Extracted from MTO on 03-Jul-2025 00:36,
last changed 01-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 30-May-2005 | |
2 | 3 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Sep-2024 | |
2 | 2 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 21-May-2019 | 09-Sep-2024 |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 30-May-2005 | 20-May-2019 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-May-2005 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 21-May-2019 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-May-2005 | 20-May-2019 |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 30-May-2005 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 30-May-2005 | |
7 | 1 | No interference with Geodetic Survey Station YLA33 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 30-May-2005 | |
8 | 6 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Exp 5543) dated 23 October 2006 signed by Peter Winter and retained on Department of Industry and Resources File No. 8797/02Vol01
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Work for API Management Pty Ltd E08/1294" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0978/200702
- "Programme of Work for API Management Pty Ltd on E08/1289, E08/1294" (Reg. ID 20304) dated 8 September 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Reg. ID 20570) dated 8 October 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801;
- "Programme of Work on E08/1227, E08/1289, E08/1293, E08/1294, E08/1516, E47/1141 and E47/1693" for API Management Pty Ltd (Reg ID 22407) dated 31 July 2009 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200901
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 10-Nov-2009 | |
8 | 5 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Exp 5543) dated 23 October 2006 signed by Peter Winter and retained on Department of Industry and Resources File No. 8797/02Vol01
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Work for API Management Pty Ltd E08/1294" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0978/200702
- "Programme of Work for API Management Pty Ltd on E08/1289, E08/1294" (Reg. ID 20304) dated 8 September 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Reg. ID 20570) dated 8 October 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 04-Dec-2008 | 09-Nov-2009 |
8 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Exp 5543) dated 23 October 2006 signed by Peter Winter and retained on Department of Industry and Resources File No. 8797/02Vol01
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Work for API Management Pty Ltd E08/1294" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0978/200702
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 06-Nov-2008 | 03-Dec-2008 |
8 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Exp 5543) dated 23 October 2006 signed by Peter Winter and retained on Department of Industry and Resources File No. 8797/02Vol01
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 19-Dec-2007 | 05-Nov-2008 |
8 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Exp 5543) dated 23 October 2006 signed by Peter Winter and retained on Department of Industry and Resources File No. 8797/02Vol01
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 16-Jan-2007 | 18-Dec-2007 |
8 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 12-May-2006 | 15-Jan-2007 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 12-May-2006 | |
10 | 4 | The licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the licence in the sum of: | 19-Dec-2007 | 06-Nov-2008 |
10 | 3 | The licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the licence in the sum of: | 18-Dec-2007 | 18-Dec-2007 |
10 | 2 | The licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the licence in the sum of: | 16-Jan-2007 | 17-Dec-2007 |
10 | 1 | The licensee arranging lodgement of a Bond in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of: | 12-May-2006 | 15-Jan-2007 |
11 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 06-Nov-2008 | |
12 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Sep-2024 | |
13 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 10-Sep-2024 | |
14 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 10-Sep-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 30-May-2005 | |
