Tenement: E08-1554

View on Landtracker Maps (logon required)

Extracted from MTO on 25-Jun-2025 00:22, last changed 08-Nov-2023.

Tenement Summary

Identifier:E 08/1554-IType:Exploration Licence
Status:DeadDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:47 BL
Purposes:Term:5 Years (Extended)
Markout:Received:28-Jul-2005 08:51
Commence:07-Nov-2006 Expiry:06-Nov-2019

Holders

Company NameSharesTotal Shares
MAL'S RIDGE PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
PEL IRON PTY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25028-Jul-2005 47.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.07-Nov-2006
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.07-Nov-2006
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.07-Nov-2006
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.07-Nov-2006
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.07-Nov-2006
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
07-Nov-2006
71No interference with Geodetic Survey Station DEMPSTER and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.07-Nov-2006
85The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
  • "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
  • (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033;
  • "Programme of Work on E08/1554 and E47/1538 for Iron Ore Holdings Limited" (Reg ID 37536) dated 31 October 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum File No. EARS-POW-37536;
  • "Programme of Work on E08/1551-l and E08/1900-l for Iron Ore Holdings Limited" (Reg ID 45931) dated 14 February 2014 signed by Peter Huscha and retained on Department of Mines and Petroleum File No. EARS-POW-45931
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
13-May-2014
84The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
  • "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
  • (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033;
  • "Programme of Work on E08/1554 and E47/1538 for Iron Ore Holdings Limited" (Reg ID 37536) dated 31 October 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum File No. EARS-POW-37536
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
03-Jan-2013 12-May-2014
83The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
  • "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
  • (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
19-Apr-2012 02-Jan-2013
82The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
  • "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
19-Dec-2011 18-Apr-2012
81The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
26-Nov-2008 18-Dec-2011
91The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.26-Nov-2008
101All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses.26-Nov-2008

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.07-Nov-2006
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.07-Nov-2006
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.07-Nov-2006
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.07-Nov-2006
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.07-Nov-2006
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
07-Nov-2006
71No interference with Geodetic Survey Station DEMPSTER and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.07-Nov-2006
85The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
  • "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
  • (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033;
  • "Programme of Work on E08/1554 and E47/1538 for Iron Ore Holdings Limited" (Reg ID 37536) dated 31 October 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum File No. EARS-POW-37536;
  • "Programme of Work on E08/1551-l and E08/1900-l for Iron Ore Holdings Limited" (Reg ID 45931) dated 14 February 2014 signed by Peter Huscha and retained on Department of Mines and Petroleum File No. EARS-POW-45931
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
13-May-2014
84The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
  • "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
  • (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033;
  • "Programme of Work on E08/1554 and E47/1538 for Iron Ore Holdings Limited" (Reg ID 37536) dated 31 October 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum File No. EARS-POW-37536
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
03-Jan-2013 12-May-2014
83The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
  • "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701;
  • (Reg. ID 34033) "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" dated 8 February 2012 signed by Peter Boyd and retained on Department of Mines and Petroleum file No. EARS-POW-34033.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
19-Apr-2012 02-Jan-2013
82The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501;
  • "Programme of Work on E08/1554 for Iron Ore Holdings Ltd" (Reg. ID 32701) dated 11 October 2011 signed by Brett Phyland, Principal Geologist and retained on Department of Mines and Petroleum file No. EARS-POW-32701.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
19-Dec-2011 18-Apr-2012
81The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work for Iron Ore Holdings Ltd on E08/1554" (Reg. ID 20200) dated 27 August 2008 signed by Brett Phyland, and retained on Department of Industry and Resources file No. T3175/200501.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
26-Nov-2008 18-Dec-2011
91The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.26-Nov-2008
101All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses.26-Nov-2008

