1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 21-Nov-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 21-Nov-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 21-Nov-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 21-Nov-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 21-Nov-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 21-Nov-2008 | |
7 | 1 | No interference with Geodetic Survey Stations MARDIE WEST and MARDIE WEST EDH and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 21-Nov-2008 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Foreshore, Seabed and Navigable Waters. | 21-Nov-2008 | 22-Oct-2019 |
9 | 1 | No mining within 25 metres of either side of any Gas pipeline. | 21-Nov-2008 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 21-Nov-2008 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas pipeline. | 21-Nov-2008 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 21-Nov-2008 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer, DoCEP. | 21-Nov-2008 | |
14 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 21-Nov-2008 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 21-Nov-2008 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 21-Nov-2008 | |
17 | 2 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 81661) “Trial Pond and Ancillary Works - Programme of Work on E08/1849 and E08/2836” dated 8 August 2019 signed by Neil Dixon, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-81661 as Doc ID 6753555
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 30-Oct-2019 | |
17 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 82377) "Trial Pond Walls and Ancillary Works - Above High Water Mark (MHWS) Programme of Work on E08/1849-I and E08/2836-I for Mardie Minerals Pty Ltd" dated 17 September 2019 signed by Neil Dixon, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-82377 as Doc ID 6853474
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 25-Sep-2019 | 29-Oct-2019 |
18 | 1 | Mimimum freeboard levels within the pond shall be maintained at all times. | 25-Sep-2019 | |
19 | 1 | The pond embankment walls shall be checked on a routine daily basis by site personnel during periods of deposition to ensure that the facility is functioning as per the design intent. | 25-Sep-2019 | |
| 2 | Consent to commence activities in respect to the purposes of the licence on the Foreshore, Seabed and Navigable Waters granted subject to: | 22-Oct-2019 | |
| 1 | Ministerial Consent to Explore on the Foreshore, Seabed and Navigable Waters provided subject to the following conditions: | 22-Oct-2019 | 22-Oct-2019 |
20 | 1 | Unless the prior written approval of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) is first obtained exploration operations within the licence area being restricted to the following activities:
- reconnaissance by aircraft, helicopter, hovercraft, boat and amphibious vehicle;
- bathymetric sounding and side scan sonar profiling, airborne radiometric and magnetic surveys, sea floor mapping, imagery and photography;
- seismic survey (non-explosive) subject to whale, turtle watch and fishery protection procedures prescribed by the Department of Biodiversity Conservation and Attractions (DBCA) and the Department of Primary Industries and Regional Development.
| 22-Oct-2019 | |
21 | 1 | Prior to any activity involving environmental disturbance to the seabed and general marine environment including:
- vibro and shallow coring
- drilling
- sampling (grab, siphoning, etc.)
- dredging
the licensee providing an exploration and environmental management program for written approval of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) in consultation with the Department of Biodiversity Conservation and Attractions (DBCA). | 22-Oct-2019 | |
22 | 1 | The licensee not establishing any camping facilities, access tracks, boat moorings, fuel depots or similar establishments on any coastal mangrove areas or beach/foreshore environments without the prior written approval of the Executive Director, Resource and Environmental Compliance, DMIRS in consultation with the Regional Manager, DBCA. | 22-Oct-2019 | |
23 | 1 | No landing on any offshore islands without a quarantine program receiving the prior written approval of the Regional Manager, DBCA. | 22-Oct-2019 | |
24 | 1 | No dumping of rubbish, discharge of fuel, oil or other pollutants into the marine environment. | 22-Oct-2019 | |
25 | 1 | Damage to coral reefs, seagrass meadows and mangroves being avoided. | 22-Oct-2019 | |
26 | 1 | Turtle and bird nesting areas not being disturbed. | 22-Oct-2019 | |
27 | 1 | Only low toxicity drilling muds or additives being used in offshore drilling operations. | 22-Oct-2019 | |
28 | 1 | Accidental spillages of fuel, oil or other pollutants of an amount greater than 80 litres being reported to the DEC within 12 hours of any such spillage occurring. | 22-Oct-2019 | |