2 | 3 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Sep-2024 | |
2 | 2 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 21-May-2019 | 09-Sep-2024 |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 30-May-2005 | 20-May-2019 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-May-2005 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 21-May-2019 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-May-2005 | 20-May-2019 |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 30-May-2005 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 30-May-2005 | |
7 | 1 | No interference with Geodetic Survey Station YLA33 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 30-May-2005 | |
8 | 6 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Exp 5543) dated 23 October 2006 signed by Peter Winter and retained on Department of Industry and Resources File No. 8797/02Vol01
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Work for API Management Pty Ltd E08/1294" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0978/200702
- "Programme of Work for API Management Pty Ltd on E08/1289, E08/1294" (Reg. ID 20304) dated 8 September 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Reg. ID 20570) dated 8 October 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801;
- "Programme of Work on E08/1227, E08/1289, E08/1293, E08/1294, E08/1516, E47/1141 and E47/1693" for API Management Pty Ltd (Reg ID 22407) dated 31 July 2009 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200901
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 10-Nov-2009 | |
8 | 5 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Exp 5543) dated 23 October 2006 signed by Peter Winter and retained on Department of Industry and Resources File No. 8797/02Vol01
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Work for API Management Pty Ltd E08/1294" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0978/200702
- "Programme of Work for API Management Pty Ltd on E08/1289, E08/1294" (Reg. ID 20304) dated 8 September 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Reg. ID 20570) dated 8 October 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 04-Dec-2008 | 09-Nov-2009 |
8 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Exp 5543) dated 23 October 2006 signed by Peter Winter and retained on Department of Industry and Resources File No. 8797/02Vol01
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Work for API Management Pty Ltd E08/1294" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0978/200702
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 06-Nov-2008 | 03-Dec-2008 |
8 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Exp 5543) dated 23 October 2006 signed by Peter Winter and retained on Department of Industry and Resources File No. 8797/02Vol01
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 19-Dec-2007 | 05-Nov-2008 |
8 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
- "Programme of Works for API Management Pty Ltd on E08/1294" (Exp 5543) dated 23 October 2006 signed by Peter Winter and retained on Department of Industry and Resources File No. 8797/02Vol01
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 16-Jan-2007 | 18-Dec-2007 |
8 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Ground Disturbing Approval Application for Exploration Drilling on E08/1294 and E08/1227" (EXP 4407)" dated 8 March 2006 signed by Peter Winter, and retained on Department of Industry and Resources File No. 8579/02.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 12-May-2006 | 15-Jan-2007 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 12-May-2006 | |
10 | 4 | The licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the licence in the sum of: | 19-Dec-2007 | 06-Nov-2008 |
10 | 3 | The licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the licence in the sum of: | 18-Dec-2007 | 18-Dec-2007 |
10 | 2 | The licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the licence in the sum of: | 16-Jan-2007 | 17-Dec-2007 |
10 | 1 | The licensee arranging lodgement of a Bond in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of: | 12-May-2006 | 15-Jan-2007 |
11 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 06-Nov-2008 | |
