Tenement: E08-1849

View on Landtracker Maps (logon required)

Extracted from MTO on 13-Jul-2025 00:31, last changed 11-Jul-2025.

Tenement Summary

Identifier:E 08/1849-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:25 BL
Purposes:Term:5 Years (Extended)
Markout:Received:22-Feb-2008 11:14
Commence:21-Nov-2008 Expiry:20-Nov-2026

Holders

Company NameSharesTotal Shares
MARDIE MINERALS PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
EPSILON ENERGY LTD100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Section 67Conversion 569546FinalisedM 08/526-BLive
Section 67Conversion 569545FinalisedM 08/525-BLive
Section 67Conversion 569547FinalisedM 08/527-BLive
Section 67Conversion 647554FinalisedG 08/102Live

Shires

Shire NameShire NumberStartArea
KARRATHA CITY431022-Feb-2008 23.98186 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.21-Nov-2008
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.21-Nov-2008
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.21-Nov-2008
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.21-Nov-2008
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.21-Nov-2008
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
21-Nov-2008
71No interference with Geodetic Survey Stations MARDIE WEST and MARDIE WEST EDH and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.21-Nov-2008
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Foreshore, Seabed and Navigable Waters.21-Nov-2008 22-Oct-2019
91No mining within 25 metres of either side of any Gas pipeline.21-Nov-2008
101No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP.21-Nov-2008
111No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas pipeline.21-Nov-2008
121The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP.21-Nov-2008
131No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer, DoCEP.21-Nov-2008
141Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP.21-Nov-2008
151The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline.21-Nov-2008
161Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline.21-Nov-2008
172The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 81661) “Trial Pond and Ancillary Works - Programme of Work on E08/1849 and E08/2836” dated 8 August 2019 signed by Neil Dixon, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-81661 as Doc ID 6753555
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
30-Oct-2019
171The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 82377) "Trial Pond Walls and Ancillary Works - Above High Water Mark (MHWS) Programme of Work on E08/1849-I and E08/2836-I for Mardie Minerals Pty Ltd" dated 17 September 2019 signed by Neil Dixon, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-82377 as Doc ID 6853474                                  
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
25-Sep-2019 29-Oct-2019
181Mimimum freeboard levels within the pond shall be maintained at all times.25-Sep-2019
191The pond embankment walls shall be checked on a routine daily basis by site personnel during periods of deposition to ensure that the facility is functioning as per the design intent.25-Sep-2019
2Consent to commence activities in respect to the purposes of the licence on the Foreshore, Seabed and Navigable Waters granted subject to:22-Oct-2019
1Ministerial Consent to Explore on the Foreshore, Seabed and  Navigable Waters provided subject to the following conditions:22-Oct-2019 22-Oct-2019