Dealings

TypeNumberDetails
Application to Amend285321Lodged 9:30 AM on 05 Mar 2008 amending address for Pel Iron Ore Pty Ltd to read: " C/- Emerald Tenement Services, 25 Charles Street, SOUTH PERTH WA 6151"RECORDED 9:30 AM 05 Mar 2008
Fine291412Penalty of $360 imposed pursuant to section 96A(5) for late lodgement of Form 5 Date Due: 20 June 2008 Date Paid: 29 May 2008RECORDED 21 May 2008
Application to Amend299309Lodged 2:56:00 PM on 08 Sep 2008 amending the address to read " c/- Hetherington Exploration and Mining Title Services Pty Ltd, PO Box 8249, Perth Business Centre, WA, 6151.RECORDED 2:56 PM 08 Sep 2008
Bond300239Lodged 10:30 AM on 23 Sep 2008 For $11,000.00 (Unconditional Performance Bond)REJECTED 10:30 AM 23 Sep 2008RELODGED 9:00 AM 30 Sep 2008RECORDED:30 September 2008RETIRED:20 December 2011
Bond Requirement306990Requirement Date:26/11/2008Amount:$11,000.00RECORDED:09:38:17 26 November 2008FINALISED:08:16:32 19 December 2011
Exemption from Drop-off332851Lodged:15:38 19 October 2009For relief from the provisions of Section 65(1)(a)RECORDED:15:38 19 October 2009GRANTED:04 November 2009
Exemption from Drop-off358443Lodged:15:20 29 October 2010for relief from the provisions of Section 65(1)(b)RECORDED:15:20 29 October 2010GRANTED:22 December 2010
Excess Tonnage383155Lodged:14:30 12 October 2011RECORDED:14:30 12 October 2011Approved for an additional 1,568 tonnesGRANTED:16:00 15 November 2011
Extension / Renewal of Term384424Lodged:16:05 01 November 2011Applied For Period:2 YearsRECORDED:16:05 01 November 2011GRANTED:17 November 2011Granted Period:2 YearsTerm Extended To:06/11/2013
Bond386424Lodged:13:20 01 December 2011Bond Type:Unconditional Performance BondBond Amount:$28,000.00RECORDED:19 December 2011RETIRED:19 April 2012
Bond Requirement387596Requirement Date:19/12/2011Amount:$28,000.00RECORDED:10:10:41 19 December 2011FINALISED:08:43:45 19 April 2012
Excess Tonnage391067Lodged:15:30 09 February 2012RECORDED:15:30 09 February 2012Approved for additional 420 tonnesGRANTED:15:17:12 08 March 2012
Bond395482Lodged:15:45 13 April 2012Bond Type:Unconditional Performance BondBond Amount:$47,000.00RECORDED:19 April 2012RETIRED:11 March 2013
Bond Requirement395839Requirement Date:19/04/2012Amount:$47,000.00RECORDED:07:52:16 19 April 2012FINALISED:10:20:26 13 May 2014
Excess Tonnage404171Lodged:00:00 20 August 2012For an additional 799 tonnes.GRANTED:00:00 09 October 2012
Bond418490Lodged:08:35 06 March 2013Bond Type:Unconditional Performance BondBond Amount:$47,000.00RECORDED:06 March 2013RETIRED:14 May 2014
Application to Amend422354Lodged:16:05 02 May 2013Amending:AddressFrom:Residential : MAL'S RIDGE PTY LTD, SAME AS CORRESPONDENCE and Correspondence :MAL'S RIDGE PTY LTD, C/- LEVEL 1, 1 ALTONA STREET, WEST PERTH, WA, 6005To:Residential : MAL'S RIDGE PTY LTD, ADDRESS NOT PROVIDED and Correspondence :MAL'S RIDGE PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH, WA, 6849RECORDED:16:05 02 May 2013
Excess Tonnage424133Lodged:08:30 23 May 2013RECORDED:08:30 23 May 2013An additional 494 tonnesGRANTED:08:59:53 11 July 2013
Extension / Renewal of Term431946Lodged:09:16:15 26 September 2013Applied For Period:2 YearsRECORDED:09:16:15 26 September 2013GRANTED:15 October 2013Granted Period:2 YearsTerm Extended To:06/11/2015
Bond444989Lodged:15:20 28 April 2014Bond Type:Unconditional Performance BondBond Amount:$57,000.00RECORDED:28 April 2014RETIRED - MRF:16 October 2014
Bond Requirement445834Requirement Date:07/05/2014Amount:$57,000.00RECORDED:00:00 13 May 2014FINALISED:07:56:11 16 October 2014
Extension / Renewal of Term476822Lodged:09:46:55 02 November 2015Applied For Period:1 YearsRECORDED:09:46:55 02 November 2015GRANTED:06 January 2016Granted Period:1 YearsTerm Extended To:06/11/2016
Application to Amend490143Lodged:10:31:34 07 July 2016Amending:Address (Including DTC Details)From:MAL'S RIDGE PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:MAL'S RIDGE PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:10:31:34 07 July 2016
Extension / Renewal of Term496311Lodged:08:59:45 01 November 2016Applied For Period:1 YearsRECORDED:08:59:45 01 November 2016GRANTED:03 January 2017Granted Period:1 YearsTerm Extended To:06/11/2017
Extension / Renewal of Term517643Lodged:13:14:19 02 November 2017Applied For Period:1 YearsRECORDED:13:14:19 02 November 2017GRANTED:09 January 2018Granted Period:1 YearsTerm Extended To:06/11/2018
Extension / Renewal of Term541061Lodged:11:31:18 22 October 2018Applied For Period:1 YearsRECORDED:11:31:18 22 October 2018GRANTED:19 November 2018Granted Period:1 YearsTerm Extended To:06/11/2019
Surrender - Outright565962Lodged:10:26:11 04 November 2019REGISTERED:10:26:11 04 November 2019