29 | 1 | No explosives being used in exploration without the prior written approval of the Executive Director, Resource and Environmental Compliance, DMIRS. | 22-Oct-2019 | |
30 | 1 | At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the Executive Director, Resource and Environmental Compliance, DMIRS outlining the progress of the current and proposed exploration and environmental management program. | 22-Oct-2019 | |
31 | 1 | Prior to the cessation of exploration activity the licensee notifying the Executive Director, Resource and Environmental Compliance, DMIRS and arranging an inspection as required. | 22-Oct-2019 | |
32 | 1 | If in the opinion of the Executive Director, Resource and Environmental Compliance, DMIRS the exploration operations are causing any damage to or undue interference with living marine resources or their environment on any part or parts of the licence area, the licensee ceasing exploration on such part or parts within 24 hours of notification from the Executive Director, Resource and Environmental Compliance, DMIRS. | 22-Oct-2019 | |
33 | 1 | The licensee carrying out exploration activities in such a manner as not to damage any pipeline, wellhead, capped well or other equipment associated with seabed exploration and mining. | 22-Oct-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 21-Nov-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 21-Nov-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 21-Nov-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 21-Nov-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 21-Nov-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 21-Nov-2008 | |
7 | 1 | No interference with Geodetic Survey Stations MARDIE WEST and MARDIE WEST EDH and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 21-Nov-2008 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Foreshore, Seabed and Navigable Waters. | 21-Nov-2008 | 22-Oct-2019 |
9 | 1 | No mining within 25 metres of either side of any Gas pipeline. | 21-Nov-2008 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 21-Nov-2008 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas pipeline. | 21-Nov-2008 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 21-Nov-2008 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer, DoCEP. | 21-Nov-2008 | |
14 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 21-Nov-2008 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 21-Nov-2008 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 21-Nov-2008 | |
17 | 2 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 81661) “Trial Pond and Ancillary Works - Programme of Work on E08/1849 and E08/2836” dated 8 August 2019 signed by Neil Dixon, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-81661 as Doc ID 6753555
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 30-Oct-2019 | |
17 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 82377) "Trial Pond Walls and Ancillary Works - Above High Water Mark (MHWS) Programme of Work on E08/1849-I and E08/2836-I for Mardie Minerals Pty Ltd" dated 17 September 2019 signed by Neil Dixon, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-82377 as Doc ID 6853474
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 25-Sep-2019 | 29-Oct-2019 |
18 | 1 | Mimimum freeboard levels within the pond shall be maintained at all times. | 25-Sep-2019 | |
19 | 1 | The pond embankment walls shall be checked on a routine daily basis by site personnel during periods of deposition to ensure that the facility is functioning as per the design intent. | 25-Sep-2019 | |
| 2 | Consent to commence activities in respect to the purposes of the licence on the Foreshore, Seabed and Navigable Waters granted subject to: | 22-Oct-2019 | |
| 1 | Ministerial Consent to Explore on the Foreshore, Seabed and Navigable Waters provided subject to the following conditions: | 22-Oct-2019 | 22-Oct-2019 |
20 | 1 | Unless the prior written approval of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) is first obtained exploration operations within the licence area being restricted to the following activities:
- reconnaissance by aircraft, helicopter, hovercraft, boat and amphibious vehicle;
- bathymetric sounding and side scan sonar profiling, airborne radiometric and magnetic surveys, sea floor mapping, imagery and photography;
- seismic survey (non-explosive) subject to whale, turtle watch and fishery protection procedures prescribed by the Department of Biodiversity Conservation and Attractions (DBCA) and the Department of Primary Industries and Regional Development.
| 22-Oct-2019 | |
21 | 1 | Prior to any activity involving environmental disturbance to the seabed and general marine environment including:
- vibro and shallow coring
- drilling
- sampling (grab, siphoning, etc.)
