1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 15-Jun-2004 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 15-Jun-2004 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Jun-2004 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Jun-2004 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Jun-2004 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Jun-2004 | |
7 | 1 | No interference with Geodetic Survey Stations J85A/2, J85A/6, YRY39 and YRY39T and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 15-Jun-2004 | |
| 1 | In respect to the area of land designated EPA9.8 in Tengraph, hereinafter referred to as the designated area, the following shall apply: | 15-Jun-2004 | |
8 | 1 | Prior to accessing the licence area, the licensee shall consult with the Regional Environmental Officer, Department of Industry and Resources (DoIR), and ensure that where required all vehicles and equipment entering the designated area are washed down to remove soil and plant propagules and adhering to such conditions specified for the prevention of the spread of soil-borne diseases. | 15-Jun-2004 | |
9 | 1 | Prior to any activity involving disturbance to vegetation and soils including:-- exploration access; and/or
- exploration sampling;
the licensee preparing a detailed program for each phase of proposed exploration for written approval of the State Mining Engineer.The State Mining Engineer to consult with the Regional/District Manager, Department of Conservation and Land Management or the Department of Environmental Protection or other government agency (as relevant) prior to approval. This program to describe the environmental impacts and programs for their management and is to include:-- maps and/or aerial photographs showing the proposed locations of all ground activities and disturbances;
- the purpose, specifications and extent of each activity and disturbance;
- descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be disturbed by such proposed disturbances.
- details on proposals that may disturb sensitive terrestrial habitats including any declared rare flora and fauna if applicable;
- procedures to protect the integrity of special ecosystems such as wetland systems, mangal communities and rainforests areas (and/or associated rainforest monitoring sites) if applicable;
- techniques, prescriptions, and timetable for rehabilitation of all proposed disturbances;
- undertaking for corrective measures for failed rehabilitation;
- details of water requirements from within the designated area;
- details of refuse disposal; and
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 15-Jun-2004 | |
10 | 1 | Access to and from and the movement of vehicles within the licence area being restricted to ground or seasonal conditions and routes approved under the program or otherwise agreed by the Regional Environmental Officer, DoIR. | 15-Jun-2004 | |
11 | 1 | At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the State Mining Engineer outlining the progress of the operation and rehabilitation program and the proposed operations and rehabilitation programs for the next 12 months. | 15-Jun-2004 | |
12 | 1 | Prior to the cessation of the exploration/prospecting activity in the designated area, the licensee notifying the Regional Environmental Officer, DoIR and arranging an inspection as required. | 15-Jun-2004 | |
| 1 | In respect to the area of land designated "AW7" in Tengraph (ANCA Wetland), the following shall apply: | 15-Jun-2004 | |
13 | 1 | Written notification, where practicable, of the time frame, type and extent of proposed ground disturbing activities being forwarded to the Water and Rivers Commission Karratha seven days prior to commencement of those activities. | 15-Jun-2004 | |
14 | 1 | Any significant waterway (flowing or not), wetland or its fringing vegetation that may exist on site not being disturbed or removed without prior written approval from Water and Rivers Commission. | 15-Jun-2004 | |
15 | 1 | The rights of ingress to and egress from the Licence being at all reasonable times preserved to officers of Water and Rivers Commission for inspection and investigation purposes. | 15-Jun-2004 | |
16 | 1 | The storage and disposal of hydrocarbons, chemicals and potentially hazardous substances being in accordance with the Water and Rivers Commission's Guidelines and Water Quality Protection Notes. | 15-Jun-2004 | |