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201915-Oct-2018 9714655983$26,649.0047 BL07-Nov-2006 $26,649.00$0.00
Rental201831-Oct-2017 8419516086$25,145.0047 BL07-Nov-2006 $25,145.00$0.00
Rental201731-Oct-2016 MT-210010803979-EF$24,327.2047 BL07-Nov-2006 $24,327.20$0.00
Rental201630-Oct-2015 MT-210010411737-EF$23,528.2047 BL07-Nov-2006 $23,528.20$0.00
Rental201528-Oct-2014 06-140203PERTH$22,931.3047 BL07-Nov-2006 $22,931.30$0.00
Rental201426-Sep-2013 06-128866PERTH$22,348.5047 BL07-Nov-2006 $22,348.50$0.00
Rental201324-Oct-2012 06-116571PERTH$11,571.4047 BL07-Nov-2006 $11,571.40$0.00
Rental201201-Nov-2011 102022PERTH$11,256.5047 BL07-Nov-2006 $11,256.50$0.00
Rental201116-Nov-2010 86772PERTH$8,856.2147 BL07-Nov-2006 $8,856.21$0.00
Rental201023-Nov-2009 72597PERTH$8,675.2647 BL07-Nov-2006 $8,675.26$0.00
Rental200927-Oct-2008 57920PERTH$5,350.9547 BL07-Nov-2006 $5,350.95$0.00
Rental200816-Jan-2008 46941PERTH$18.0047 BL07-Nov-2006 $5,175.17$0.00
Rental200814-Nov-2007 44744PERTH$5,157.17
Rental200724-Aug-2006 28133PERTH$433.3447 BL07-Nov-2006 $4,766.74$0.00
Rental200728-Jul-2005 1081KARRATHA$4,333.40

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2019$141,000.00false
2018$141,000.0026-Oct-2018 $164,614.03$105,449.69$0.00$0.00$30,964.34$28,200.00$0.00false
2017$141,000.0030-Nov-2017 $171,302.58$112,956.38$0.00$0.00$30,146.20$28,200.00$0.00false
2016$141,000.0021-Nov-2016 $160,061.46$102,585.28$0.00$0.00$29,276.18$28,200.00$0.00false
2015$141,000.0022-Dec-2015 $164,866.65$108,248.48$0.00$0.00$28,418.17$28,200.00$0.00false
2014$141,000.0014-Nov-2014 $475,261.98$369,864.95$0.00$0.00$31,425.03$73,972.00$0.00false
2013$94,000.0025-Nov-2013 $855,056.74$698,014.59$0.00$1,529.24$15,778.91$139,734.00$0.00false
2012$94,000.0024-Dec-2012 $5,365,871.00$4,536,393.00$0.00$48,304.00$16,221.00$764,953.00$0.00false
2011$70,500.0019-Dec-2011 $2,669,997.00$2,177,176.00$0.00$39,793.00$15,280.00$437,748.00$0.00false
2010$70,500.0007-Dec-2010 $1,106,125.00$1,045,014.00$0.00$41,699.00$15,871.00$3,541.00$0.00false
2009$47,000.0009-Dec-2009 $250,204.00$203,529.00$0.00$0.00$5,971.00$40,704.00$0.00false
2008$47,000.0005-Dec-2008 $131,457.00$115,651.00$0.00$0.00$11,836.00$3,970.00$0.00false
2007$47,000.0030-Jan-2008 $99,957.00$77,558.00$0.00$0.00$6,887.00$15,512.00$0.00false

Bond

Bond NumberNameSuretyAmountBond DateStatusStatus DateTypeCeasedOther Affected Tenements
445834Bond Requirement$57,000.0007-May-2014 Finalised16-Oct-2014 Unconditional Performance Bondtrue
444989Bond - Unconditional Performance BondWESTPAC BANKING CORPORATION$57,000.00 (Inital)28-Apr-2014 Retired - MRF16-Oct-2014 Unconditional Performance Bondtrue
418490Bond - Unconditional Performance BondWESTPAC BANKING CORPORATION$47,000.00 (Inital)06-Mar-2013 Retired14-May-2014 Unconditional Performance Bondtrue
395839Bond Requirement$47,000.0019-Apr-2012 Finalised13-May-2014 Unconditional Performance Bondtrue
395482Bond - Unconditional Performance BondWESTPAC BANKING CORPORATION$47,000.00 (Inital)13-Apr-2012 Retired11-Mar-2013 Unconditional Performance Bondtrue
387596Bond Requirement$28,000.0019-Dec-2011 Finalised19-Apr-2012 Unconditional Performance Bondtrue
386424Bond - Unconditional Performance BondWESTPAC BANKING CORPORATION$28,000.00 (Inital)01-Dec-2011 Retired19-Apr-2012 Unconditional Performance Bondtrue
306990Bond Requirement$11,000.0017-Dec-2008 Finalised19-Dec-2011 true
300239Bond - Unconditional Performance BondWESTPAC BANKING CORPORATION$11,000.00 (Inital)30-Sep-2008 Retired20-Dec-2011 Unconditional Performance Bondtrue

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
05-Jun-2006 Tenement ApplicationNT Cleared