1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 07-Nov-2006 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 07-Nov-2006 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-Nov-2006 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-Nov-2006 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-Nov-2006 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-Nov-2006 | |
7 | 1 | No interference with Geodetic Survey Station DEMPSTER and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 07-Nov-2006 | |
8 | 5 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
- "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
- (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033;
- "Programme of Work on E08/1554 and E47/1538 for Iron Ore Holdings Limited" (Reg ID 37536) dated 31 October 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum File No. EARS-POW-37536;
- "Programme of Work on E08/1551-l and E08/1900-l for Iron Ore Holdings Limited" (Reg ID 45931) dated 14 February 2014 signed by Peter Huscha and retained on Department of Mines and Petroleum File No. EARS-POW-45931
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 13-May-2014 | |
8 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
- "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
- (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033;
- "Programme of Work on E08/1554 and E47/1538 for Iron Ore Holdings Limited" (Reg ID 37536) dated 31 October 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum File No. EARS-POW-37536
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 03-Jan-2013 | 12-May-2014 |
8 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
- "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
- (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 19-Apr-2012 | 02-Jan-2013 |
8 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
- "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 19-Dec-2011 | 18-Apr-2012 |
8 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 26-Nov-2008 | 18-Dec-2011 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 26-Nov-2008 | |
10 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 26-Nov-2008 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 07-Nov-2006 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 07-Nov-2006 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-Nov-2006 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-Nov-2006 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-Nov-2006 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-Nov-2006 | |
7 | 1 | No interference with Geodetic Survey Station DEMPSTER and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 07-Nov-2006 | |
8 | 5 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
- "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
- (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033;
- "Programme of Work on E08/1554 and E47/1538 for Iron Ore Holdings Limited" (Reg ID 37536) dated 31 October 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum File No. EARS-POW-37536;
- "Programme of Work on E08/1551-l and E08/1900-l for Iron Ore Holdings Limited" (Reg ID 45931) dated 14 February 2014 signed by Peter Huscha and retained on Department of Mines and Petroleum File No. EARS-POW-45931
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 13-May-2014 | |
8 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
- "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
- (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033;
- "Programme of Work on E08/1554 and E47/1538 for Iron Ore Holdings Limited" (Reg ID 37536) dated 31 October 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum File No. EARS-POW-37536
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 03-Jan-2013 | 12-May-2014 |
8 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
- "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
- (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 19-Apr-2012 | 02-Jan-2013 |
8 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
- "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 19-Dec-2011 | 18-Apr-2012 |
8 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 26-Nov-2008 | 18-Dec-2011 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 26-Nov-2008 | |
10 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 26-Nov-2008 | |
Type | Number | Details |
Application to Amend | 285321 | Lodged 9:30 AM on 05 Mar 2008 amending address for Pel Iron Ore Pty Ltd to read: " C/- Emerald Tenement Services, 25 Charles Street, SOUTH PERTH WA 6151"RECORDED 9:30 AM 05 Mar 2008 |
Fine | 291412 | Penalty of $360 imposed pursuant to section 96A(5) for late lodgement of Form 5
Date Due: 20 June 2008 Date Paid: 29 May 2008RECORDED 21 May 2008 |
Application to Amend | 299309 | Lodged 2:56:00 PM on 08 Sep 2008 amending the address to read " c/- Hetherington Exploration and Mining Title Services Pty Ltd, PO Box 8249, Perth Business Centre, WA, 6151.RECORDED 2:56 PM 08 Sep 2008 |
Bond | 300239 | Lodged 10:30 AM on 23 Sep 2008 For $11,000.00 (Unconditional Performance Bond)REJECTED 10:30 AM 23 Sep 2008RELODGED 9:00 AM 30 Sep 2008RECORDED:30 September 2008RETIRED:20 December 2011 |
Bond Requirement | 306990 | Requirement Date:26/11/2008Amount:$11,000.00RECORDED:09:38:17 26 November 2008FINALISED:08:16:32 19 December 2011 |