17 | 1 | All Mining Act tenement activities prohibited within 200 metres of RAMSAR or ANCA listed wetlands unless written permission of Department of Conservation and Land Management, in consultation with Water and Rivers Commission, is first obtained. | 15-Jun-2004 | |
18 | 1 | All Mining Act tenement activities prohibited within 200 metres of "Conservation" and "Resource Enhancement" Category wetlands unless written permission of Water and Rivers Commission is first obtained. | 15-Jun-2004 | |
| 1 | In respect to that area designated FNA5237 in Tengraph, being former Pastoral Lease 3114/605, the following shall apply: | 15-Jun-2004 | |
19 | 1 | Prior to any ground-disturbing activity, as defined by the State Mining Engineer, the licensee preparing a detailed program for each phase of proposed exploration for approval of the State Mining Engineer. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 15-Jun-2004 | |
20 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the State Mining Engineer. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 15-Jun-2004 | |
21 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Regional Environmental Officer, Department of Industry and Resources and arranging an inspection as required. | 15-Jun-2004 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 15-Jun-2004 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 15-Jun-2004 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Jun-2004 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Jun-2004 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Jun-2004 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Jun-2004 | |
7 | 1 | No interference with Geodetic Survey Stations J85A/2, J85A/6, YRY39 and YRY39T and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 15-Jun-2004 | |
| 1 | In respect to the area of land designated EPA9.8 in Tengraph, hereinafter referred to as the designated area, the following shall apply: | 15-Jun-2004 | |
8 | 1 | Prior to accessing the licence area, the licensee shall consult with the Regional Environmental Officer, Department of Industry and Resources (DoIR), and ensure that where required all vehicles and equipment entering the designated area are washed down to remove soil and plant propagules and adhering to such conditions specified for the prevention of the spread of soil-borne diseases. | 15-Jun-2004 | |
9 | 1 | Prior to any activity involving disturbance to vegetation and soils including:-- exploration access; and/or
- exploration sampling;
the licensee preparing a detailed program for each phase of proposed exploration for written approval of the State Mining Engineer.The State Mining Engineer to consult with the Regional/District Manager, Department of Conservation and Land Management or the Department of Environmental Protection or other government agency (as relevant) prior to approval. This program to describe the environmental impacts and programs for their management and is to include:-- maps and/or aerial photographs showing the proposed locations of all ground activities and disturbances;
- the purpose, specifications and extent of each activity and disturbance;
- descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be disturbed by such proposed disturbances.
- details on proposals that may disturb sensitive terrestrial habitats including any declared rare flora and fauna if applicable;
- procedures to protect the integrity of special ecosystems such as wetland systems, mangal communities and rainforests areas (and/or associated rainforest monitoring sites) if applicable;
- techniques, prescriptions, and timetable for rehabilitation of all proposed disturbances;
- undertaking for corrective measures for failed rehabilitation;
- details of water requirements from within the designated area;
- details of refuse disposal; and
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 15-Jun-2004 | |
10 | 1 | Access to and from and the movement of vehicles within the licence area being restricted to ground or seasonal conditions and routes approved under the program or otherwise agreed by the Regional Environmental Officer, DoIR. | 15-Jun-2004 | |
11 | 1 | At agreed intervals, not greater than 12 monthly, the licensee providing a brief report to the State Mining Engineer outlining the progress of the operation and rehabilitation program and the proposed operations and rehabilitation programs for the next 12 months. | 15-Jun-2004 | |
12 | 1 | Prior to the cessation of the exploration/prospecting activity in the designated area, the licensee notifying the Regional Environmental Officer, DoIR and arranging an inspection as required. | 15-Jun-2004 | |
