1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Nov-2005 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 28-Aug-2024 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 29-Nov-2005 | 27-Aug-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Nov-2005 | |
4 | 3 | Unless the written approval of the Environment Officer, Environment Division, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 31-Jul-2007 | |
4 | 2 | Unless the written approval of the Director, Environment Division, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.Unless the written approval of the Environment Officer, Environment Division, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Jul-2007 | 30-Jul-2007 |
4 | 1 | Unless the written approval of the Director, Environment Division, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Nov-2005 | 29-Jul-2007 |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Nov-2005 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Nov-2005 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 29-Nov-2005 | |
8 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Scimitar Resources on E08/1489 and 08/1493 (Exp 6193)" dated 19 February 2007 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200401
- "Programme of Work for Scimitar Resources Pty Limited on E08/1493 (EXP 6799)" dated 25 May 2007 signed by Mark Fogarty, and retained on Department of Industry and Resources file No. T4247/200401.
- "Programme of Work for Scimitar Resources Limited on E08/1493" (Exp 8696) dated 20 March 2008 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200402;
- "Programme of Work on E08/1493 for Cauldron Energy Limited" (Reg ID 28283) dated 14 September 2010 signed by Mark Couzens and retained on Department of Mines and Petroleum File No. EARS-POW-28283
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 25-May-2011 | |
8 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Scimitar Resources on E08/1489 and 08/1493 (Exp 6193)" dated 19 February 2007 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200401
- "Programme of Work for Scimitar Resources Pty Limited on E08/1493 (EXP 6799)" dated 25 May 2007 signed by Mark Fogarty, and retained on Department of Industry and Resources file No. T4247/200401.
- "Programme of Work for Scimitar Resources Limited on E08/1493" (Exp 8696) dated 20 March 2008 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200402
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 04-Aug-2008 | 24-May-2011 |
8 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Scimitar Resources on E08/1489 and 08/1493 (Exp 6193)" dated 19 February 2007 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200401
- "Programme of Work for Scimitar Resources Pty Limited on E08/1493 (EXP 6799)" dated 25 May 2007 signed by Mark Fogarty, and retained on Department of Industry and Resources file No. T4247/200401.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 30-Jul-2007 | 03-Aug-2008 |
8 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Scimitar Resources on E08/1489 and 08/1493 (Exp 6193)" dated 19 February 2007 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200401
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 20-Jun-2007 | 29-Jul-2007 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 20-Jun-2007 | |
10 | 1 | The Licensee arranging lodgement of a Bond in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the licence in the sum of: | 20-Jun-2007 | 30-Jul-2007 |
11 | 1 | The Licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of: | 30-Jul-2007 | 03-Aug-2008 |
12 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 04-Aug-2008 | |
13 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 28-Aug-2024 | |
14 | 1 | Unless the written approval of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 28-Aug-2024 | |
15 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 28-Aug-2024 | |
16 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 28-Aug-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Nov-2005 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 28-Aug-2024 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 29-Nov-2005 | 27-Aug-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Nov-2005 | |
4 | 3 | Unless the written approval of the Environment Officer, Environment Division, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 31-Jul-2007 | |
4 | 2 | Unless the written approval of the Director, Environment Division, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.Unless the written approval of the Environment Officer, Environment Division, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Jul-2007 | 30-Jul-2007 |
4 | 1 | Unless the written approval of the Director, Environment Division, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Nov-2005 | 29-Jul-2007 |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Nov-2005 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Nov-2005 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 29-Nov-2005 | |
8 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Scimitar Resources on E08/1489 and 08/1493 (Exp 6193)" dated 19 February 2007 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200401
- "Programme of Work for Scimitar Resources Pty Limited on E08/1493 (EXP 6799)" dated 25 May 2007 signed by Mark Fogarty, and retained on Department of Industry and Resources file No. T4247/200401.