201Unless the prior written approval of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) is first obtained exploration operations within the licence area being restricted to the following activities:
  • reconnaissance by aircraft, helicopter, hovercraft, boat and amphibious vehicle;
  • bathymetric sounding and side scan sonar profiling, airborne radiometric and magnetic surveys, sea floor mapping, imagery and photography;
  • seismic survey (non-explosive) subject to whale, turtle watch and fishery protection procedures prescribed by the Department of Biodiversity Conservation and Attractions (DBCA) and the Department of Primary Industries and Regional Development.
22-Oct-2019
211Prior to any activity involving environmental disturbance to the seabed and general marine environment including:
  • vibro and shallow coring
  • drilling
  • sampling (grab, siphoning, etc.)
  • dredging
the licensee providing an exploration and environmental management program for written approval of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) in consultation with the Department of Biodiversity Conservation and Attractions (DBCA).
22-Oct-2019
221The licensee not establishing any camping facilities, access tracks, boat moorings, fuel depots or similar establishments on any coastal mangrove areas or beach/foreshore environments without the prior written approval of the Executive Director, Resource and Environmental Compliance, DMIRS in consultation with the Regional Manager, DBCA.22-Oct-2019
231No landing on any offshore islands without a quarantine program receiving the prior written approval of the Regional Manager, DBCA.22-Oct-2019
241No dumping of rubbish, discharge of fuel, oil or other pollutants into the marine environment.22-Oct-2019
251Damage to coral reefs, seagrass meadows and mangroves being avoided.22-Oct-2019
261Turtle and bird nesting areas not being disturbed.22-Oct-2019
271Only low toxicity drilling muds or additives being used in offshore drilling operations.22-Oct-2019
281Accidental spillages of fuel, oil or other pollutants of an amount greater than 80 litres being reported to the DEC within 12 hours of any such spillage occurring.22-Oct-2019
291No explosives being used in exploration without the prior written approval of the Executive Director, Resource and Environmental Compliance, DMIRS.22-Oct-2019
301At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the Executive Director, Resource and Environmental Compliance, DMIRS outlining the progress of the current and proposed exploration and environmental management program.22-Oct-2019
311Prior to the cessation of exploration activity the licensee notifying the Executive Director, Resource and Environmental Compliance, DMIRS and arranging an inspection as required.22-Oct-2019
321If in the opinion of the Executive Director, Resource and Environmental Compliance, DMIRS the exploration operations are causing any damage to or undue interference with living marine resources or their environment on any part or parts of the licence area, the licensee ceasing exploration on such part or parts within 24 hours of notification from the Executive Director, Resource and Environmental Compliance, DMIRS.22-Oct-2019
331The licensee carrying out exploration activities in such a manner as not to damage any pipeline, wellhead, capped well or other equipment associated with seabed exploration and mining.22-Oct-2019

