# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 22-Dec-2006 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 22-Dec-2006 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Dec-2006 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Dec-2006 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Dec-2006 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Dec-2006 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing mining on Protection of Vermin Proof Fence Reserve 16454, Water Rabbit Department Reserves 16513, 16514, Water Reserves 14396 and 16512. | 22-Dec-2006 | |
8 | 1 | No interference with Geodetic Survey Stations A 42, A 43 and A 44 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 22-Dec-2006 | |
9 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 22-Dec-2006 | |
10 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E08/1645 and E08/1646 for Energia Minerals Ltd" (Reg ID 29684) dated 2 February 2011 signed by Alex Aaltonen and retained on Department of Mines and Petroleum File No. EARS-POW-29684
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 12-May-2011 | |
11 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 12-May-2011 | |
12 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 12-May-2011 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 22-Dec-2006 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 22-Dec-2006 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Dec-2006 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Dec-2006 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Dec-2006 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Dec-2006 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing mining on Protection of Vermin Proof Fence Reserve 16454, Water Rabbit Department Reserves 16513, 16514, Water Reserves 14396 and 16512. | 22-Dec-2006 | |
8 | 1 | No interference with Geodetic Survey Stations A 42, A 43 and A 44 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 22-Dec-2006 | |
9 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 22-Dec-2006 | |
10 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E08/1645 and E08/1646 for Energia Minerals Ltd" (Reg ID 29684) dated 2 February 2011 signed by Alex Aaltonen and retained on Department of Mines and Petroleum File No. EARS-POW-29684
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 12-May-2011 | |
11 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 12-May-2011 | |
12 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 12-May-2011 | |
Type | Number | Details |
Partial Surrender - Voluntary | 280343 | Lodged 11:55:00 AM on 17 Dec 2007
Surrendered Blocks: HAMERSLEY RANGE 2818 h, j, k, n, o, p, s, t, u, x, y, z; HAMERSLEY RANGE 2890 c, d, e, h, j, k, n, o, p, s, t, u, z; HAMERSLEY RANGE 2891 a, b, f, g, l, m, q, r, v, w; HAMERSLEY RANGE 2962 e, k, p; HAMERSLEY RANGE 2963 a, b, f, g, l, m, q, r, v, w; HAMERSLEY RANGE 3035 bREGISTERED 11:55 AM 17 Dec 2007 |
Bond | 370121 | Lodged:14:00 20 April 2011Bond Type:Unconditional Performance BondBond Amount:$70,000.00RECORDED:20 April 2011RETIRED:12 September 2012 |
Bond Requirement | 371311 | Requirement Date:12/05/2011Amount:$70,000.00RECORDED:14:43:56 12 May 2011FINALISED:00:00 30 July 2012 |
Extension / Renewal of Term | 387560 | Lodged:15:40 16 December 2011Applied For Period:5 YearsRECORDED:15:40 16 December 2011GRANTED:04 January 2012Granted Period:5 YearsTerm Extended To:21/12/2016 |
Deferral of Drop Off | 387583 | Lodged:15:40 16 December 2011RECORDED:15:40 16 December 2011GRANTED:04 January 2012Section 65(3) Compulsory Surrender for 40% of the licence is due to be lodged prior to 21 December 2012. |
Bond Requirement | 402561 | Requirement Date:30/07/2012Amount:$10,000.00RECORDED:12:47:03 30 July 2012FINALISED:12:47:48 26 August 2013 |
Bond | 405138 | Lodged:11:20 03 September 2012Bond Type:Unconditional Performance BondBond Amount:$10,000.00RECORDED:03 September 2012RETIRED - MRF:26 August 2013 |
Partial Surrender - Compulsory | 413559 | Lodged:12:06:03 19 December 2012Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 2821 q, r, v, w
HAMERSLEY RANGE 2891 h, n, s, x, y
HAMERSLEY RANGE 2893 a, b, f, g, l, m, q, r, v, w
HAMERSLEY RANGE 2963 c, d, h, j, n, o, s, t, x, y
