Extracted from MTO on 04-Mar-2021 04:04,
last changed 16-Oct-2020.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 02-Sep-2011 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 02-Sep-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 02-Sep-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 02-Sep-2011 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 02-Sep-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 02-Sep-2011 | |
7 | 1 | No activities being carried out within the proposed railway corridor (designated FNA 9018 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent. | 02-Sep-2011 | |
8 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:- "Programme of Work on E08/1439, E08/1440 and E08/1685 for Fortescue Metals Group Limited (REG ID: 38254) dated 17 January 2013 signed by Catherine Bozanich, and retained on Department of Mines and Petroleum file no. EARS-POW-38254.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 28-May-2013 | |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 28-May-2013 | |
10 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 28-May-2013 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 02-Sep-2011 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 02-Sep-2011 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 02-Sep-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 02-Sep-2011 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 02-Sep-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 02-Sep-2011 | |
7 | 1 | No activities being carried out within the proposed railway corridor (designated FNA 9018 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent. | 02-Sep-2011 | |
8 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:- "Programme of Work on E08/1439, E08/1440 and E08/1685 for Fortescue Metals Group Limited (REG ID: 38254) dated 17 January 2013 signed by Catherine Bozanich, and retained on Department of Mines and Petroleum file no. EARS-POW-38254.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 28-May-2013 | |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 28-May-2013 | |
10 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 28-May-2013 | |
Type | Number | Details |
Iron Ore Inclusion | 197050 | Lodged 8:30:00 AM on 04 Mar 2004RECORDED 8:30 AM 04 Mar 2004AUTHORISED:00:00 02 September 2011 |
Application to Amend | 395606 | Lodged:15:45 11 March 2013Amending:AddressFrom:FMG PILBARA PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:15:45 11 March 2013 |
Bond | 422181 | Lodged:09:30 01 May 2013Bond Type:Unconditional Performance BondBond Amount:$13,000.00RECORDED:01 May 2013RETIRED - MRF:20 September 2013 |
Bond Requirement | 424094 | Requirement Date:28/05/2013Amount:$13,000.00RECORDED:14:53:01 28 May 2013FINALISED:08:56:21 20 September 2013 |
Exemption from Drop-off | 453864 | Lodged:14:55 29 August 2014for the relief from the provisions of Section 65(1)(a)RECORDED:14:55 29 August 2014GRANTED:04 November 2014 |
Exemption from Drop-off | 473472 | Lodged:15:40 20 August 2015RECORDED:15:40 20 August 2015GRANTED:22 October 2015 |
Extension / Renewal of Term | 493130 | Lodged:09:43:18 31 August 2016Applied For Period:2 YearsRECORDED:09:43:18 31 August 2016GRANTED:02 November 2016Granted Period:2 YearsTerm Extended To:01/09/2018 |
Extension / Renewal of Term | 538084 | Lodged:13:42:02 30 August 2018Applied For Period:2 YearsRECORDED:13:42:02 30 August 2018GRANTED:01 November 2018Granted Period:2 YearsTerm Extended To:01/09/2020 |
Excess Tonnage | 581419 | Lodged:08:54:05 06 July 2020RECORDED:08:54:05 06 July 2020GRANTED:15:30 15 July 2020Additional 24,637 tonnes |
Extension / Renewal of Term | 584003 | Lodged:09:38:34 12 August 2020Applied For Period:1 YearsRECORDED:09:38:34 12 August 2020GRANTED:15 October 2020Granted Period:1 YearsTerm Extended To:01/09/2021 |
Application to Amend | 587109 | Lodged:10:26:02 25 September 2020Amending:Address (Including DTC Details)From:Principal Place of Business : FMG PILBARA PTY LTD, SAME AS CORRESPONDENCE and DTC :FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004To:Principal Place of Business : FMG PILBARA PTY LTD, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxxxxxxxxxxxx@fmgl.com.au and DTC :FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxxxxxxxxxxxx@fmgl.com.auRECORDED:10:26:02 25 September 2020 |
Application to Amend | 587934 | Lodged:15:58 08 October 2020Amending:Address (Including DTC Details)From:FMG PILBARA PTY LTD, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxxxxxxxxxxxx@fmgl.com.auTo:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxxxxxxxxxxxx@fmgl.com.auRECORDED:15:58 08 October 2020 |