| 1 | In respect to the area of land designated "AW7" in Tengraph (ANCA Wetland), the following shall apply: | 15-Jun-2004 | |
13 | 1 | Written notification, where practicable, of the time frame, type and extent of proposed ground disturbing activities being forwarded to the Water and Rivers Commission Karratha seven days prior to commencement of those activities. | 15-Jun-2004 | |
14 | 1 | Any significant waterway (flowing or not), wetland or its fringing vegetation that may exist on site not being disturbed or removed without prior written approval from Water and Rivers Commission. | 15-Jun-2004 | |
15 | 1 | The rights of ingress to and egress from the Licence being at all reasonable times preserved to officers of Water and Rivers Commission for inspection and investigation purposes. | 15-Jun-2004 | |
16 | 1 | The storage and disposal of hydrocarbons, chemicals and potentially hazardous substances being in accordance with the Water and Rivers Commission's Guidelines and Water Quality Protection Notes. | 15-Jun-2004 | |
17 | 1 | All Mining Act tenement activities prohibited within 200 metres of RAMSAR or ANCA listed wetlands unless written permission of Department of Conservation and Land Management, in consultation with Water and Rivers Commission, is first obtained. | 15-Jun-2004 | |
18 | 1 | All Mining Act tenement activities prohibited within 200 metres of "Conservation" and "Resource Enhancement" Category wetlands unless written permission of Water and Rivers Commission is first obtained. | 15-Jun-2004 | |
| 1 | In respect to that area designated FNA5237 in Tengraph, being former Pastoral Lease 3114/605, the following shall apply: | 15-Jun-2004 | |
19 | 1 | Prior to any ground-disturbing activity, as defined by the State Mining Engineer, the licensee preparing a detailed program for each phase of proposed exploration for approval of the State Mining Engineer. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 15-Jun-2004 | |
20 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the State Mining Engineer. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 15-Jun-2004 | |
21 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Regional Environmental Officer, Department of Industry and Resources and arranging an inspection as required. | 15-Jun-2004 | |
Type | Number | Details |
Conversion | 264644 | Lodged 9:44:40 AM on 13 Dec 2006 M 08/452 applied for pursuant to Section 67.RECORDED 9:44 AM 13 Dec 2006 |
Exemption from Drop-off | 336H/067 | Lodged 2:03 PM on 11 May 2007 applying for relief from the provisions of Section 65(1)(a)GRANTED 25 May 2007 |
Exemption from Drop-off | 291238 | Lodged 2:09:00 PM on 16 May 2008 applying for relief from the provisions of Section 65(1)(b)GRANTED 26 Jun 2008 |
Extension of Time | 297205 | Lodged 3:58 PM on 11 Aug 2008 to extend time for the lodgement of Form 5 for the year ending 14 June 2008 until 29 August 2008Approved on 12 Aug 2008 |
Extension / Renewal of Term | 322762 | Lodged:14:55 10 June 2009Applied For Period:2 YearsRECORDED:14:55 10 June 2009Granted Period:2 YearsTerm Extended To:14/06/2011GRANTED:19 June 2009 |
Application to Amend | 373750 | Lodged:16:00 08 June 2011Amending:NameFrom:STRAITS SALT PTY LTDTo:YANNARIE SOLAR PTY LTDAmending:AddressFrom:STRAITS SALT PTY LTD, UNIT 1, 35 VENTNOR AVENUE, WEST PERTH, WA, 6005To:YANNARIE SOLAR PTY LTD, C/- HETHERINGTON EXPLORATION AND MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849RECORDED:16:00 08 June 2011 |
Extension / Renewal of Term | 373889 | Lodged:15:50 13 June 2011Applied For Period:2 YearsRECORDED:15:50 13 June 2011GRANTED:08 July 2011Granted Period:2 YearsTerm Extended To:14/06/2013 |
Extension / Renewal of Term | 425099 | Lodged:11:49:37 13 June 2013Applied For Period:1 YearsRECORDED:11:49:37 13 June 2013GRANTED:20 June 2013Granted Period:1 YearsTerm Extended To:14/06/2014 |
Forfeiture | 436853 | Initiated:27/11/2013 for non-compliance with expenditure conditionsRECORDED:15:00 05 December 2013Notice Issued:Regulation 50 Notice sent 27/11/2013 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:27/12/2013FINALISED:Order by Minister on 20 February 2014 that E 08/1421 be Penalty Imposed |
Fine | 440738 | Fine in respect to:Forfeiture Process 436853Fine reason:Non-compliance with expenditure obligationsPenalty amount:$7,026.00Notification date:21/02/2014Due date:25/03/2014Pursuant to:Section 96A(5)RECORDED:21 February 2014PAYMENT RECEIVED:04 March 2014Receipt Number:06-133371Amount:$7,026.00Remaining balance:$0.00FINALISED:04 March 2014 |