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.21-Nov-2008
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.21-Nov-2008
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.21-Nov-2008
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.21-Nov-2008
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.21-Nov-2008
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
21-Nov-2008
71No interference with Geodetic Survey Stations MARDIE WEST and MARDIE WEST EDH and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.21-Nov-2008
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Foreshore, Seabed and Navigable Waters.21-Nov-2008 22-Oct-2019
91No mining within 25 metres of either side of any Gas pipeline.21-Nov-2008
101No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP.21-Nov-2008
111No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas pipeline.21-Nov-2008
121The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP.21-Nov-2008
131No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer, DoCEP.21-Nov-2008
141Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP.21-Nov-2008
151The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline.21-Nov-2008
161Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline.21-Nov-2008
172The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 81661) “Trial Pond and Ancillary Works - Programme of Work on E08/1849 and E08/2836” dated 8 August 2019 signed by Neil Dixon, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-81661 as Doc ID 6753555
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
30-Oct-2019
171The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 82377) "Trial Pond Walls and Ancillary Works - Above High Water Mark (MHWS) Programme of Work on E08/1849-I and E08/2836-I for Mardie Minerals Pty Ltd" dated 17 September 2019 signed by Neil Dixon, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-82377 as Doc ID 6853474                                  
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
25-Sep-2019 29-Oct-2019
181Mimimum freeboard levels within the pond shall be maintained at all times.25-Sep-2019
191The pond embankment walls shall be checked on a routine daily basis by site personnel during periods of deposition to ensure that the facility is functioning as per the design intent.25-Sep-2019
2Consent to commence activities in respect to the purposes of the licence on the Foreshore, Seabed and Navigable Waters granted subject to:22-Oct-2019
1Ministerial Consent to Explore on the Foreshore, Seabed and  Navigable Waters provided subject to the following conditions:22-Oct-2019 22-Oct-2019
201Unless the prior written approval of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) is first obtained exploration operations within the licence area being restricted to the following activities:
  • reconnaissance by aircraft, helicopter, hovercraft, boat and amphibious vehicle;
  • bathymetric sounding and side scan sonar profiling, airborne radiometric and magnetic surveys, sea floor mapping, imagery and photography;
  • seismic survey (non-explosive) subject to whale, turtle watch and fishery protection procedures prescribed by the Department of Biodiversity Conservation and Attractions (DBCA) and the Department of Primary Industries and Regional Development.
22-Oct-2019
211Prior to any activity involving environmental disturbance to the seabed and general marine environment including:
  • vibro and shallow coring
  • drilling
  • sampling (grab, siphoning, etc.)
  • dredging
the licensee providing an exploration and environmental management program for written approval of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) in consultation with the Department of Biodiversity Conservation and Attractions (DBCA).
22-Oct-2019
221The licensee not establishing any camping facilities, access tracks, boat moorings, fuel depots or similar establishments on any coastal mangrove areas or beach/foreshore environments without the prior written approval of the Executive Director, Resource and Environmental Compliance, DMIRS in consultation with the Regional Manager, DBCA.22-Oct-2019
231No landing on any offshore islands without a quarantine program receiving the prior written approval of the Regional Manager, DBCA.22-Oct-2019
241No dumping of rubbish, discharge of fuel, oil or other pollutants into the marine environment.22-Oct-2019
251Damage to coral reefs, seagrass meadows and mangroves being avoided.22-Oct-2019
261Turtle and bird nesting areas not being disturbed.22-Oct-2019
271Only low toxicity drilling muds or additives being used in offshore drilling operations.22-Oct-2019
281Accidental spillages of fuel, oil or other pollutants of an amount greater than 80 litres being reported to the DEC within 12 hours of any such spillage occurring.22-Oct-2019
291No explosives being used in exploration without the prior written approval of the Executive Director, Resource and Environmental Compliance, DMIRS.22-Oct-2019
301At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the Executive Director, Resource and Environmental Compliance, DMIRS outlining the progress of the current and proposed exploration and environmental management program.22-Oct-2019
311Prior to the cessation of exploration activity the licensee notifying the Executive Director, Resource and Environmental Compliance, DMIRS and arranging an inspection as required.22-Oct-2019
321If in the opinion of the Executive Director, Resource and Environmental Compliance, DMIRS the exploration operations are causing any damage to or undue interference with living marine resources or their environment on any part or parts of the licence area, the licensee ceasing exploration on such part or parts within 24 hours of notification from the Executive Director, Resource and Environmental Compliance, DMIRS.22-Oct-2019
331The licensee carrying out exploration activities in such a manner as not to damage any pipeline, wellhead, capped well or other equipment associated with seabed exploration and mining.22-Oct-2019