- dredging
the licensee providing an exploration and environmental management program for written approval of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety (DMIRS) in consultation with the Department of Biodiversity Conservation and Attractions (DBCA). | 22-Oct-2019 | |
22 | 1 | The licensee not establishing any camping facilities, access tracks, boat moorings, fuel depots or similar establishments on any coastal mangrove areas or beach/foreshore environments without the prior written approval of the Executive Director, Resource and Environmental Compliance, DMIRS in consultation with the Regional Manager, DBCA. | 22-Oct-2019 | |
23 | 1 | No landing on any offshore islands without a quarantine program receiving the prior written approval of the Regional Manager, DBCA. | 22-Oct-2019 | |
24 | 1 | No dumping of rubbish, discharge of fuel, oil or other pollutants into the marine environment. | 22-Oct-2019 | |
25 | 1 | Damage to coral reefs, seagrass meadows and mangroves being avoided. | 22-Oct-2019 | |
26 | 1 | Turtle and bird nesting areas not being disturbed. | 22-Oct-2019 | |
27 | 1 | Only low toxicity drilling muds or additives being used in offshore drilling operations. | 22-Oct-2019 | |
28 | 1 | Accidental spillages of fuel, oil or other pollutants of an amount greater than 80 litres being reported to the DEC within 12 hours of any such spillage occurring. | 22-Oct-2019 | |
29 | 1 | No explosives being used in exploration without the prior written approval of the Executive Director, Resource and Environmental Compliance, DMIRS. | 22-Oct-2019 | |
30 | 1 | At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the Executive Director, Resource and Environmental Compliance, DMIRS outlining the progress of the current and proposed exploration and environmental management program. | 22-Oct-2019 | |
31 | 1 | Prior to the cessation of exploration activity the licensee notifying the Executive Director, Resource and Environmental Compliance, DMIRS and arranging an inspection as required. | 22-Oct-2019 | |
32 | 1 | If in the opinion of the Executive Director, Resource and Environmental Compliance, DMIRS the exploration operations are causing any damage to or undue interference with living marine resources or their environment on any part or parts of the licence area, the licensee ceasing exploration on such part or parts within 24 hours of notification from the Executive Director, Resource and Environmental Compliance, DMIRS. | 22-Oct-2019 | |
33 | 1 | The licensee carrying out exploration activities in such a manner as not to damage any pipeline, wellhead, capped well or other equipment associated with seabed exploration and mining. | 22-Oct-2019 | |
Type | Number | Details |
Forfeiture | 338860 | Initiated:20/01/2010 for non-payment of rentNotice Issued:Regulation 50 Notice sent 20/01/2010 for non-payment of rent pursuant to Reg 109.Compliance Date:22/02/2010RECORDED:16:28:30 18 January 2010FINALISED:Order by Minister on 05 March 2010 that E 08/1849-I be Penalty Imposed |
Fine | 342237 | Fine in respect to:Forfeiture Process 338860Fine reason:Non-compliance with rent obligationsPenalty amount:$345.00Notification date:09/03/2010Due date:08/04/2010Pursuant to:Section 96A(5)RECORDED:09 March 2010PAYMENT RECEIVED:22 March 2010Receipt Number:76911Amount:$345.00Remaining balance:$0.00FINALISED:22 March 2010 |
