Extracted from MTO on 09-Jul-2025 00:25,
last changed 02-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 22-Apr-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 22-Apr-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Apr-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Apr-2008 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Apr-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Apr-2008 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 22-Apr-2008 | |
8 | 1 | No interference with the optic fibre cable or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 22-Apr-2008 | |
9 | 1 | No mining within 25 metres of either side of any Gas pipeline. | 22-Apr-2008 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zones established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 22-Apr-2008 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zones established by Condition 9 hereof without the prior approval of the operators of the Gas pipelines. | 22-Apr-2008 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zones established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 22-Apr-2008 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipelines without the prior written consent of the State Mining Engineer, DoCEP | 22-Apr-2008 | |
14 | 1 | Mining on the Safety Zones established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 22-Apr-2008 | |
15 | 1 | The rights of ingress to and egress from the pipeline easements established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipelines. | 22-Apr-2008 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister for State Development for the purpose of protecting the Gas pipelines. | 22-Apr-2008 | |
17 | 1 | No interference with Geodetic Survey Station YLA 9, YLA 10, KAP 5, MJ 6 and MJ 6T and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 22-Apr-2008 | |
18 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 22-Apr-2008 | |
19 | 1 | In respect of the area covered by the licence the Licensee, if so requested in writing by the Kurrama Marthudunera, the applicants in Federal Court application no. WAD 6090 of 1998 (WC99/12), such request being sent by pre-paid post to reach the Licensee's address Baljeet Singh, Legal Counsel, Mineralogy Pty Ltd, PO Box 7334, Cloisters Square, PERTH WA 6850 not more than ninety days after the grant of this licence, shall within thirty days of the request execute in favour of the Kurrama Marthudunera the Regional Standard Heritage Agreement ("RSHA") endorsed by peak industry groups and the Pilbara Native Title Service. | 22-Apr-2008 | |
| 1 | Consent to conduct exploration activities on Stock Route Reserve 9701 granted, subject to: | 22-Apr-2008 | |
20 | 1 | No exploration activities being carried out on Stock Route Reserve 9701 which restrict the use of the reserve. | 22-Apr-2008 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 22-Apr-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 22-Apr-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Apr-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Apr-2008 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-Apr-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-Apr-2008 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 22-Apr-2008 | |
8 | 1 | No interference with the optic fibre cable or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 22-Apr-2008 | |
9 | 1 | No mining within 25 metres of either side of any Gas pipeline. | 22-Apr-2008 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zones established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 22-Apr-2008 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zones established by Condition 9 hereof without the prior approval of the operators of the Gas pipelines. | 22-Apr-2008 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zones established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 22-Apr-2008 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipelines without the prior written consent of the State Mining Engineer, DoCEP | 22-Apr-2008 | |
14 | 1 | Mining on the Safety Zones established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 22-Apr-2008 | |
15 | 1 | The rights of ingress to and egress from the pipeline easements established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipelines. | 22-Apr-2008 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister for State Development for the purpose of protecting the Gas pipelines. | 22-Apr-2008 | |
17 | 1 | No interference with Geodetic Survey Station YLA 9, YLA 10, KAP 5, MJ 6 and MJ 6T and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 22-Apr-2008 | |
18 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 22-Apr-2008 | |
19 | 1 | In respect of the area covered by the licence the Licensee, if so requested in writing by the Kurrama Marthudunera, the applicants in Federal Court application no. WAD 6090 of 1998 (WC99/12), such request being sent by pre-paid post to reach the Licensee's address Baljeet Singh, Legal Counsel, Mineralogy Pty Ltd, PO Box 7334, Cloisters Square, PERTH WA 6850 not more than ninety days after the grant of this licence, shall within thirty days of the request execute in favour of the Kurrama Marthudunera the Regional Standard Heritage Agreement ("RSHA") endorsed by peak industry groups and the Pilbara Native Title Service. | 22-Apr-2008 | |