Dealings

TypeNumberDetails
Forfeiture338860Initiated:20/01/2010 for non-payment of rentNotice Issued:Regulation 50 Notice sent 20/01/2010 for non-payment of rent pursuant to Reg 109.Compliance Date:22/02/2010RECORDED:16:28:30 18 January 2010FINALISED:Order by Minister on 05 March 2010 that E 08/1849-I be Penalty Imposed
Fine342237Fine in respect to:Forfeiture Process 338860Fine reason:Non-compliance with rent obligationsPenalty amount:$345.00Notification date:09/03/2010Due date:08/04/2010Pursuant to:Section 96A(5)RECORDED:09 March 2010PAYMENT RECEIVED:22 March 2010Receipt Number:76911Amount:$345.00Remaining balance:$0.00FINALISED:22 March 2010
Application to Amend382021Lodged:09:45 27 September 2011Amending:NameFrom:EPSILON ENERGY LTDTo:AZIMUTH RESOURCES LIMITEDRECORDED:09:45 27 September 2011
Application to Amend417773Lodged:16:00 25 February 2013Amending:NameFrom:YANDI COOGINA PTY LTDTo:MARDIE MINERALS PTY LTDAmending:AddressFrom:YANDI COOGINA PTY LTD, C/- LEVEL 1, 1 ALTONA STRRET, WEST PERTH, WA, 6005To:MARDIE MINERALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849RECORDED:16:00 25 February 2013
Extension / Renewal of Term432197Lodged:11:25:02 01 October 2013Applied For Period:5 YearsRECORDED:11:25:02 01 October 2013GRANTED:11 December 2013Granted Period:5 YearsTerm Extended To:20/11/2018
Retention Status449988Lodged:12:15 30 June 2014RECORDED:12:15 30 June 2014REFUSED:15:24:23 28 January 2015
Partial Surrender - Compulsory463305Lodged:15:50 03 March 2015Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 959 e, j, k, o, t, x HAMERSLEY RANGE 960 a HAMERSLEY RANGE 1031 b, c, l, q, v HAMERSLEY RANGE 1101 o, p, r, s, t, w, x HAMERSLEY RANGE 1102 c, d, e, f, g, h, j, k, lSurrendered Total:28 BL.REGISTERED:Midnight 05 March 2015Surrendered area to be released 08:30:00 30/03/2015 under Section 65 (3)Surrendered area released 08:30:00 30/03/2015 under Section 65 (3)
Application to Amend490144Lodged:10:33:19 07 July 2016Amending:Address (Including DTC Details)From:MARDIE MINERALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:10:33:19 07 July 2016
Excess Tonnage536235Lodged:13:04:44 01 August 2018RECORDED:13:04:44 01 August 2018GRANTED:10:57:47 02 August 2018Additional 11,500 tonnes
Extension / Renewal of Term542291Lodged:08:30 08 November 2018Applied For Period:2 YearsRECORDED:08:30 08 November 2018GRANTED:08 January 2019Granted Period:2 YearsTerm Extended To:20/11/2020
Excess Tonnage558905Lodged:15:12:07 23 July 2019RECORDED:15:12:07 23 July 2019GRANTED:13:01:52 01 August 2019Approved for additional 110,000 tonnes.
Conversion569545New Tenement:M 08/525Application Date:14:20 20 Dec 2019Section:S67Converted 00:00 02 February 2022 being commencement of term of M 08/525Retained Blocks:HAMERSLEY RANGE 959 p, u, y, z HAMERSLEY RANGE 960 f, l, q, v HAMERSLEY RANGE 1031 d, e, g, h, j, k, m, n, o, p, r, s, t, u, w, x, y, z HAMERSLEY RANGE 1032 a, f, l, q, v HAMERSLEY RANGE 1103 a, b, c, d, e, h, j, k HAMERSLEY RANGE 1104 aRetained Total:40
Conversion569546New Tenement:M 08/526Application Date:14:20 20 Dec 2019Section:S67Converted 00:00 02 February 2022 being commencement of term of M 08/526Retained Blocks:HAMERSLEY RANGE 959 p, u, y, z HAMERSLEY RANGE 960 f HAMERSLEY RANGE 1031 d, e, g, h, j, k, m, n, o, r, s, w, x HAMERSLEY RANGE 1103 a, b, c, h, j, k HAMERSLEY RANGE 1104 aRetained Total:25