Application to Amend | 382021 | Lodged:09:45 27 September 2011Amending:NameFrom:EPSILON ENERGY LTDTo:AZIMUTH RESOURCES LIMITEDRECORDED:09:45 27 September 2011 |
Application to Amend | 417773 | Lodged:16:00 25 February 2013Amending:NameFrom:YANDI COOGINA PTY LTDTo:MARDIE MINERALS PTY LTDAmending:AddressFrom:YANDI COOGINA PTY LTD, C/- LEVEL 1, 1 ALTONA STRRET, WEST PERTH, WA, 6005To:MARDIE MINERALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849RECORDED:16:00 25 February 2013 |
Extension / Renewal of Term | 432197 | Lodged:11:25:02 01 October 2013Applied For Period:5 YearsRECORDED:11:25:02 01 October 2013GRANTED:11 December 2013Granted Period:5 YearsTerm Extended To:20/11/2018 |
Retention Status | 449988 | Lodged:12:15 30 June 2014RECORDED:12:15 30 June 2014REFUSED:15:24:23 28 January 2015 |
Partial Surrender - Compulsory | 463305 | Lodged:15:50 03 March 2015Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 959 e, j, k, o, t, x
HAMERSLEY RANGE 960 a
HAMERSLEY RANGE 1031 b, c, l, q, v
HAMERSLEY RANGE 1101 o, p, r, s, t, w, x
HAMERSLEY RANGE 1102 c, d, e, f, g, h, j, k, lSurrendered Total:28 BL.REGISTERED:Midnight 05 March 2015Surrendered area to be released 08:30:00 30/03/2015 under Section 65 (3)Surrendered area released 08:30:00 30/03/2015 under Section 65 (3) |
Application to Amend | 490144 | Lodged:10:33:19 07 July 2016Amending:Address (Including DTC Details)From:MARDIE MINERALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:10:33:19 07 July 2016 |
Excess Tonnage | 536235 | Lodged:13:04:44 01 August 2018RECORDED:13:04:44 01 August 2018GRANTED:10:57:47 02 August 2018Additional 11,500 tonnes |
Extension / Renewal of Term | 542291 | Lodged:08:30 08 November 2018Applied For Period:2 YearsRECORDED:08:30 08 November 2018GRANTED:08 January 2019Granted Period:2 YearsTerm Extended To:20/11/2020 |
Excess Tonnage | 558905 | Lodged:15:12:07 23 July 2019RECORDED:15:12:07 23 July 2019GRANTED:13:01:52 01 August 2019Approved for additional 110,000 tonnes. |
Conversion | 569545 | New Tenement:M 08/525Application Date:14:20 20 Dec 2019Section:S67Converted 00:00 02 February 2022 being commencement of term of M 08/525Retained Blocks:HAMERSLEY RANGE 959 p, u, y, z
HAMERSLEY RANGE 960 f, l, q, v
HAMERSLEY RANGE 1031 d, e, g, h, j, k, m, n, o, p, r, s, t, u, w, x, y, z
HAMERSLEY RANGE 1032 a, f, l, q, v
HAMERSLEY RANGE 1103 a, b, c, d, e, h, j, k
HAMERSLEY RANGE 1104 aRetained Total:40 |
Conversion | 569546 | New Tenement:M 08/526Application Date:14:20 20 Dec 2019Section:S67Converted 00:00 02 February 2022 being commencement of term of M 08/526Retained Blocks:HAMERSLEY RANGE 959 p, u, y, z
HAMERSLEY RANGE 960 f
HAMERSLEY RANGE 1031 d, e, g, h, j, k, m, n, o, r, s, w, x
HAMERSLEY RANGE 1103 a, b, c, h, j, k
HAMERSLEY RANGE 1104 aRetained Total:25 |
Conversion | 569547 | Section:S67Application Date:14:20 20 Dec 2019New Tenement:M 08/527Converted 00:00 02 February 2022 being commencement of term of M 08/527Retained Blocks:HAMERSLEY RANGE 959 p, u, y, z
HAMERSLEY RANGE 960 f, l, q, v
HAMERSLEY RANGE 1031 d, e, g, h, j, k, m, n, o, p, r, s, t, u, w, x, y, z
HAMERSLEY RANGE 1032 a, f, l, q, v
HAMERSLEY RANGE 1103 a, b, c, d, e, h, j, k
HAMERSLEY RANGE 1104 aRetained Total:40 |