12 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Sep-2024 | |
13 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 10-Sep-2024 | |
14 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 10-Sep-2024 | |
Type | Number | Details |
Bond | 238444 | Lodged on 26 Apr 2006 For $10,000.00 (Security)RECORDED 26 Apr 2006RETIRED 28 Mar 2007 |
Bond | 252326 | Lodged on 06 Dec 2006 For $28,000.00 (Unconditional Performance Bond)RECORDED 06 Dec 2006RETIRED:09 October 2013 |
Bond | 277388 | Lodged on 05 Nov 2007 For $8,000.00 (Unconditional Performance Bond)REJECTED 05 Nov 2007RELODGED 13 Nov 2007RECORDED 13 Nov 2007RETIRED:09 July 2013 |
Bond | 245864 | Lodged on 14 Nov 2007 For $8,000.00REJECTED 14 Nov 2007 |
Bond | 278538 | Lodged on 23 Nov 2007 For $6,500.00 (Unconditional Performance Bond)RECORDED 23 Nov 2007RETIRED:09 October 2013 |
Plaint | KR7/078 | Lodged 12:15 PM on 24 Apr 2008 by RED HILL IRON LTD and API MANAGEMENT PTY LTDRECORDED 12:15 PM 24 Apr 2008WITHDRAWN 11 Sep 2008 |
Exemption from Drop-off | 291487 | Lodged 3:50:00 PM on 21 May 2008 applying for relief from the provisions of Section 65(1)(a)GRANTED 19 Jun 2008 |
Bond | 293326 | Lodged on 16 Jun 2008 For $5,500.00 (Unconditional Performance Bond)RECORDED 16 Jun 2008RETIRED:09 October 2013 |
Bond | 301737 | Lodged 4:30 PM on 14 Oct 2008 For $7,000.00 (Unconditional Performance Bond)RECORDED 4:30 PM 14 Oct 2008RETIRED:09 October 2013 |
Bond | 304231 | Lodged 3:30 PM on 14 Nov 2008 For $10,000.00 (Unconditional Performance Bond)RECORDED 3:30 PM 14 Nov 2008RETIRED:09 October 2013 |
Bond Requirement | 307538 | Requirement Date:04/12/2008Amount:$65,000.00RECORDED:14:35:58 05 December 2008FINALISED:00:00 10 November 2009 |
Exemption from Drop-off | 321436 | Lodged:16:15 21 May 2009applying for relief from the provisions of Section 65(1)(b)RECORDED:16:15 21 May 2009GRANTED:23 June 2009 |
Excess Tonnage | 326937 | Lodged:08:30 31 July 2009Applying for the extraction of an additional 2,500 tonnes.RECORDED:08:30 31 July 2009GRANTED:14:32:43 14 August 2009 |
Caveat | 328744 | Lodged:14:51 26 August 2009Caveat Type:Absolute CaveatCaveator:API MANAGEMENT PTY LTD
AQUILA STEEL PTY LTD
AMCI (IO) PTY LTDShares Caveated:100/100 shares RED HILL IRON LIMITEDRECORDED:14:51 26 August 2009Affected Dealing:Transfer 43108214 day notice sent:18 September 2013Affected Dealing:Mortgage 43113414 day notice sent:18 September 2013Affected Dealing:Mortgage 43113514 day notice sent:18 September 2013Order under Section 122E(1)(c) that Caveat 328744 remain in full force and effect upon expiry of 14 day notice, signed Warden Tavener 2 October 2013. |
Bond | 333139 | Lodged:16:25 26 October 2009Bond Type:Unconditional Performance BondBond Amount:$28,000.00RECORDED:26 October 2009RETIRED:09 October 2013 |
Bond Requirement | 334158 | Requirement Date:10/11/2009Amount:$85,000.00RECORDED:10:50:07 09 July 2013FINALISED:13:20:47 06 March 2014 |
Application to Amend | 339601 | Lodged:15:29 28 January 2010Amending:AddressFrom:RED HILL IRON LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638, PERTH BUSINESS CENTRE, WA, 6849To:RED HILL IRON LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:15:29 28 January 2010 |
Extension / Renewal of Term | 347273 | Lodged:13:27 21 May 2010Applied For Period:2 YearsRECORDED:13:27 21 May 2010GRANTED:27 May 2010Granted Period:2 YearsTerm Extended To:29/05/2012 |
Application to Amend | 349952 | Lodged:14:10 29 June 2010Amending:AddressFrom:RED HILL IRON LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:RED HILL IRON LTD, C/- API MANAGEMENT PTY LTD, LEVEL 2: AQUILA CENTRE, 1 PRESTON ST COMO, WA, 6157RECORDED:14:10 29 June 2010 |
Conversion | 384466 | New Tenement:M 08/483-IApplication Date:15:50 31 Oct 2011Section:S67Converted 00:00 22 October 2015 being commencement of term of M 08/483-I |
Conversion | 384468 | New Tenement:M 08/484-IApplication Date:15:50 31 Oct 2011Section:S67Converted 00:00 22 October 2015 being commencement of term of M 08/484-I |
Extension / Renewal of Term | 398061 | Lodged:09:55 23 May 2012Applied For Period:2 YearsRECORDED:09:55 23 May 2012GRANTED:31 May 2012Granted Period:2 YearsTerm Extended To:29/05/2014 |