Application to Amend | 441040 | Lodged:15:40 25 February 2014Amending:NameFrom:YANNARIE SOLAR PTY LTDTo:NORTHWEST SALT PTY LTDAmending:AddressFrom:YANNARIE SOLAR PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:NORTHWEST SALT PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931RECORDED:15:40 25 February 2014 |
Extension / Renewal of Term | 448847 | Lodged:14:04 13 June 2014Applied For Period:1 YearsRECORDED:14:04 13 June 2014GRANTED:07 August 2014Granted Period:1 YearsTerm Extended To:14/06/2015 |
Extension / Renewal of Term | 468226 | Lodged:15:15 27 May 2015Applied For Period:1 YearsRECORDED:15:15 27 May 2015GRANTED:27 July 2015Granted Period:1 YearsTerm Extended To:14/06/2016 |
Extension / Renewal of Term | 481284 | Lodged:15:50 04 February 2016Applied For Period:1 YearsRECORDED:15:50 04 February 2016GRANTED:09 March 2016Granted Period:1 YearsTerm Extended To:14/06/2017 |
Application to Amend | 490263 | Lodged:15:40 07 July 2016Amending:NameFrom:ASHBURTON SALT PTY LTDTo:K PLUS S SALT AUSTRALIA PTY LTDAmending:Address (Including DTC Details)From:Principal Place of Business : ASHBURTON SALT PTY LTD, SUITE ONE, 338 HAY STREET, SUBIACO, WA, 6008 and DTC :ASHBURTON SALT PTY LTD, C/O MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Principal Place of Business : K PLUS S SALT AUSTRALIA PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, P.O. BOX 592, MAYLANDS, WA, 6931 and DTC :K PLUS S SALT AUSTRALIA PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931RECORDED:15:40 07 July 2016 |
Partial Surrender - Voluntary | 505229 | Lodged:16:00 24 April 2017Surrendered Blocks:HAMERSLEY RANGE 1809 w, x
HAMERSLEY RANGE 1880 k, p, t, u, x, y
HAMERSLEY RANGE 1881 a, b, f, g, l
HAMERSLEY RANGE 1952 c, d, g, h, m, n, q, r, v, w
HAMERSLEY RANGE 2023 k, p, t, u, y, z
HAMERSLEY RANGE 2024 a, b, f, g, l, q, vSurrendered Total:36 BL.REGISTERED:16:00 24 April 2017 |
Extension / Renewal of Term | 507963 | Lodged:15:53:12 08 June 2017Applied For Period:1 YearsRECORDED:15:53:12 08 June 2017GRANTED:13 November 2017Granted Period:1 YearsTerm Extended To:14/06/2018 |
Extension / Renewal of Term | 532221 | Lodged:11:22:54 07 June 2018Applied For Period:1 YearsRECORDED:11:22:54 07 June 2018GRANTED:17 August 2018Granted Period:1 YearsTerm Extended To:14/06/2019 |
Partial Surrender - Voluntary | 554167 | Lodged:14:47:34 20 May 2019Surrendered Blocks:HAMERSLEY RANGE 1809 n, o, s, tSurrendered Total:4 BL.REGISTERED:14:47:34 20 May 2019 |
Extension / Renewal of Term | 555485 | Lodged:15:52:30 06 June 2019Applied For Period:1 YearsRECORDED:15:52:30 06 June 2019GRANTED:20 August 2019Granted Period:1 YearsTerm Extended To:14/06/2020 |
Application to Amend | 576579 | Lodged:10:04:23 22 April 2020Amending:Address (Including DTC Details)From:K PLUS S SALT AUSTRALIA PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, P.O. BOX 592, MAYLANDS, WA, 6931To:K PLUS S SALT AUSTRALIA PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:10:04:23 22 April 2020 |
Extension / Renewal of Term | 579719 | Lodged:08:49:33 11 June 2020Applied For Period:1 YearsRECORDED:08:49:33 11 June 2020GRANTED:14 August 2020Granted Period:1 YearsTerm Extended To:14/06/2021 |
Extension / Renewal of Term | 624484 | Lodged:10:02:53 03 June 2021Applied For Period:1 YearsRECORDED:10:02:53 03 June 2021GRANTED:16 August 2021Granted Period:1 YearsTerm Extended To:14/06/2022 |
Extension / Renewal of Term | 649745 | Lodged:09:12:24 20 May 2022Applied For Period:1 YearsRECORDED:09:12:24 20 May 2022GRANTED:18 August 2022Granted Period:1 YearsTerm Extended To:14/06/2023 |
Partial Surrender - Voluntary | 678156 | Lodged:11:34:36 09 June 2023Surrendered Blocks:HAMERSLEY RANGE 1666 y, z
HAMERSLEY RANGE 1737 z
HAMERSLEY RANGE 1738 d, e, j, k, o, p, t, v, w, x, y
HAMERSLEY RANGE 1809 e, j, k
HAMERSLEY RANGE 1810 aSurrendered Total:18 BL.REGISTERED:11:34:36 09 June 2023 |
Extension / Renewal of Term | 678193 | Lodged:14:37:43 09 June 2023Applied For Period:1 YearsRECORDED:14:37:43 09 June 2023GRANTED:22 August 2023Granted Period:1 YearsTerm Extended To:14/06/2024 |
Extension / Renewal of Term | 705983 | Lodged:13:49:55 06 June 2024Applied For Period:1 YearsRECORDED:13:49:55 06 June 2024GRANTED:15 August 2024Granted Period:1 YearsTerm Extended To:14/06/2025 |
Expiry - Full | 736629 | EFFECTIVE:Midnight 14 June 2025 |