Extension / Renewal of Term | 585764 | Lodged:16:13:24 08 September 2020Applied For Period:2 YearsRECORDED:16:13:24 08 September 2020GRANTED:23 September 2020Granted Period:2 YearsTerm Extended To:20/11/2022 |
Application to Amend | 590253 | Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : MARDIE MINERALS PTY LTD, SAME AS CORRESPONDENCE and DTC :MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : MARDIE MINERALS PTY LTD, C/-HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977 and DTC :MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/-HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977RECORDED:14:30 11 November 2020 |
Excess Tonnage | 596186 | Lodged:13:11:18 18 February 2021RECORDED:13:11:18 18 February 2021WITHDRAWN:12:59 10 May 2021 |
Excess Tonnage | 619174 | Lodged:13:52:41 30 March 2021RECORDED:13:52:41 30 March 2021WITHDRAWN:12:59 10 May 2021 |
Excess Tonnage | 622084 | Lodged:12:57:30 10 May 2021RECORDED:12:57:30 10 May 2021WITHDRAWN:15:55 11 May 2021 |
Excess Tonnage | 622219 | Lodged:15:49:03 11 May 2021RECORDED:15:49:03 11 May 2021GRANTED:08:39 13 May 2021Additional 932,314 tonnes |
Excess Tonnage | 627969 | Lodged:14:54:04 12 July 2021RECORDED:14:54:04 12 July 2021WITHDRAWN:09:18 19 August 2021 |
Excess Tonnage | 627971 | Lodged:14:54:04 12 July 2021RECORDED:14:54:04 12 July 2021WITHDRAWN:16:20 12 August 2021 |
Excess Tonnage | 628631 | Lodged:08:30 22 July 2021RECORDED:08:30 22 July 2021WITHDRAWN:16:20 12 August 2021 |
Application to Amend | 629594 | Lodged:08:30 04 August 2021Amending:Address (Including DTC Details)From:Principal Place of Business : MARDIE MINERALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977 and DTC :MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : MARDIE MINERALS PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :MARDIE MINERALS PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:08:30 04 August 2021 |
Excess Tonnage | 629838 | Lodged:09:02:34 09 August 2021RECORDED:09:02:34 09 August 2021GRANTED:15:34 25 August 2021Additional 11,200 tonnes |
Excess Tonnage | 630713 | Lodged:15:44:47 18 August 2021RECORDED:15:44:47 18 August 2021WITHDRAWN:14:26 16 September 2021 |
Excess Tonnage | 632455 | Lodged:13:47:21 16 September 2021RECORDED:13:47:21 16 September 2021GRANTED:12:32 29 September 2021Additional 4,168 tonnes |
Conversion | 647554 | New Tenement:G 08/102Application Date:16:06:43 08 Feb 2022Section:S67Converted 00:00 30 November 2022 being commencement of term of G 08/102Conversion in respect to the top 15 m of E08-1849-I only. |
Partial Surrender - Voluntary | 658584 | Lodged:09:36:08 14 September 2022REJECTED:09:36:08 14 September 2022 |
Partial Surrender - Conditional | 658585 | Lodged:09:36:08 14 September 2022Surrendering portion of:E 08/1849-IIn favour of:[G 08/102]REJECTED:09:36:08 14 September 2022 |
Extension / Renewal of Term | 662405 | Lodged:13:22:16 02 November 2022Applied For Period:2 YearsRECORDED:13:22:16 02 November 2022GRANTED:09 February 2023Granted Period:2 YearsTerm Extended To:20/11/2024 |
Mortgage | 714708 | Lodged:16:14:08 13 September 2024Mortgaged Shares:100/100 shares MARDIE MINERALS PTY LTDMortgagee:WESTPAC ADMINISTRATION PTY LIMITEDREGISTERED:16:14:08 13 September 2024 |
Extension / Renewal of Term | 718282 | Lodged:15:46:31 29 October 2024Applied For Period:2 YearsRECORDED:15:46:31 29 October 2024GRANTED:15 January 2025Granted Period:2 YearsTerm Extended To:20/11/2026 |