Extracted from MTO on 04-Jul-2025 00:38,
last changed 04-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 06-Jul-2009 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 06-Jul-2009 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-Jul-2009 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-Jul-2009 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-Jul-2009 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-Jul-2009 | |
7 | 1 | No interference with the optic fibre cable or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 06-Jul-2009 | |
8 | 1 | No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 06-Jul-2009 | |
9 | 1 | No interference with Geodetic Survey Station YLA 35, YLA 203 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 06-Jul-2009 | |
10 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 06-Jul-2009 | |
11 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E08/1684-I, E08/1685-I for Bann Geological Services Pty Ltd (Reg ID 26096) dated 15 February 2010 signed by George Merhi and retained on Department of Mines and Petroleum File No. T3764/200801
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 13-May-2010 | |
12 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 13-May-2010 | |
13 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 13-May-2010 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 06-Jul-2009 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 06-Jul-2009 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-Jul-2009 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-Jul-2009 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-Jul-2009 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-Jul-2009 | |
7 | 1 | No interference with the optic fibre cable or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 06-Jul-2009 | |
8 | 1 | No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 06-Jul-2009 | |
9 | 1 | No interference with Geodetic Survey Station YLA 35, YLA 203 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 06-Jul-2009 | |
10 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 06-Jul-2009 | |
11 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E08/1684-I, E08/1685-I for Bann Geological Services Pty Ltd (Reg ID 26096) dated 15 February 2010 signed by George Merhi and retained on Department of Mines and Petroleum File No. T3764/200801
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 13-May-2010 | |
12 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 13-May-2010 | |
13 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 13-May-2010 | |
Type | Number | Details |
Application to Amend | KR64/056 | Lodged 11:31:00 AM on 26 Jun 2006 To include on Form 21 "In respect of Ashburton Location 51 and General Lease I127605 this application is restricted to sub surface rights (below a depth of 30 metres) under section 33(1a) of the Mining Act 1978 (as amended)"RECORDED 11:31 AM 26 Jun 2006 |
Licence Instrument | 547649 | Lodged:00:00 06 July 2009ISSUED:00:00 06 July 2009 |
Bond | 346297 | Lodged:11:30 07 May 2010Bond Type:Unconditional Performance BondBond Amount:$16,000.00RECORDED:07 May 2010RETIRED - MRF:17 June 2014 |
Bond Requirement | 346705 | Requirement Date:13/05/2010Amount:$16,000.00RECORDED:10:24:36 13 May 2010FINALISED:10:54:42 17 June 2014 |
Application to Amend | 367539 | Lodged:16:15 11 March 2011Amending:AddressFrom:ZANTHUS RESOURCES PTY LTD, C/- STATEWIDE TENEMENT & ADVISORY SERVICES PTY LTD, PO BOX 8095 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:ZANTHUS RESOURCES PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008RECORDED:16:15 11 March 2011 |
Application for Forfeiture | KR10/112 | Lodged:13:07 07 October 2011Respondent:ZANTHUS RESOURCES PTY LTDApplicant:MINERALOGY PTY LTDRECORDED:13:07 07 October 2011Application for forfeiture 382855 is withdrawn by leave. No order as to costs.Warden's Determination:Withdrawn 03/02/2012 10:00:00WITHDRAWN:10:00 03 February 2012 |
Objection | 383395 | Lodged:16:00 17 October 2011Objection Type:Exemption From ExpenditureREJECTED:16:00 17 October 2011 |
Application to Amend | 413490 | Lodged:14:00 18 December 2012Amending:AddressFrom:ZANTHUS RESOURCES PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:ZANTHUS RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:14:00 18 December 2012 |
Extension / Renewal of Term | 450022 | Lodged:15:29 01 July 2014Applied For Period:5 YearsRECORDED:15:29 01 July 2014GRANTED:16 July 2014Granted Period:5 YearsTerm Extended To:05/07/2019 |
Partial Surrender - Compulsory | 465787 | Lodged:08:30 16 April 2015Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 1106 j, o, t, y
HAMERSLEY RANGE 1107 g, h, j, k, m, n, o, p, r, s, t, u, w, x, y, z
HAMERSLEY RANGE 1108 a, b, f, g, l, m, q, r, v, w
HAMERSLEY RANGE 1178 d
HAMERSLEY RANGE 1179 b, c
HAMERSLEY RANGE 1180 b, g, m, r, w
HAMERSLEY RANGE 1252 b, g, m, r, s, t, u, w, x, y, z
HAMERSLEY RANGE 1253 q, v
HAMERSLEY RANGE 1324 b, p
HAMERSLEY RANGE 1325 a, f, lSurrendered Total:56 BL.REJECTED:08:30 16 April 2015 |
Partial Surrender - Voluntary | 466715 | Lodged:14:16:18 01 May 2015Surrendered Blocks:HAMERSLEY RANGE 1106 j, o, t, y
HAMERSLEY RANGE 1107 g, h, j, k, m, n, o, p, r, s, t, u, w, x, y, z
HAMERSLEY RANGE 1108 a, b, f, g, l, m, q, r, v, w
HAMERSLEY RANGE 1178 d
HAMERSLEY RANGE 1179 b, c
HAMERSLEY RANGE 1180 b, g, m, r, w
HAMERSLEY RANGE 1252 b, g, m, r, s, t, u, w, x, y, z
HAMERSLEY RANGE 1253 q, v
HAMERSLEY RANGE 1324 b, p
HAMERSLEY RANGE 1325 a, f, lSurrendered Total:56 BL.REGISTERED:14:16:18 01 May 2015 |
Application to Amend | 504259 | Lodged:15:48:42 10 April 2017Amending:Address (Including DTC Details)From:Principal Place of Business : ZANTHUS RESOURCES PTY LTD, SAME AS CORRESPONDENCE and DTC :ZANTHUS RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : ZANTHUS RESOURCES PTY LTD, P.O. BOX Z5183, ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxx@coziron.com, xxxxx099 and DTC :ZANTHUS RESOURCES PTY LTD, P.O. BOX Z5183, ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxx@coziron.com, xxxxx099RECORDED:15:48:42 10 April 2017 |
Forfeiture | 542469 | Initiated:22/10/2018 for non-compliance with expenditure conditionsRECORDED:14:30 09 November 2018Notice Issued:Regulation 50 Notice sent 22/10/2018 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:27/11/2018FINALISED:Order by Minister on 18 December 2018 that E 08/1684-I be Penalty Imposed |
Application to Amend | 544269 | Lodged:16:08 07 December 2018Amending:Address (Including DTC Details)From:ZANF PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:ZANF PTY LTD, ZANF PTY LTD, PO BOX 1492, WEST PERTH, WA, 6872, xxxxxxx@mcreasy.com.au, xxxxxxx100RECORDED:16:08 07 December 2018 |
Fine | 544896 | Fine in respect to:Forfeiture Process 542469Fine reason:Non-compliance with expenditure obligationsPenalty amount:$12,360.00Notification date:18/12/2018Due date:22/01/2019Pursuant to:Section 96A(5)RECORDED:18 December 2018PAYMENT RECEIVED:17 January 2019FINALISED:18 January 2019Receipt Number:10082836Amount:$12,360.00Remaining balance:$0.00 |
Extension / Renewal of Term | 557899 | Lodged:14:54:42 04 July 2019Applied For Period:2 YearsRECORDED:14:54:42 04 July 2019REFUSED:04 November 2019Licence Expired:04/11/2019 |
Expiry - Full | 566019 | EFFECTIVE:Midnight 04 November 2019 |