- "Programme of Work for Scimitar Resources Limited on E08/1493" (Exp 8696) dated 20 March 2008 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200402;
- "Programme of Work on E08/1493 for Cauldron Energy Limited" (Reg ID 28283) dated 14 September 2010 signed by Mark Couzens and retained on Department of Mines and Petroleum File No. EARS-POW-28283
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 25-May-2011 | |
8 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Scimitar Resources on E08/1489 and 08/1493 (Exp 6193)" dated 19 February 2007 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200401
- "Programme of Work for Scimitar Resources Pty Limited on E08/1493 (EXP 6799)" dated 25 May 2007 signed by Mark Fogarty, and retained on Department of Industry and Resources file No. T4247/200401.
- "Programme of Work for Scimitar Resources Limited on E08/1493" (Exp 8696) dated 20 March 2008 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200402
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 04-Aug-2008 | 24-May-2011 |
8 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Scimitar Resources on E08/1489 and 08/1493 (Exp 6193)" dated 19 February 2007 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200401
- "Programme of Work for Scimitar Resources Pty Limited on E08/1493 (EXP 6799)" dated 25 May 2007 signed by Mark Fogarty, and retained on Department of Industry and Resources file No. T4247/200401.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 30-Jul-2007 | 03-Aug-2008 |
8 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Works for Scimitar Resources on E08/1489 and 08/1493 (Exp 6193)" dated 19 February 2007 signed by Mark Fogarty and retained on Department of Industry and Resources File No. T4247/200401
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 20-Jun-2007 | 29-Jul-2007 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 20-Jun-2007 | |
10 | 1 | The Licensee arranging lodgement of a Bond in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the licence in the sum of: | 20-Jun-2007 | 30-Jul-2007 |
11 | 1 | The Licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of: | 30-Jul-2007 | 03-Aug-2008 |
12 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 04-Aug-2008 | |
13 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 28-Aug-2024 | |
14 | 1 | Unless the written approval of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 28-Aug-2024 | |
15 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 28-Aug-2024 | |
16 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 28-Aug-2024 | |
Type | Number | Details |
Bond | 262555 | Lodged on 20 Mar 2007 For $10,000.00 (Security)RECORDED 21 Mar 2007RETIRED 25 Jul 2007 |
Bond | 269309 | Lodged on 03 Jul 2007 For $18,000.00 (Unconditional Performance Bond)REJECTED 03 Jul 2007RELODGED 20 Jul 2007RECORDED 20 Jul 2007RETIRED:25 May 2011 |
Fine | 278689 | Penalty of $50 imposed pursuant to Section 96A(5) for non comliance with the annual mineral exploration reporting provisions.
Date due: 28 Dec 2007 Date paid: 13 Dec 2007RECORDED 28 Nov 2007Penalty amount:$50.00Notification date:28/11/2007Due date:28/12/2007Pursuant to:Section 96A(5)RECORDED:28 November 2007PAYMENT RECEIVED:13 December 2007FINALISED:13 December 2007Receipt Number:45812Amount:$50.00 |
Bond | 292686 | Lodged on 06 Jun 2008 For $6,000.00 (Unconditional Performance Bond)RECORDED 06 Jun 2008RETIRED:25 May 2011 |
Bond Requirement | 307548 | Requirement Date:04/08/2008Amount:$24,000.00RECORDED:14:54:31 04 August 2008FINALISED:11:40:03 25 May 2011 |
Exemption from Drop-off | 305637 | Lodged:14:58 28 November 2008For relief from the provisions of Section 65(1)(a)RECORDED:14:58 28 November 2008GRANTED:31 March 2009 |