Exemption from Drop-off | 332851 | Lodged:15:38 19 October 2009For relief from the provisions of Section 65(1)(a)RECORDED:15:38 19 October 2009GRANTED:04 November 2009 |
Exemption from Drop-off | 358443 | Lodged:15:20 29 October 2010for relief from the provisions of Section 65(1)(b)RECORDED:15:20 29 October 2010GRANTED:22 December 2010 |
Excess Tonnage | 383155 | Lodged:14:30 12 October 2011RECORDED:14:30 12 October 2011Approved for an additional 1,568 tonnesGRANTED:16:00 15 November 2011 |
Extension / Renewal of Term | 384424 | Lodged:16:05 01 November 2011Applied For Period:2 YearsRECORDED:16:05 01 November 2011GRANTED:17 November 2011Granted Period:2 YearsTerm Extended To:06/11/2013 |
Bond | 386424 | Lodged:13:20 01 December 2011Bond Type:Unconditional Performance BondBond Amount:$28,000.00RECORDED:19 December 2011RETIRED:19 April 2012 |
Bond Requirement | 387596 | Requirement Date:19/12/2011Amount:$28,000.00RECORDED:10:10:41 19 December 2011FINALISED:08:43:45 19 April 2012 |
Excess Tonnage | 391067 | Lodged:15:30 09 February 2012RECORDED:15:30 09 February 2012Approved for additional 420 tonnesGRANTED:15:17:12 08 March 2012 |
Bond | 395482 | Lodged:15:45 13 April 2012Bond Type:Unconditional Performance BondBond Amount:$47,000.00RECORDED:19 April 2012RETIRED:11 March 2013 |
Bond Requirement | 395839 | Requirement Date:19/04/2012Amount:$47,000.00RECORDED:07:52:16 19 April 2012FINALISED:10:20:26 13 May 2014 |
Excess Tonnage | 404171 | Lodged:00:00 20 August 2012For an additional 799 tonnes.GRANTED:00:00 09 October 2012 |
Bond | 418490 | Lodged:08:35 06 March 2013Bond Type:Unconditional Performance BondBond Amount:$47,000.00RECORDED:06 March 2013RETIRED:14 May 2014 |
Application to Amend | 422354 | Lodged:16:05 02 May 2013Amending:AddressFrom:Residential : MAL'S RIDGE PTY LTD, SAME AS CORRESPONDENCE and Correspondence :MAL'S RIDGE PTY LTD, C/- LEVEL 1, 1 ALTONA STREET, WEST PERTH, WA, 6005To:Residential : MAL'S RIDGE PTY LTD, ADDRESS NOT PROVIDED and Correspondence :MAL'S RIDGE PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH, WA, 6849RECORDED:16:05 02 May 2013 |
Excess Tonnage | 424133 | Lodged:08:30 23 May 2013RECORDED:08:30 23 May 2013An additional 494 tonnesGRANTED:08:59:53 11 July 2013 |
Extension / Renewal of Term | 431946 | Lodged:09:16:15 26 September 2013Applied For Period:2 YearsRECORDED:09:16:15 26 September 2013GRANTED:15 October 2013Granted Period:2 YearsTerm Extended To:06/11/2015 |
Bond | 444989 | Lodged:15:20 28 April 2014Bond Type:Unconditional Performance BondBond Amount:$57,000.00RECORDED:28 April 2014RETIRED - MRF:16 October 2014 |
Bond Requirement | 445834 | Requirement Date:07/05/2014Amount:$57,000.00RECORDED:00:00 13 May 2014FINALISED:07:56:11 16 October 2014 |
Extension / Renewal of Term | 476822 | Lodged:09:46:55 02 November 2015Applied For Period:1 YearsRECORDED:09:46:55 02 November 2015GRANTED:06 January 2016Granted Period:1 YearsTerm Extended To:06/11/2016 |
Application to Amend | 490143 | Lodged:10:31:34 07 July 2016Amending:Address (Including DTC Details)From:MAL'S RIDGE PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:MAL'S RIDGE PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:10:31:34 07 July 2016 |
Extension / Renewal of Term | 496311 | Lodged:08:59:45 01 November 2016Applied For Period:1 YearsRECORDED:08:59:45 01 November 2016GRANTED:03 January 2017Granted Period:1 YearsTerm Extended To:06/11/2017 |
Extension / Renewal of Term | 517643 | Lodged:13:14:19 02 November 2017Applied For Period:1 YearsRECORDED:13:14:19 02 November 2017GRANTED:09 January 2018Granted Period:1 YearsTerm Extended To:06/11/2018 |
Extension / Renewal of Term | 541061 | Lodged:11:31:18 22 October 2018Applied For Period:1 YearsRECORDED:11:31:18 22 October 2018GRANTED:19 November 2018Granted Period:1 YearsTerm Extended To:06/11/2019 |
Surrender - Outright | 565962 | Lodged:10:26:11 04 November 2019REGISTERED:10:26:11 04 November 2019 |
Bond Number | Name | Surety | Amount | Bond Date | Status | Status Date | Type | Ceased | Other Affected Tenements |
445834 | Bond Requirement | | $57,000.00 | 07-May-2014 | Finalised | 16-Oct-2014 | Unconditional Performance Bond | true | |
444989 | Bond - Unconditional Performance Bond | WESTPAC BANKING CORPORATION | $57,000.00 (Inital) | 28-Apr-2014 | Retired - MRF | 16-Oct-2014 | Unconditional Performance Bond | true | |
418490 | Bond - Unconditional Performance Bond | WESTPAC BANKING CORPORATION | $47,000.00 (Inital) | 06-Mar-2013 | Retired | 14-May-2014 | Unconditional Performance Bond | true | |
395839 | Bond Requirement | | $47,000.00 | 19-Apr-2012 | Finalised | 13-May-2014 | Unconditional Performance Bond | true | |
395482 | Bond - Unconditional Performance Bond | WESTPAC BANKING CORPORATION | $47,000.00 (Inital) | 13-Apr-2012 | Retired | 11-Mar-2013 | Unconditional Performance Bond | true | |
387596 | Bond Requirement | | $28,000.00 | 19-Dec-2011 | Finalised | 19-Apr-2012 | Unconditional Performance Bond | true | |
386424 | Bond - Unconditional Performance Bond | WESTPAC BANKING CORPORATION | $28,000.00 (Inital) | 01-Dec-2011 | Retired | 19-Apr-2012 | Unconditional Performance Bond | true | |
306990 | Bond Requirement | | $11,000.00 | 17-Dec-2008 | Finalised | 19-Dec-2011 | | true | |
300239 | Bond - Unconditional Performance Bond | WESTPAC BANKING CORPORATION | $11,000.00 (Inital) | 30-Sep-2008 | Retired | 20-Dec-2011 | Unconditional Performance Bond | true | |