, WA, 6004RECORDED:13:34:28 11 May 2015 |
Application to Amend | 481887 | Lodged:13:55:57 18 February 2016Amending:AddressFrom:FMG PILBARA PTY LTD, AQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379, HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:13:55:57 18 February 2016 |
Partial Surrender - Voluntary | 486813 | Lodged:16:05 16 May 2016Surrendered Blocks:HAMERSLEY RANGE 2042 s, t, u, x, y, z
HAMERSLEY RANGE 2043 q, v, w
HAMERSLEY RANGE 2114 c, d, e, h, j, k, n, o, p, s, t
HAMERSLEY RANGE 2115 a, b, c, f, g, h, j, l, m, n, o, r, s, t, x, y, z
HAMERSLEY RANGE 2187 d, eSurrendered Total:39 BL.REGISTERED:16:05 16 May 2016 |
Extension / Renewal of Term | 527744 | Lodged:10:35:16 12 April 2018Applied For Period:5 YearsRECORDED:10:35:16 12 April 2018GRANTED:19 June 2018Granted Period:5 YearsTerm Extended To:18/04/2023 |
Surrender - Outright | 555634 | Lodged:14:58:33 07 June 2019REGISTERED:14:58:33 07 June 2019 |