Extracted from MTO on 07-Jul-2025 01:51,
last changed 03-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 08-Oct-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 08-Oct-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Oct-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Oct-2007 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Oct-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Oct-2007 | |
7 | 1 | No interference with Geodetic Survey Station SSM - WYLOO - 62, 65T, 65, 66T, 66, 67, 68T, 68, 70 and 21 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 08-Oct-2007 | |
8 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within FNA 3912 (Wyloo) as shown in TENGRAPH. | 08-Oct-2007 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 08-Oct-2007 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 08-Oct-2007 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 08-Oct-2007 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer, DoCEP. | 08-Oct-2007 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 08-Oct-2007 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 08-Oct-2007 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 08-Oct-2007 | |
16 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Giralia Resources NL on E08/1712" (Reg. ID 19742) dated 4 July 2008 signed by Julian Goldsworthy, and retained on Department of Industry and Resources file No. T5159/200601.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 17-Nov-2008 | |
17 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 17-Nov-2008 | |
18 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 17-Nov-2008 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 08-Oct-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 08-Oct-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Oct-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Oct-2007 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Oct-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Oct-2007 | |
7 | 1 | No interference with Geodetic Survey Station SSM - WYLOO - 62, 65T, 65, 66T, 66, 67, 68T, 68, 70 and 21 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 08-Oct-2007 | |
8 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within FNA 3912 (Wyloo) as shown in TENGRAPH. | 08-Oct-2007 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 08-Oct-2007 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 08-Oct-2007 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 08-Oct-2007 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer, DoCEP. | 08-Oct-2007 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 08-Oct-2007 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 08-Oct-2007 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 08-Oct-2007 | |
16 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Giralia Resources NL on E08/1712" (Reg. ID 19742) dated 4 July 2008 signed by Julian Goldsworthy, and retained on Department of Industry and Resources file No. T5159/200601.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 17-Nov-2008 | |
17 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 17-Nov-2008 | |
18 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 17-Nov-2008 | |
Type | Number | Details |
Caveat | 1063H/012 | Pursuant to Section 120AA, Caveat 1063H/012 by SIPA EXPLORATION NL in respect to 100/100ths shares in the name of GIRALIA RESOURCES NL lodged against E 08/1095 is now effective against this tenement.RECORDED 08 Oct 2007 |
Bond | 297064 | Lodged 11:00:00 AM on 11 Aug 2008 For $11,000.00RECORDED 11:00 AM 11 Aug 2008Lodged:11:00 11 August 2008Bond Type:Unconditional Performance BondBond Amount:$11,000.00RECORDED:11 August 2008RETIRED:14 June 2012 |
Bond Requirement | 307554 | Requirement Date:17/11/2008Amount:$11,000.00RECORDED:15:03:44 17 November 2008FINALISED:11:02:24 10 November 2014 |
Extension of Time | 336063 | Lodged:16:46 03 December 2009Type:Form 5RECORDED:16:46 03 December 2009Extension of time until 14 December 2009 to lodge Form 5 for the year ending 7 October 2009 approvedAPPROVED:10:48:37 07 December 2009 |
Application to Amend | 369519 | Lodged:15:46 31 March 2011Amending:AddressFrom:GIRALIA RESOURCES NL, PO BOX 1665, WEST PERTH, WA, 6872To:GIRALIA RESOURCES NL, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638, PERTH BUSINESS CENTRE, WA, 6849RECORDED:15:46 31 March 2011 |
Amalgamation | 379472 | Lodged:15:15 17 August 2011Amalgamating:Whole of former P 08/552Situated within:External boundaries of E 08/1712-IThe whole of late prospecting licence 08/552 to be amalgamated into the whole of Live primary tenement E08/1712.Granted 18/01/2013 in respect to P 08/552 |
Application to Amend | 380267 | Lodged:11:31 20 September 2011Amending:AddressFrom:GIRALIA RESOURCES NL, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638, PERTH BUSINESS CENTRE, WA, 6849To:GIRALIA RESOURCES NL, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931RECORDED:11:31 20 September 2011 |
Application to Amend | 385302 | Lodged:10:30 16 November 2011From:GIRALIA RESOURCES NLAmending:NameTo:GIRALIA RESOURCES PTY LTDRECORDED:10:30 16 November 2011 |
Application to Amend | 387487 | Lodged:15:55 15 December 2011REJECTED:15:55 15 December 2011 |
Bond | 399450 | Lodged:16:10 12 June 2012Bond Type:Unconditional Performance BondBond Amount:$11,000.00RECORDED:12 June 2012RETIRED - MRF:10 November 2014 |
Extension / Renewal of Term | 407433 | Lodged:15:50 04 October 2012Applied For Period:5 YearsRECORDED:15:50 04 October 2012GRANTED:26 October 2012Granted Period:5 YearsTerm Extended To:07/10/2017 |
Deferral of Drop Off | 407435 | Lodged:15:50 04 October 2012RECORDED:15:50 04 October 2012GRANTED:26 October 2012Section 65(3) Compulsory Surrender for 40% of the licence is due to be lodged prior to 07 October 2013. |
Retention Status | 432703 | Lodged:15:05 07 October 2013RECORDED:15:05 07 October 2013APPROVED:11:34:46 24 May 2015Pursuant to Section 69B(3) approval takes effect on the day on which the approval is published in the Gazette. Notice of approval published in the Gazette 16 Jun 2015.
