# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 06-Feb-2006 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 06-Feb-2006 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-Feb-2006 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-Feb-2006 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-Feb-2006 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-Feb-2006 | |
7 | 1 | No interference with Geodetic Survey Station YRY 27 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 06-Feb-2006 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 06-Feb-2006 | |
9 | 1 | No mining within 25 metres of either side of the Gas pipelines contained within FNA's 1370, 3259, 3904, 3907 and 3928 as shown in TENGRAPH. | 06-Feb-2006 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer. | 06-Feb-2006 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas pipelines. | 06-Feb-2006 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer. | 06-Feb-2006 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipelines without the prior written consent of the State Mining Engineer. | 06-Feb-2006 | |
14 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer. | 06-Feb-2006 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipelines. | 06-Feb-2006 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister for State Development for the purpose of protecting the Gas pipelines. | 06-Feb-2006 | |
17 | 1 | In respect of the area covered by this licence if the Thalanyji people (being the applicants in Federal Court Application No. WAD 6113/1998 (WC99/45) send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Thalanyji the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatji Land and Sea Council. | 06-Feb-2006 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 06-Feb-2006 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 06-Feb-2006 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-Feb-2006 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-Feb-2006 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-Feb-2006 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-Feb-2006 | |
7 | 1 | No interference with Geodetic Survey Station YRY 27 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 06-Feb-2006 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 06-Feb-2006 | |
9 | 1 | No mining within 25 metres of either side of the Gas pipelines contained within FNA's 1370, 3259, 3904, 3907 and 3928 as shown in TENGRAPH. | 06-Feb-2006 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer. | 06-Feb-2006 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas pipelines. | 06-Feb-2006 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer. | 06-Feb-2006 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipelines without the prior written consent of the State Mining Engineer. | 06-Feb-2006 | |
14 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer. | 06-Feb-2006 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipelines. | 06-Feb-2006 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister for State Development for the purpose of protecting the Gas pipelines. | 06-Feb-2006 | |
17 | 1 | In respect of the area covered by this licence if the Thalanyji people (being the applicants in Federal Court Application No. WAD 6113/1998 (WC99/45) send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Thalanyji the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatji Land and Sea Council. | 06-Feb-2006 | |
Type | Number | Details |
Exemption from Drop-off | 311907 | Lodged:14:50 05 February 2009for relief from the provisions of Section 65(1)(a)RECORDED:14:50 05 February 2009GRANTED:22 April 2009 |
Exemption from Drop-off | 340161 | Lodged:14:50 05 February 2010For relief from the provisions of Section 65(1)(b).RECORDED:14:50 05 February 2010GRANTED:09 February 2010 |
Extension / Renewal of Term | 364516 | Lodged:16:20 01 February 2011Applied For Period:2 YearsRECORDED:16:20 01 February 2011GRANTED:07 February 2011Granted Period:2 YearsTerm Extended To:05/02/2013 |
Extension / Renewal of Term | 415857 | Lodged:08:30 29 January 2013Applied For Period:2 YearsRECORDED:08:30 29 January 2013GRANTED:15 April 2013Granted Period:2 YearsTerm Extended To:05/02/2015 |
Application to Amend | 450753 | Lodged:13:04:42 15 July 2014Amending:AddressFrom:ENERGY METALS LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:ENERGY METALS LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:13:04:42 15 July 2014 |
Extension / Renewal of Term | 461720 | Lodged:15:35 04 February 2015Applied For Period:1 YearsRECORDED:15:35 04 February 2015GRANTED:21 April 2015Granted Period:1 YearsTerm Extended To:05/02/2016 |
Extension / Renewal of Term | 480366 | Lodged:08:30 19 January 2016Applied For Period:1 YearsRECORDED:08:30 19 January 2016GRANTED:18 May 2016Granted Period:1 YearsTerm Extended To:05/02/2017 |
Partial Surrender - Voluntary | 499864 | Lodged:16:23:21 18 January 2017Surrendered Blocks:HAMERSLEY RANGE 2031 v, w, x
HAMERSLEY RANGE 2103 a, b, f, l, q, r, s, v, w, x
HAMERSLEY RANGE 2175 a, b, c, f, g, h, l, m, nSurrendered Total:22 BL.REGISTERED:16:23:21 18 January 2017 |
Conversion | 500467 | New Tenement:R 08/3Application Date:15:01:59 13 Jan 2017Section:S70B |
Expiry - Partial | 501038 | EFFECTIVE:Midnight 05 February 2017This licence continues in force on and after 12 midnight on 05 Feb 2017 only in respect to that land contained within application for Retention Licence 08/3. |
Extension of Time | 621689 | Lodged:11:00:27 04 May 2021Type:Stat DecRECORDED:11:00:27 04 May 2021APPROVED:09:28:05 05 May 2021Time to lodged extended to 14 May 2022 |