| 1 | Consent to conduct exploration activities on Stock Route Reserve 9701 granted, subject to: | 22-Apr-2008 | |
20 | 1 | No exploration activities being carried out on Stock Route Reserve 9701 which restrict the use of the reserve. | 22-Apr-2008 | |
Type | Number | Details |
Licence Instrument | 416814 | Lodged:00:00 22 April 2008ISSUED:00:00 22 April 2008 |
Application for Forfeiture | KR2/101 | Lodged:12:07 22 July 2010Applicant:STATE RESOURCES PTY LTDRespondent:MINERALOGY PTY LTDRECORDED:12:07 22 July 2010Application for Forfeiture dismissed re: Iron Ore Processing Agreement Act 2002Warden's Determination:Dismissed 13/08/2010 10:00:00 |
Amalgamation | 407892 | Lodged:12:00 05 October 2012Amalgamating:Whole of P 08/594Situated within:External boundaries of E 08/1451-IAmalgamating:Whole of P 08/596Situated within:External boundaries of E 08/1451-IAmalgamating:Whole of P 08/597Situated within:External boundaries of E 08/1451-IAmalgamating:Whole of P 08/601Situated within:External boundaries of E 08/1451-IWithdrawn 21/07/2014 in respect to P 08/594Withdrawn 21/07/2014 in respect to P 08/596Withdrawn 21/07/2014 in respect to P 08/597Withdrawn 21/07/2014 in respect to P 08/601 |
Extension / Renewal of Term | 415201 | Lodged:16:20 17 January 2013Applied For Period:1 YearsRECORDED:16:20 17 January 2013GRANTED:12 February 2013Granted Period:1 YearsTerm Extended To:21/04/2014 |
Extension / Renewal of Term | 443628 | Lodged:14:30 04 April 2014Applied For Period:1 YearsRECORDED:14:30 04 April 2014GRANTED:29 April 2014Granted Period:1 YearsTerm Extended To:21/04/2015 |
Extension / Renewal of Term | 462605 | Lodged:15:32:29 18 February 2015Applied For Period:1 YearsRECORDED:15:32:29 18 February 2015GRANTED:17 April 2015Granted Period:1 YearsTerm Extended To:21/04/2016 |
Extension / Renewal of Term | 463247 | Lodged:14:28:06 03 March 2015Applied For Period:1 YearsRECORDED:14:28:06 03 March 2015WITHDRAWN:03 March 2015Application 462605 lodged 18/02/2015 |
Extension / Renewal of Term | 479113 | Lodged:13:58:04 17 December 2015Applied For Period:1 YearsRECORDED:13:58:04 17 December 2015GRANTED:22 December 2015Granted Period:1 YearsTerm Extended To:21/04/2017 |
Extension / Renewal of Term | 502856 | Lodged:15:23:29 20 March 2017Applied For Period:1 YearsRECORDED:15:23:29 20 March 2017GRANTED:04 July 2017Granted Period:1 YearsTerm Extended To:21/04/2018 |
Application to Amend | 518670 | Lodged:16:16:51 20 November 2017Amending:Address (Including DTC Details)From:Principal Place of Business : MINERALOGY PTY LTD, SAME AS CORRESPONDENCE and DTC :MINERALOGY PTY LTD, PO BOX 1538, BRISBANE, QLD, 4001To:Principal Place of Business : MINERALOGY PTY LTD, GPO BOX 1538, BRISBANE, QLD, 4001, xxxxxxxxxxxx@mineralogy.com.au, xxxxxxx229 and DTC :MINERALOGY PTY LTD, CHRIS SPIELVOGEL, GPO BOX 1538, BRISBANE, QLD, 4001, xxxxxxxxxxxx@mineralogy.com.au, xxxxxxx229RECORDED:16:16:51 20 November 2017 |
Extension / Renewal of Term | 520954 | Lodged:12:20:56 28 December 2017Applied For Period:1 YearsRECORDED:12:20:56 28 December 2017GRANTED:19 January 2018Granted Period:1 YearsTerm Extended To:21/04/2019 |
Extension / Renewal of Term | 544292 | Lodged:10:13:51 10 December 2018Applied For Period:1 YearsRECORDED:10:13:51 10 December 2018GRANTED:19 March 2019Granted Period:1 YearsTerm Extended To:21/04/2020 |
Extension / Renewal of Term | 566616 | Lodged:14:00 14 November 2019Applied For Period:1 YearsRECORDED:14:00 14 November 2019GRANTED:18 February 2021Granted Period:1 YearsTerm Extended To:21/04/2021 |
Extension / Renewal of Term | 595313 | Lodged:11:09:01 04 February 2021Applied For Period:1 YearsRECORDED:11:09:01 04 February 2021GRANTED:18 February 2021Granted Period:1 YearsTerm Extended To:21/04/2022 |
Extension / Renewal of Term | 638623 | Lodged:09:09:07 04 January 2022Applied For Period:1 YearsRECORDED:09:09:07 04 January 2022GRANTED:15 February 2022Granted Period:1 YearsTerm Extended To:21/04/2023 |
Extension / Renewal of Term | 669314 | Lodged:14:52:50 20 February 2023Applied For Period:1 YearsRECORDED:14:52:50 20 February 2023GRANTED:21 March 2023Granted Period:1 YearsTerm Extended To:21/04/2024 |
Application to Amend | 678438 | Lodged:14:20:20 13 June 2023Amending:Address (Including DTC Details)From:Principal Place of Business : MINERALOGY PTY LTD, GPO BOX 1538, BRISBANE, QLD, 4001, xxxxxxxxxxxx@mineralogy.com.au, xxxxxxx229 and DTC :MINERALOGY PTY LTD, CHRIS SPIELVOGEL, GPO BOX 1538, BRISBANE, QLD, 4001, xxxxxxxxxxxx@mineralogy.com.au, xxxxxxx229To:Principal Place of Business : MINERALOGY PTY LTD, GPO BOX 1538, BRISBANE, QLD, 4001, xxxxxxx@waratahcoal.com, xxxxxxxxx181 and DTC :MINERALOGY PTY LTD, NUI HARRIS, GPO BOX 1538, BRISBANE, QLD, 4001, xxxxxxx@waratahcoal.com, xxxxxxxxx181RECORDED:14:20:20 13 June 2023 |
Extension / Renewal of Term | 686714 | Lodged:13:01:49 26 September 2023Applied For Period:1 YearsRECORDED:13:01:49 26 September 2023GRANTED:12 February 2024Granted Period:1 YearsTerm Extended To:21/04/2025 |
Extension / Renewal of Term | 718614 | Lodged:14:17:26 01 November 2024Applied For Period:1 YearsRECORDED:14:17:26 01 November 2024GRANTED:19 May 2025Granted Period:1 YearsTerm Extended To:21/04/2026 |