Tenement: E08-1878

View on Landtracker Maps (logon required)

Extracted from MTO on 01-Jul-2025 00:55, last changed 01-Jul-2025.

Tenement Summary

Identifier:E 08/1878-IType:Exploration Licence
Status:DeadDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:29 BL
Purposes:Term:5 Years (Extended)
Markout:Received:11-Jun-2008 14:13
Commence:19-Apr-2013 Expiry:18-Apr-2023

Holders

Company NameSharesTotal Shares
FMG PILBARA PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
FMG PILBARA PTY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25011-Jun-2008 29.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.19-Apr-2013
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.19-Apr-2013
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.19-Apr-2013
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.19-Apr-2013
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.19-Apr-2013
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
19-Apr-2013
71No mining within 25 metres of either side of the Gas Pipeline.
19-Apr-2013
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP19-Apr-2013
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas pipeline.19-Apr-2013
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP19-Apr-2013
111No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer DMP.19-Apr-2013
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP .19-Apr-2013
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline.19-Apr-2013
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline.19-Apr-2013
1Consent to conduct exploration activities on Stock Route Reserve 9701 granted, subject to:
19-Apr-2013
151No exploration activities being carried out on Stock Route Reserve 9701 which restrict the use of the reserve.19-Apr-2013
161The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • "Programme of Work on E08/1878 for Fortescue" (Reg ID 40154) dated 19 August 2013 signed by Andrew Winzer and retained on Department of Mines and Petroleum File No. EARS-POW-40154

Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.


09-Oct-2013
171The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.09-Oct-2013
181All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses.09-Oct-2013

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.19-Apr-2013
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.19-Apr-2013
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.19-Apr-2013
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.19-Apr-2013
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.19-Apr-2013
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
19-Apr-2013
71No mining within 25 metres of either side of the Gas Pipeline.
19-Apr-2013
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP19-Apr-2013
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas pipeline.19-Apr-2013
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP19-Apr-2013
111No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer DMP.19-Apr-2013
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP .19-Apr-2013
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline.19-Apr-2013
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline.19-Apr-2013
1Consent to conduct exploration activities on Stock Route Reserve 9701 granted, subject to:
19-Apr-2013
151No exploration activities being carried out on Stock Route Reserve 9701 which restrict the use of the reserve.19-Apr-2013
161The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • "Programme of Work on E08/1878 for Fortescue" (Reg ID 40154) dated 19 August 2013 signed by Andrew Winzer and retained on Department of Mines and Petroleum File No. EARS-POW-40154

Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.


09-Oct-2013
171The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.09-Oct-2013
181All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses.09-Oct-2013

Dealings

TypeNumberDetails
Application to Amend395606Lodged:15:45 11 March 2013Amending:AddressFrom:FMG PILBARA PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:15:45 11 March 2013
Application to Amend420704Lodged:16:10 10 April 2013Amending:AddressFrom:Residential : FMG PILBARA PTY LTD, SAME AS CORRESPONDENCE and Correspondence :FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004To:Residential : FMG PILBARA PTY LTD, ADDRESS NOT PROVIDED and Correspondence :FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:16:10 10 April 2013
Application to Amend467238Lodged:13:34:28 11 May 2015Amending:AddressFrom:FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:FMG PILBARA PTY LTD, AQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379, HAY STREET, EAST PERTH, WA, 6004RECORDED:13:34:28 11 May 2015
Application to Amend481887Lodged:13:55:57 18 February 2016Amending:AddressFrom:FMG PILBARA PTY LTD, AQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379, HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:13:55:57 18 February 2016
Partial Surrender - Voluntary486813Lodged:16:05 16 May 2016Surrendered Blocks:HAMERSLEY RANGE 2042 s, t, u, x, y, z HAMERSLEY RANGE 2043 q, v, w HAMERSLEY RANGE 2114 c, d, e, h, j, k, n, o, p, s, t HAMERSLEY RANGE 2115 a, b, c, f, g, h, j, l, m, n, o, r, s, t, x, y, z HAMERSLEY RANGE 2187 d, eSurrendered Total:39 BL.REGISTERED:16:05 16 May 2016
Extension / Renewal of Term527744Lodged:10:35:16 12 April 2018Applied For Period:5 YearsRECORDED:10:35:16 12 April 2018GRANTED:19 June 2018Granted Period:5 YearsTerm Extended To:18/04/2023
Surrender - Outright555634Lodged:14:58:33 07 June 2019REGISTERED:14:58:33 07 June 2019

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202029-Apr-2019 10093889$8,700.0029 BL16-May-2016 $8,700.00$0.00
Rental201912-Apr-2018 8640987874$8,207.0029 BL16-May-2016 $8,207.00$0.00
Rental201819-Apr-2017 MT-210011030176-DD$5,842.0529 BL16-May-2016 $5,842.05$0.00
Rental201722-Apr-2016 MT-210010581329-DD$13,249.8068 BL19-Apr-2013 $13,249.80$0.00
Rental201629-Apr-2015 MT-210010252401-DD$8,302.8068 BL19-Apr-2013 $8,302.80$0.00
Rental201502-Apr-2014 MT-210010170268-DD$8,092.0068 BL19-Apr-2013 $8,092.00$0.00
Rental201411-Jun-2008 357KARRATHA$6,806.8068 BL19-Apr-2013 $6,806.80$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2020$9,667.00false
2019$58,000.0029-May-2019 $184,117.00$169,620.00$0.00$0.00$11,797.00$2,700.00$0.00false
2018$43,500.0008-Jun-2018 $44,095.00$31,718.00$0.00$0.00$9,433.00$2,944.00$0.00false
2017$48,375.0029-May-2017 $233,481.00$145,482.00$0.00$42,752.00$16,151.00$29,096.00$0.00false
2016$68,000.0001-Jun-2016 $68,132.00$31,544.00$0.00$6,746.00$16,242.00$13,600.00$0.00false
2015$68,000.0004-Jun-2015 $69,497.00$47,805.00$0.00$0.00$8,092.00$13,600.00$0.00false
2014$68,000.0022-May-2014 $57,619.0044720226-May-2014 $68,000.00Granted14-Apr-2015 $32,427.00$0.00$0.00$11,592.00$13,600.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
07-Jan-2009 Tenement ApplicationNT Cleared