Conversion569547Section:S67Application Date:14:20 20 Dec 2019New Tenement:M 08/527Converted 00:00 02 February 2022 being commencement of term of M 08/527Retained Blocks:HAMERSLEY RANGE 959 p, u, y, z HAMERSLEY RANGE 960 f, l, q, v HAMERSLEY RANGE 1031 d, e, g, h, j, k, m, n, o, p, r, s, t, u, w, x, y, z HAMERSLEY RANGE 1032 a, f, l, q, v HAMERSLEY RANGE 1103 a, b, c, d, e, h, j, k HAMERSLEY RANGE 1104 aRetained Total:40
Extension / Renewal of Term585764Lodged:16:13:24 08 September 2020Applied For Period:2 YearsRECORDED:16:13:24 08 September 2020GRANTED:23 September 2020Granted Period:2 YearsTerm Extended To:20/11/2022
Application to Amend590253Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : MARDIE MINERALS PTY LTD, SAME AS CORRESPONDENCE and DTC :MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : MARDIE MINERALS PTY LTD, C/-HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977 and DTC :MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/-HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977RECORDED:14:30 11 November 2020
Excess Tonnage596186Lodged:13:11:18 18 February 2021RECORDED:13:11:18 18 February 2021WITHDRAWN:12:59 10 May 2021
Excess Tonnage619174Lodged:13:52:41 30 March 2021RECORDED:13:52:41 30 March 2021WITHDRAWN:12:59 10 May 2021
Excess Tonnage622084Lodged:12:57:30 10 May 2021RECORDED:12:57:30 10 May 2021WITHDRAWN:15:55 11 May 2021
Excess Tonnage622219Lodged:15:49:03 11 May 2021RECORDED:15:49:03 11 May 2021GRANTED:08:39 13 May 2021Additional 932,314 tonnes
Excess Tonnage627969Lodged:14:54:04 12 July 2021RECORDED:14:54:04 12 July 2021WITHDRAWN:09:18 19 August 2021
Excess Tonnage627971Lodged:14:54:04 12 July 2021RECORDED:14:54:04 12 July 2021WITHDRAWN:16:20 12 August 2021
Excess Tonnage628631Lodged:08:30 22 July 2021RECORDED:08:30 22 July 2021WITHDRAWN:16:20 12 August 2021
Application to Amend629594Lodged:08:30 04 August 2021Amending:Address (Including DTC Details)From:Principal Place of Business : MARDIE MINERALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977 and DTC :MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : MARDIE MINERALS PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :MARDIE MINERALS PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:08:30 04 August 2021
Excess Tonnage629838Lodged:09:02:34 09 August 2021RECORDED:09:02:34 09 August 2021GRANTED:15:34 25 August 2021Additional 11,200 tonnes
Excess Tonnage630713Lodged:15:44:47 18 August 2021RECORDED:15:44:47 18 August 2021WITHDRAWN:14:26 16 September 2021
Excess Tonnage632455Lodged:13:47:21 16 September 2021RECORDED:13:47:21 16 September 2021GRANTED:12:32 29 September 2021Additional 4,168 tonnes
Conversion647554New Tenement:G 08/102Application Date:16:06:43 08 Feb 2022Section:S67Converted 00:00 30 November 2022 being commencement of term of G 08/102Conversion in respect to the top 15 m of E08-1849-I only.
Partial Surrender - Voluntary658584Lodged:09:36:08 14 September 2022REJECTED:09:36:08 14 September 2022
Partial Surrender - Conditional658585Lodged:09:36:08 14 September 2022Surrendering portion of:E 08/1849-IIn favour of:[G 08/102]REJECTED:09:36:08 14 September 2022
Extension / Renewal of Term662405Lodged:13:22:16 02 November 2022Applied For Period:2 YearsRECORDED:13:22:16 02 November 2022GRANTED:09 February 2023Granted Period:2 YearsTerm Extended To:20/11/2024
Mortgage714708Lodged:16:14:08 13 September 2024Mortgaged Shares:100/100 shares MARDIE MINERALS PTY LTDMortgagee:WESTPAC ADMINISTRATION PTY LIMITEDREGISTERED:16:14:08 13 September 2024
Extension / Renewal of Term718282Lodged:15:46:31 29 October 2024Applied For Period:2 YearsRECORDED:15:46:31 29 October 2024GRANTED:15 January 2025Granted Period:2 YearsTerm Extended To:20/11/2026