Total blocks approved : 15 |
Conversion | 432431 | New Tenement:M 08/504Application Date:15:55 23 Aug 2013Section:S67 |
Forfeiture | 446941 | Initiated:16/05/2014 for non-compliance with expenditure conditionsRECORDED:08:30 26 November 2013Notice Issued:Regulation 50 Notice sent 16/05/2014 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:16/06/2014FINALISED:Order by Minister on 11 July 2014 that E 08/1712-I be Penalty Imposed |
Fine | 450876 | Fine in respect to:Forfeiture Process 446941Fine reason:Non-compliance with expenditure obligationsPenalty amount:$2,409.00Notification date:17/07/2014Due date:21/08/2014Pursuant to:Section 96A(5)RECORDED:17 July 2014PAYMENT RECEIVED:31 July 2014Receipt Number:06-137602Amount:$2,409.00Remaining balance:$0.00FINALISED:31 July 2014 |
Expiry - Partial | 470557 | Retained Blocks:HAMERSLEY RANGE 2408 z
HAMERSLEY RANGE 2409 v, w, x, y, z
HAMERSLEY RANGE 2410 v
HAMERSLEY RANGE 2481 a, b, c, d, e
HAMERSLEY RANGE 2482 a, b, gRetained Total:15 BL.EFFECTIVE:15:15 26 June 2015Upon withdrawal of Sec 67 Application for M 08/504. |
Extension / Renewal of Term | 515665 | Lodged:14:50 04 October 2017Applied For Period:2 YearsRECORDED:14:50 04 October 2017GRANTED:02 January 2018Granted Period:2 YearsTerm Extended To:07/10/2019 |
Application to Amend | 552612 | Lodged:10:15:30 01 May 2019Amending:Address (Including DTC Details)From:Principal Place of Business : GIRALIA RESOURCES PTY LTD, SAME AS CORRESPONDENCE and DTC :GIRALIA RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Principal Place of Business : GIRALIA RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxx997 and DTC :GIRALIA RESOURCES PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxx997RECORDED:10:15:30 01 May 2019 |
Extension / Renewal of Term | 564097 | Lodged:15:05 03 October 2019Applied For Period:2 YearsRECORDED:15:05 03 October 2019GRANTED:30 October 2019Granted Period:2 YearsTerm Extended To:07/10/2021 |
Caveat | 591351 | Lodged:08:30 27 November 2020Caveat Type:Absolute CaveatCaveator:VOX ROYALTY AUSTRALIA PTY LTDShares Caveated:100/100 shares GIRALIA RESOURCES PTY LTDRECORDED:08:30 27 November 2020 |
Extension / Renewal of Term | 633675 | Lodged:08:53:06 07 October 2021Applied For Period:2 YearsRECORDED:08:53:06 07 October 2021GRANTED:08 December 2021Granted Period:2 YearsTerm Extended To:07/10/2023 |
Extension / Renewal of Term | 687315 | Lodged:14:03:49 05 October 2023Applied For Period:2 YearsRECORDED:14:03:49 05 October 2023GRANTED:21 December 2023Granted Period:2 YearsTerm Extended To:07/10/2025 |
Caveat | 697090 | Lodged:14:51:57 21 February 2024Caveat Type:Consent CaveatCaveator:ALCREST ROYALTIES AUSTRALIA PTY LTDShares Caveated:100/100 shares GIRALIA RESOURCES PTY LTDREJECTED:14:51:57 21 February 2024 |
Application to Amend | 701024 | Lodged:14:57:18 11 April 2024Amending:Address (Including DTC Details)From:Principal Place of Business : GIRALIA RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxx997 and DTC :GIRALIA RESOURCES PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxx997To:Principal Place of Business : GIRALIA RESOURCES PTY LTD, C/- HANROY IRON ORE PROJECTS PTY LTD, PO LOCKED BAG NO. 2, WEST PERTH, WA, 6872, xxxxxx@hanroy.com.au, xxxxxxxxx222 and DTC :GIRALIA RESOURCES PTY LTD, TENURE & LAND ACCESS, C/- HANROY IRON ORE PROJECTS PTY LTD, PO LOCKED BAG NO. 2, WEST PERTH, WA, 6872, xxxxxx@hanroy.com.au, xxxxxxxxx222RECORDED:14:57:18 11 April 2024 |
Application to Amend | 701025 | Lodged:14:57:18 11 April 2024Amending:Address (Including DTC Details)From:Principal Place of Business : GIRALIA RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxx997 and DTC :GIRALIA RESOURCES PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxx997To:Principal Place of Business : GIRALIA RESOURCES PTY LTD, HANROY IRON ORE PROJECTS PTY LTD, HPPL HOUSE, 28 – 42 VENTNOR AVENUE, WEST PERTH, WA, 6005, xxxxxx@hanroy.com.au, xxxxxxxxx222 and DTC :GIRALIA RESOURCES PTY LTD, HANROY IRON ORE PROJECTS PTY LTD, HPPL HOUSE, 28 – 42 VENTNOR AVENUE, WEST PERTH, WA, 6005, xxxxxx@hanroy.com.au, xxxxxxxxx222REJECTED:14:57:18 11 April 2024 |
Caveat | 718644 | Lodged:16:06:56 01 November 2024Caveat Type:Absolute CaveatCaveator:ALCREST ROYALTIES AUSTRALIA PTY LTDShares Caveated:100/100 shares GIRALIA RESOURCES PTY LTDRECORDED:16:06:56 01 November 2024 |