Mortgage | 431134 | Lodged:14:35 11 September 2013Mortgaged Shares:40/100 shares RED HILL IRON LIMITEDMortgagee:API MANAGEMENT PTY LTDREGISTERED:09:30 02 October 2013 |
Bond | 431123 | Lodged:16:00 11 September 2013Bond Type:Unconditional Performance BondBond Amount:$85,000.00RECORDED:11 September 2013RETIRED - MRF:06 March 2014 |
Mortgage | 431135 | Lodged:14:35 11 September 2013REJECTED:14:35 11 September 2013Relodged:09:30 02 October 2013Mortgaged Shares:60/100 shares API MANAGEMENT PTY LTDMortgagee:RED HILL IRON LIMITEDREGISTERED:09:30 02 October 2013 |
Extension / Renewal of Term | 446827 | Lodged:14:40 21 May 2014Applied For Period:1 YearsRECORDED:14:40 21 May 2014GRANTED:03 June 2014Granted Period:1 YearsTerm Extended To:29/05/2015 |
Application to Amend | 453057 | Lodged:10:20 15 August 2014Amending:AddressFrom:API MANAGEMENT PTY LTD, LEVEL 2 AQUILA CENTRE, 1 PRESTON STREET, COMO, WA, 6152To:API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON STREET, COMO, WA, 6152RECORDED:10:20 15 August 2014 |
Application to Amend | 453421 | Lodged:12:00 22 August 2014Amending:AddressFrom:RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 2: AQUILA CENTRE, 1 PRESTON ST COMO, WA, 6157To:RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON ST COMO, WA, 6152RECORDED:12:00 22 August 2014 |
Caveat | 456061 | Lodged:15:35 10 October 2014Caveat Type:Absolute CaveatCaveator:RED HILL IRON LIMITEDShares Caveated:60/100 shares API MANAGEMENT PTY LTDRECORDED:15:35 10 October 2014 |
Extension / Renewal of Term | 467817 | Lodged:09:02:33 20 May 2015Applied For Period:1 YearsRECORDED:09:02:33 20 May 2015GRANTED:23 July 2015Granted Period:1 YearsTerm Extended To:29/05/2016 |
Conversion | 474403 | New Tenement:G 08/86Application Date:14:00 11 Sep 2015Section:S67 |
Expiry - Partial | 476818 | Expired Land:Area of land contained within M08/484Retained Blocks:HAMERSLEY RANGE 1610 c, d, h, j, m, n, o, r, s, t, w, x, y
HAMERSLEY RANGE 1682 g, h, j, m, n, o, p, s, t, u, y, z
HAMERSLEY RANGE 1683 q, v, w
HAMERSLEY RANGE 1754 e
HAMERSLEY RANGE 1755 a, b, f, g, mRetained Total:34 BL.EFFECTIVE:00:00 22 October 2015 |
Extension / Renewal of Term | 487150 | Lodged:11:46:29 23 May 2016Applied For Period:1 YearsRECORDED:11:46:29 23 May 2016GRANTED:10 August 2016Granted Period:1 YearsTerm Extended To:29/05/2017 |
Extension / Renewal of Term | 507112 | Lodged:16:28:26 26 May 2017Applied For Period:1 YearsRECORDED:16:28:26 26 May 2017GRANTED:15 August 2017Granted Period:1 YearsTerm Extended To:29/05/2018 |
Application to Amend | 521641 | Lodged:08:30 15 January 2018Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, SAME AS CORRESPONDENCE and DTC :API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON STREET, COMO, WA, 6152To:Principal Place of Business : API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :API MANAGEMENT PTY LTD, GREG WALKER, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222RECORDED:08:30 15 January 2018 |
Application to Amend | 522048 | Lodged:11:29:43 22 January 2018Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, SAME AS CORRESPONDENCE and DTC :RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON ST COMO, WA, 6152To:Principal Place of Business : RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :RED HILL IRON LIMITED, C/ - API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222From:API MANAGEMENT PTY LTD, GREG WALKER, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222RECORDED:11:29:43 22 January 2018 |
Application to Amend | 522065 | Lodged:12:06:04 22 January 2018Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxxxxxxx222RECORDED:12:06:04 22 January 2018 |
Excess Tonnage | 522281 | Lodged:09:01:54 25 January 2018RECORDED:09:01:54 25 January 2018GRANTED:11:52:19 31 January 2018Additional 3,600 tonnes |
Extension / Renewal of Term | 530645 | Lodged:11:15:08 18 May 2018Applied For Period:1 YearsRECORDED:11:15:08 18 May 2018GRANTED:30 July 2018Granted Period:1 YearsTerm Extended To:29/05/2019 |
Extension / Renewal of Term | 554402 | Lodged:08:30 23 May 2019Applied For Period:1 YearsRECORDED:08:30 23 May 2019GRANTED:23 July 2019Granted Period:1 YearsTerm Extended To:29/05/2020 |
Extension / Renewal of Term | 578510 | Lodged:15:31:10 21 May 2020Applied For Period:1 YearsRECORDED:15:31:10 21 May 2020GRANTED:29 June 2020Granted Period:1 YearsTerm Extended To:29/05/2021 |