Mortgage | 308019 | Lodged:12:10 24 December 2008Mortgaged Shares:100/100 shares SCIMITAR RESOURCES LTDMortgagee:DEMPSEY RESOURCES PTY LTDREGISTERED:12:10 24 December 2008 |
Application to Amend | 326086 | Lodged:15:42 21 July 2009Amending:NameFrom:SCIMITAR RESOURCES LTDTo:CAULDRON ENERGY LTDRECORDED:15:42 21 July 2009 |
Exemption from Drop-off | 335172 | Lodged:15:36 23 November 2009For relief from the provisions of Section 65(1)(b)RECORDED:15:36 23 November 2009GRANTED:15 January 2010 |
Forfeiture | 345159 | Initiated:13/04/2010 for non-compliance with reporting requirementsRECORDED:10:20:28 21 April 2010Notice Issued:Regulation 50 Notice sent 13/04/2010 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:14/05/2010FINALISED:Order by Minister on 09 July 2010 that E 08/1493 be Penalty Imposed |
Fine | 351175 | Fine in respect to:Forfeiture Process 345159Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$270.00Notification date:15/07/2010Due date:16/08/2010Pursuant to:Section 96A(5)RECORDED:15 July 2010PAYMENT RECEIVED:29 July 2010Receipt Number:82328Amount:$270.00Remaining balance:$0.00FINALISED:29 July 2010 |
Extension / Renewal of Term | 358064 | Lodged:16:05 22 October 2010Applied For Period:2 YearsRECORDED:16:05 22 October 2010GRANTED:12 November 2010Granted Period:2 YearsTerm Extended To:28/11/2012 |
Bond | 363806 | Lodged:12:30 20 January 2011Bond Type:Unconditional Performance BondBond Amount:$44,000.00REJECTED:12:30 20 January 2011 |
Bond | 364826 | Lodged:14:50 07 February 2011Bond Type:Unconditional Performance BondBond Amount:$44,000.00RECORDED:07 February 2011RETIRED - MRF:02 December 2013 |
Bond Requirement | 372168 | Requirement Date:25/05/2011Amount:$44,000.00RECORDED:00:00 25 May 2011FINALISED:09:34 02 December 2013 |
Application to Amend | 383064 | Lodged:11:31 20 September 2011Amending:AddressFrom:CAULDRON ENERGY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638, PERTH BUSINESS CENTRE, WA, 6849To:CAULDRON ENERGY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931RECORDED:11:31 20 September 2011 |
Application to Amend | 397008 | Lodged:13:30 08 May 2012Amending:AddressFrom:Residential : CAULDRON ENERGY LTD, SAME AS CORRESPONDENCE and Correspondence :CAULDRON ENERGY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Residential : CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and Correspondence :CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST PERTH, WA, 6901RECORDED:13:30 08 May 2012 |
Extension / Renewal of Term | 411867 | Lodged:16:07 26 November 2012Applied For Period:2 YearsRECORDED:16:07 26 November 2012GRANTED:08 February 2013Granted Period:2 YearsTerm Extended To:28/11/2014 |
Forfeiture | 416732 | Initiated:13/02/2013 for non-compliance with expenditure requirementsRECORDED:11:42:49 11 February 2013Notice Issued:Regulation 50 Notice sent 13/02/2013 for non-compliance with expenditure requirements pursuant to Reg 21/Sec 63A- under expended.Compliance Date:18/03/2013WITHDRAWN:29 May 2013 (replacement form 5 lodged) |
Application to Amend | 417992 | Lodged:09:30 28 February 2013Amending:AddressFrom:CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST PERTH, WA, 6901To:CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901RECORDED:09:30 28 February 2013 |
Application to Amend | 435588 | Lodged:09:00 22 November 2013Amending:AddressFrom:Residential : CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and Correspondence :CAULDRON ENERGY LTD, ATT. SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901To:Residential : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and Correspondence :CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901RECORDED:09:00 22 November 2013 |
