1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Jan-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 18-Jan-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Jan-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Jan-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Jan-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Jan-2008 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 08/29, 08/32 and 08/33 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 18-Jan-2008 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Jan-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 18-Jan-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Jan-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Jan-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Jan-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Jan-2008 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 08/29, 08/32 and 08/33 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 18-Jan-2008 | |
Type | Number | Details |
Miscellaneous Entry | | Nippon Steel Australia Pty Limited (6/200th shares)
Sumitomo Metal Australia Pty Ltd (2/200th shares)
Mitsui Iron Ore Development Pty Ltd (2/200th shares)
as joint tenants carrying on business in partnership under the registered business name "Cape Lambert Iron Associates"
Nippon Steel Australia Pty Limited (15/200th shares)
Sumitomo Metal Australia Pty Ltd (5/200th shares)
as joint tenants carrying on business in partnership under the registered business name "Pannawonica Iron Associates" |
Extension / Renewal of Term | 413812 | Lodged:12:55 20 December 2012Applied For Period:5 YearsRECORDED:12:55 20 December 2012GRANTED:15 March 2013Granted Period:5 YearsTerm Extended To:17/01/2018 |
Deferral of Drop Off | 414021 | Lodged:15:00 21 December 2012RECORDED:15:00 21 December 2012GRANTED:15 March 2013Section 65(3) Compulsory Surrender for 40% of the licence is due to be lodged prior to 17 January 2014. |
Conversion | 432182 | New Tenement:G 08/82Application Date:12:35 05 Jul 2013Section:S67Discontinued Midnight 17 January 2014 due to registration of Compulsory Partial Surrender 437748 in respect to E08/1772 |
Partial Surrender - Compulsory | 437748 | Lodged:08:40 24 December 2013Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 1463 d, e, k, p, u
HAMERSLEY RANGE 1464 l, q
HAMERSLEY RANGE 1536 mSurrendered Total:8 BL.REGISTERED:Midnight 17 January 2014Surrendered area to be released 08:30:00 10/02/2014 under Section 65 (3)Surrendered area released 08:30:00 10/02/2014 under Section 65 (3) |
Application to Amend | 444687 | Lodged:15:10 17 April 2014Amending:AddressFrom:ROBE RIVER MINING CO. PTY LTD, C/- RIO TINTO IRON ORE, LAND ASSETS DEPARTMENT GPO BOX A42, PERTH, WA, 6837To:ROBE RIVER MINING CO. PTY LTD, C/- RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 6837RECORDED:15:10 17 April 2014 |
Amalgamation | 470897 | Lodged:16:00 08 July 2015Amalgamating:Whole of former P 08/530-ISituated within:External boundaries of E 08/1772-IGranted 23/02/2016 in respect to P 08/530-I |
Extension / Renewal of Term | 519875 | Lodged:12:19:33 11 December 2017Applied For Period:2 YearsRECORDED:12:19:33 11 December 2017GRANTED:28 February 2018Granted Period:2 YearsTerm Extended To:17/01/2020 |
Application to Amend | 550459 | Lodged:14:52 28 March 2019From:ROBE RIVER MINING CO. PTY LIMITEDAmending:NameTo:ROBE RIVER MINING CO. PTY. LTD.From:CAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)To:CAPE LAMBERT IRON ASSOCIATESFrom:PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)To:PANNAWONICA IRON ASSOCIATESAmending:Address (Including DTC Details)From:Principal Place of Business : MITSUI IRON ORE DEVELOPMENT PTY LTD, SAME AS CORRESPONDENCE and DTC :MITSUI IRON ORE DEVELOPMENT PTY LTD, C/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 6001To:Principal Place of Business : MITSUI IRON ORE DEVELOPMENT PTY LTD, LEVEL 26 EXCHANGE TOWER, THE ESPLANADE, PERTH, WA, 6000 and DTC :MITSUI IRON ORE DEVELOPMENT PTY LTD, C/- RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 6837, xxxxxxxxxxxxxxxxxxxxxxxxxxxxx@riotinto.comFrom:Principal Place of Business : NORTH MINING LIMITED, SAME AS CORRESPONDENCE and DTC :NORTH MINING LIMITED, C/- RIO TINTO IRON ORE, LAND ASSETS DEPARTMENT GPO BOX A42, PERTH, WA, 6837To:Principal Place of Business : NORTH MINING LIMITED, LEVEL 18 CENTRAL PARK, 152-158 ST GEORGES TCE, PERTH, WA, 6000 and DTC :NORTH MINING LIMITED, C/- RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 6837, xxxxxxxxxxxxxxxxxxxxxxxxxxxxx@riotinto.comFrom:Principal Place of Business : ROBE RIVER MINING CO. PTY LIMITED, SAME AS CORRESPONDENCE and DTC :ROBE RIVER MINING CO. PTY LIMITED, C/- RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 6837To:Principal Place of Business : ROBE RIVER MINING CO. PTY. LTD., LEVEL 18 CENTRAL PARK, 152-158 ST GEORGES TCE, PERTH, WA, 6000 and DTC :ROBE RIVER MINING CO. PTY. LTD., C/- RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 6837, xxxxxxxxxxxxxxxxxxxxxxxxxxxxx@riotinto.comFrom:Principal Place of Business : CAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME), SAME AS CORRESPONDENCE and DTC :CAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME), C/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 6001To:Principal Place of Business : CAPE LAMBERT IRON ASSOCIATES, LEVEL 26 EXCHANGE TOWER, THE ESPLANADE, PERTH, WA, 6000 and DTC :CAPE LAMBERT IRON ASSOCIATES, C/- RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 6837, xxxxxxxxxxxxxxxxxxxxxxxxxxxxx@riotinto.comFrom:Principal Place of Business : PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME), SAME AS CORRESPONDENCE and DTC :PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME), C/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 6001To:Principal Place of Business : PANNAWONICA IRON ASSOCIATES, LEVEL 26 EXCHANGE TOWER, THE ESPLANADE, PERTH, WA, 6000 and DTC :PANNAWONICA IRON ASSOCIATES, C/- RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 6837, xxxxxxxxxxxxxxxxxxxxxxxxxxxxx@riotinto.comRECORDED:14:52 28 March 2019 |
Extension / Renewal of Term | 568573 | Lodged:15:00:34 11 December 2019Applied For Period:2 YearsRECORDED:15:00:34 11 December 2019GRANTED:17 March 2020Granted Period:2 YearsTerm Extended To:17/01/2022 |
Extension / Renewal of Term | 638227 | Lodged:08:30 23 December 2021Applied For Period:2 YearsRECORDED:08:30 23 December 2021GRANTED:17 March 2022Granted Period:2 YearsTerm Extended To:17/01/2024 |
Extension / Renewal of Term | 692467 | Lodged:10:12:06 18 December 2023Applied For Period:2 YearsRECORDED:10:12:06 18 December 2023GRANTED:14 March 2024Granted Period:2 YearsTerm Extended To:17/01/2026 |