Extension / Renewal of Term | 622078 | Lodged:12:09:45 10 May 2021Applied For Period:1 YearsRECORDED:12:09:45 10 May 2021GRANTED:31 May 2021Granted Period:1 YearsTerm Extended To:29/05/2022 |
Caveat | 631947 | Lodged:08:30 08 September 2021Caveat Type:Consent CaveatCaveator:A.C.N. 649 012 395 PTY LTDShares Caveated:40/100 shares RED HILL IRON LIMITEDRECORDED:08:30 08 September 2021 |
Excess Tonnage | 637190 | Lodged:13:32:02 08 December 2021RECORDED:13:32:02 08 December 2021GRANTED:16:07 02 March 2022Additional 22.5 tonnes |
Excess Tonnage | 641965 | Lodged:13:07:20 22 February 2022RECORDED:13:07:20 22 February 2022WITHDRAWN:15:44 08 June 2022 |
Application to Amend | 642634 | Lodged:15:59:24 03 March 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :RED HILL IRON LIMITED, C/ - API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:Principal Place of Business : RED HILL IRON LIMITED, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:15:59:24 03 March 2022 |
Application to Amend | 644795 | Lodged:10:14:18 16 March 2022Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, 1SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:10:14:18 16 March 2022 |
Application to Amend | 644796 | Lodged:10:14:18 16 March 2022Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, 1SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxxxxxxx222To:Principal Place of Business : API MANAGEMENT PTY LTD, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:10:14:18 16 March 2022 |
Extension / Renewal of Term | 649578 | Lodged:09:59:28 18 May 2022Applied For Period:1 YearsRECORDED:09:59:28 18 May 2022GRANTED:31 May 2022Granted Period:1 YearsTerm Extended To:29/05/2023 |
Extension / Renewal of Term | 649582 | Lodged:10:05:37 18 May 2022Applied For Period:1 YearsRECORDED:10:05:37 18 May 2022LAPSED:31 May 2022 |
Application to Amend | 664619 | Lodged:14:47:21 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600To:Principal Place of Business : API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:14:47:21 02 December 2022 |
Application to Amend | 664622 | Lodged:14:56:48 02 December 2022Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600To:API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/-RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:14:56:48 02 December 2022 |
Application to Amend | 664637 | Lodged:15:32:15 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600To:Principal Place of Business : RED HILL IRON LIMITED, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, 20 WALTERS DRIVE, OSBORNE PARK, WA, 6017, xxxxxxxxx@mrl.com.au, xxxxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxxxx600RECORDED:15:32:15 02 December 2022 |
Application to Amend | 664643 | Lodged:15:36:01 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, 20 WALTERS DRIVE, OSBORNE PARK, WA, 6017, xxxxxxxxx@mrl.com.au, xxxxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxxxx600To:Principal Place of Business : RED HILL IRON LIMITED, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, 20 WALTERS DRIVE, OSBORNE PARK, WA, 6017, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, C/- REDHILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxxxx600RECORDED:15:36:01 02 December 2022 |
Extension / Renewal of Term | 676779 | Lodged:12:50:23 24 May 2023Applied For Period:1 YearsRECORDED:12:50:23 24 May 2023GRANTED:05 September 2023Granted Period:1 YearsTerm Extended To:29/05/2024 |
Extension / Renewal of Term | 704909 | Lodged:13:35:58 24 May 2024Applied For Period:1 YearsRECORDED:13:35:58 24 May 2024GRANTED:23 July 2024Granted Period:1 YearsTerm Extended To:29/05/2025 |
Application to Amend | 707845 | Lodged:14:55 26 June 2024Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222To:API MANAGEMENT PTY LTD, LEVEL 18, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222RECORDED:14:55 26 June 2024 |
Excess Tonnage | 713268 | Lodged:16:43 23 August 2024RECORDED:16:43 23 August 2024Approved Additional Tonnes:30GRANTED:16:43:23 29 August 2024 |
Extension / Renewal of Term | 734446 | Lodged:12:28:08 27 May 2025Applied For Period:1 YearsRECORDED:12:28:08 27 May 2025 |
Caveat | 737112 | Lodged:16:05 30 June 2025PENDING |
Caveat | 737128 | Lodged:16:05 30 June 2025PENDING |