Extension / Renewal of Term | 458293 | Lodged:08:30 27 November 2014Applied For Period:1 YearsRECORDED:08:30 27 November 2014GRANTED:02 February 2015Granted Period:1 YearsTerm Extended To:28/11/2015 |
Extension / Renewal of Term | 477936 | Lodged:16:03 26 November 2015Applied For Period:1 YearsRECORDED:16:03 26 November 2015GRANTED:11 April 2016Granted Period:1 YearsTerm Extended To:28/11/2016 |
Extension / Renewal of Term | 497724 | Lodged:08:30 28 November 2016Applied For Period:1 YearsRECORDED:08:30 28 November 2016GRANTED:31 January 2017Granted Period:1 YearsTerm Extended To:28/11/2017 |
Application to Amend | 512344 | Lodged:13:48:12 10 August 2017Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, 32 HARROGATE STREET, WEST LEEDERVILLE, WA, 6007 and DTC :CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901To:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, NGAIRE KOCH, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555RECORDED:13:48:12 10 August 2017 |
Extension / Renewal of Term | 519145 | Lodged:12:28:53 28 November 2017Applied For Period:1 YearsRECORDED:12:28:53 28 November 2017GRANTED:30 January 2018Granted Period:1 YearsTerm Extended To:28/11/2018 |
Application to Amend | 524209 | Lodged:15:11:18 21 February 2018Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, NGAIRE KOCH, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxx@capelam.com.au, xxxxxxx555To:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555RECORDED:15:11:18 21 February 2018 |
Extension / Renewal of Term | 543510 | Lodged:15:46:34 28 November 2018Applied For Period:1 YearsRECORDED:15:46:34 28 November 2018GRANTED:14 January 2019Granted Period:1 YearsTerm Extended To:28/11/2019 |
Extension of Time | 546570 | Lodged:15:31:17 24 January 2019Type:Form 5RECORDED:15:31:17 24 January 2019APPROVED:08:47:40 29 January 2019 |
Extension / Renewal of Term | 567644 | Lodged:11:03:54 28 November 2019Applied For Period:1 YearsRECORDED:11:03:54 28 November 2019GRANTED:30 January 2020Granted Period:1 YearsTerm Extended To:28/11/2020 |
Extension / Renewal of Term | 591345 | Lodged:08:30 27 November 2020Applied For Period:1 YearsRECORDED:08:30 27 November 2020GRANTED:27 May 2021Granted Period:1 YearsTerm Extended To:28/11/2021 |
Application to Amend | 618461 | Lodged:08:30 23 March 2021Amending:Address (Including DTC Details)From:Principal Place of Business : CAULDRON ENERGY LTD, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901, xxxxxxxxxxxxx@capelam.com.au, xxxxxxx555To:Principal Place of Business : CAULDRON ENERGY LTD, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941 and DTC :CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941RECORDED:08:30 23 March 2021 |
Application to Amend | 620719 | Lodged:15:18:10 20 April 2021Amending:Address (Including DTC Details)From:CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941To:CAULDRON ENERGY LTD, MELISSA CAYLEY, TENEMENT MANAGER, PO BOX 1024, WEST LEEDERVILLE, WA, 6007, xxxxxxxxxxxxxx@cauldronenergy.com.au, xxxxxxx941RECORDED:15:18:10 20 April 2021 |
Extension / Renewal of Term | 636559 | Lodged:08:30 26 November 2021Applied For Period:1 YearsRECORDED:08:30 26 November 2021GRANTED:27 January 2022Granted Period:1 YearsTerm Extended To:28/11/2022 |
Extension / Renewal of Term | 663985 | Lodged:12:28:17 25 November 2022Applied For Period:1 YearsRECORDED:12:28:17 25 November 2022GRANTED:02 March 2023Granted Period:1 YearsTerm Extended To:28/11/2023 |
Extension / Renewal of Term | 690772 | Lodged:11:54:22 24 November 2023Applied For Period:1 YearsRECORDED:11:54:22 24 November 2023GRANTED:27 February 2024Granted Period:1 YearsTerm Extended To:28/11/2024 |
Extension / Renewal of Term | 720562 | Lodged:08:30 27 November 2024Applied For Period:1 YearsRECORDED:08:30 27 November 2024GRANTED:28 January 2025Granted Period:1 YearsTerm Extended To:28/11/2025 |