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202515-Nov-2024 10704873$19,600.0025 BL02-Feb-2022 $19,600.00$0.00
Rental202415-Nov-2023 10447071$18,675.0025 BL02-Feb-2022 $18,675.00$0.00
Rental202314-Nov-2022 28564360974$17,775.0025 BL02-Feb-2022 $17,775.00$0.00
Rental202213-Sep-2023 (REFUND) FIL-41243$8,631.7542 BL05-Mar-2015 $19,802.25$0.00
Rental202211-Nov-2021 18484358327$28,434.00
Rental202107-Sep-2020 10162416$25,830.0042 BL05-Mar-2015 $25,830.00$0.00
Rental202031-Oct-2019 10120793$25,242.0042 BL05-Mar-2015 $25,242.00$0.00
Rental201931-Oct-2018 8189386363$23,814.0042 BL05-Mar-2015 $23,814.00$0.00
Rental201816-Nov-2017 8391453795$22,470.0042 BL05-Mar-2015 $22,470.00$0.00
Rental201716-Nov-2016 MT-210010823664-EF$21,739.2042 BL05-Mar-2015 $21,739.20$0.00
Rental201613-Nov-2015 MT-210010427295-EF$21,025.2042 BL05-Mar-2015 $21,025.20$0.00
Rental201527-Oct-2014 06-140172PERTH$18,035.5070 BL21-Nov-2008 $18,035.50$0.00
Rental201401-Oct-2013 06-128976PERTH$17,577.0070 BL21-Nov-2008 $17,577.00$0.00
Rental201325-Oct-2012 MT-210010072069-EF$12,701.5070 BL21-Nov-2008 $12,701.50$0.00
Rental201201-Nov-2011 101988PERTH$12,355.0070 BL21-Nov-2008 $12,355.00$0.00
Rental201109-Nov-2010 86485PERTH$8,477.7070 BL21-Nov-2008 $8,477.70$0.00
Rental201027-Jan-2010 74876PERTH$8,300.6070 BL21-Nov-2008 $8,300.60$0.00
Rental200913-Nov-2008 58513PERTH$700.7070 BL21-Nov-2008 $7,707.70$0.00
Rental200922-Feb-2008 3604KARRATHA$7,007.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2025$75,000.00false
2024$75,000.0008-Jan-2025 $611,940.00$489,944.00$0.00$0.00$20,006.00$101,990.00$0.00false
2023$75,000.0010-Jan-2024 $393,579.00$323,763.00$0.00$5,468.00$18,638.00$45,710.00$0.00false
2022$87,750.0021-Dec-2022 $222,653.00$165,569.00$0.00$0.00$22,803.00$34,281.00$0.00false
2021$126,000.0022-Dec-2021 $268,146.00$224,650.00$0.00$0.00$27,756.00$15,740.00$0.00false
2020$126,000.0010-Sep-2020 $2,697,025.22$2,108,102.74$0.00$132,680.23$34,621.70$421,620.55$0.00false
2019$126,000.0014-Jan-2020 $10,874,221.64$9,865,572.15$0.00$162,944.07$25,733.35$819,972.07$0.00false
2018$126,000.0017-Dec-2018 $2,947,092.88$2,664,926.66$0.00$62,249.23$24,394.25$195,522.74$0.00false
2017$126,000.0015-Dec-2017 $541,732.12$444,503.72$0.00$48,415.20$23,613.20$25,200.00$0.00false
2016$126,000.0009-Jan-2017 $127,878.40$79,805.36$0.00$0.00$22,873.04$25,200.00$0.00false
2015$102,667.0012-Jan-2016 $105,532.12$65,245.21$0.00$0.00$19,753.51$20,533.40$0.00false
2014$140,000.0012-Jan-2015 $184,953.63$134,183.30$0.00$0.00$22,770.33$28,000.00$0.00false
2013$105,000.0009-Dec-2013 $189,694.81$141,309.21$0.00$4,278.02$14,990.58$29,117.00$0.00false
2012$105,000.0024-Dec-2012 $209,994.00$127,296.00$0.00$33,040.00$14,659.00$34,999.00$0.00false
2011$70,000.0022-Dec-2011 $96,563.00$62,807.00$0.00$10,342.00$10,853.00$12,561.00$0.00false
2010$70,000.0023-Dec-2010 $81,228.00$56,491.00$0.00$0.00$10,737.00$14,000.00$0.00false
2009$70,000.0016-Dec-2009 $142,996.00$118,032.00$0.00$0.00$10,964.00$14,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
Tenement Application