HAMERSLEY RANGE 3035 c, dSurrendered Total:31 BL.REGISTERED:Midnight 21 December 2012Surrendered area to be released 08:30:00 31/01/2013 under Section 65 (3)Surrendered area released 08:30:00 31/01/2013 under Section 65 (3) |
Application to Amend | 474893 | Lodged:11:30 24 September 2015Amending:AddressFrom:ENERGIA MINERALS LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:ENERGIA MINERALS LIMITED, C/- PALADIN ENERGY MINERALS NL, LEVEL 4, 502 HAY STREET, SUBIACO, WA, 6008RECORDED:11:30 24 September 2015 |
Extension / Renewal of Term | 494082 | Lodged:10:29:53 19 September 2016Applied For Period:2 YearsRECORDED:10:29:53 19 September 2016GRANTED:06 February 2017Granted Period:2 YearsTerm Extended To:21/12/2018 |
Retention Status | 538678 | Lodged:11:41:11 07 September 2018RECORDED:11:41:11 07 September 2018APPROVED:09:31:53 07 December 2018Pursuant to Section 69B(3) of the Mining Pact 1978, approval takes effect on the day on which the notice is published in the gazette. Notice of approval published in Gazette 7th December 2018. |
Expiry - Partial | 544286 | Retained Blocks:HAMERSLEY RANGE 2964 u, y, z
HAMERSLEY RANGE 2965 q, v
HAMERSLEY RANGE 3036 d, e
HAMERSLEY RANGE 3037 a, bRetained Total:9 BL.EFFECTIVE:15:30 07 December 2018Area of licence reduced upon grant of Retention Status 538678 |
Extension / Renewal of Term | 544610 | Lodged:08:30 13 December 2018Applied For Period:2 YearsRECORDED:08:30 13 December 2018GRANTED:18 December 2018Granted Period:2 YearsTerm Extended To:21/12/2020 |
Application to Amend | 546840 | Lodged:13:40:06 30 January 2019Amending:NameFrom:PALADIN ENERGY MINERALS NLTo:PALADIN ENERGY MINERALS PTY LTDRECORDED:13:40:06 30 January 2019 |
Application to Amend | 577284 | Lodged:11:39:21 05 May 2020Amending:Address (Including DTC Details)From:Principal Place of Business : PALADIN ENERGY MINERALS PTY LTD, LEVEL 4, 502 HAY STREET, SUBIACO, WA, 6008 and DTC :PALADIN ENERGY MINERALS PTY LTD, LEVEL 4, 502 HAY STREET, SUBIACO, WA, 6008To:Principal Place of Business : PALADIN ENERGY MINERALS PTY LTD, LEVEL 4, 502 HAY ST, SUBIACO, WA, 6008, xxxx@paladinenergy.com.au, xxxxxxxxx366 and DTC :PALADIN ENERGY MINERALS PTY LTD, PALADIN ENERGY MINERALS PTY LTD, LEVEL 4, 502 HAY ST, SUBIACO, WA, 6008, xxxx@paladinenergy.com.au, xxxxxxxxx366RECORDED:11:39:21 05 May 2020 |
Extension / Renewal of Term | 591778 | Lodged:12:24:21 04 December 2020Applied For Period:2 YearsRECORDED:12:24:21 04 December 2020GRANTED:09 March 2021Granted Period:2 YearsTerm Extended To:21/12/2022 |
Application to Amend | 622331 | Lodged:08:30 13 May 2021Amending:Address (Including DTC Details)From:Principal Place of Business : PALADIN ENERGY MINERALS PTY LTD, LEVEL 4, 502 HAY ST, SUBIACO, WA, 6008, xxxx@paladinenergy.com.au, xxxxxxxxx366 and DTC :PALADIN ENERGY MINERALS PTY LTD, PALADIN ENERGY MINERALS PTY LTD, LEVEL 4, 502 HAY ST, SUBIACO, WA, 6008, xxxx@paladinenergy.com.au, xxxxxxxxx366To:Principal Place of Business : PALADIN ENERGY MINERALS PTY LTD, LEVEL 8, 191 ST GEORGE TERRACE, PERTH, WA, 6000, xxxx@paladinenergy.com.au, xxxxxxxxx366 and DTC :PALADIN ENERGY MINERALS PTY LTD, JOHN STEPHEN ASH - TENEMENT MANAGER, PO BOX 8062, CLOISTERS SQUARE, CLOISTERS SQUARE PO, WA, 6850, xxxx@paladinenergy.com.au, xxxxxxxxx366RECORDED:08:30 13 May 2021 |
Application to Amend | 653298 | Lodged:13:44:17 12 July 2022Amending:Address (Including DTC Details)From:Principal Place of Business : PALADIN ENERGY MINERALS PTY LTD, LEVEL 8, 191 ST GEORGE TERRACE, PERTH, WA, 6000, xxxx@paladinenergy.com.au, xxxxxxxxx366 and DTC :PALADIN ENERGY MINERALS PTY LTD, JOHN STEPHEN ASH - TENEMENT MANAGER, PO BOX 8062, CLOISTERS SQUARE, CLOISTERS SQUARE PO, WA, 6850, xxxx@paladinenergy.com.au, xxxxxxxxx366To:Principal Place of Business : PALADIN ENERGY MINERALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxxx979 and DTC :PALADIN ENERGY MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxxx979RECORDED:13:44:17 12 July 2022 |
Extension / Renewal of Term | 665028 | Lodged:09:33:27 08 December 2022Applied For Period:2 YearsRECORDED:09:33:27 08 December 2022GRANTED:22 February 2023Granted Period:2 YearsTerm Extended To:21/12/2024 |
Extension / Renewal of Term | 721692 | Lodged:11:27:41 11 December 2024Applied For Period:2 YearsRECORDED:11:27:41 11 December 2024GRANTED:19 December 2024Granted Period:2 YearsTerm Extended To:21/12/2026 |