1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 19-Oct-2005 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 19-Oct-2005 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Oct-2005 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Oct-2005 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Oct-2005 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Oct-2005 | |
7 | 1 | No interference with Geodetic Survey Station YLA 85, YLA 86, YLA 96 and B28 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 19-Oct-2005 | |
8 | 1 | No mining within 25 metres of either side of the Goldfields Gas pipeline. | 19-Oct-2005 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer. | 19-Oct-2005 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 19-Oct-2005 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer. | 19-Oct-2005 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer. | 19-Oct-2005 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer. | 19-Oct-2005 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 19-Oct-2005 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister for State Development for the purpose of protecting the Gas pipeline. | 19-Oct-2005 | |
| 1 | Consent to mine on Stock Route Reserve 9701 granted, subject to: | 19-Oct-2005 | |
16 | 1 | No mining operations being carried out on Stock Route Reserve 9701 which restrict the use of the reserve. | 19-Oct-2005 | |
17 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E08/1227, E08/1289, E08/1293, E08/1294, E08/1516, E47/1141 and E47/1693" for API Management Pty Ltd (Reg ID 22407) dated 31 July 2009 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200901.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 10-Nov-2009 | |
18 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 10-Nov-2009 | |
19 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 10-Nov-2009 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 19-Oct-2005 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 19-Oct-2005 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Oct-2005 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Oct-2005 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Oct-2005 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Oct-2005 | |
7 | 1 | No interference with Geodetic Survey Station YLA 85, YLA 86, YLA 96 and B28 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 19-Oct-2005 | |
8 | 1 | No mining within 25 metres of either side of the Goldfields Gas pipeline. | 19-Oct-2005 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer. | 19-Oct-2005 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 19-Oct-2005 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer. | 19-Oct-2005 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer. | 19-Oct-2005 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer. | 19-Oct-2005 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 19-Oct-2005 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister for State Development for the purpose of protecting the Gas pipeline. | 19-Oct-2005 | |
| 1 | Consent to mine on Stock Route Reserve 9701 granted, subject to: | 19-Oct-2005 | |
16 | 1 | No mining operations being carried out on Stock Route Reserve 9701 which restrict the use of the reserve. | 19-Oct-2005 | |
17 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E08/1227, E08/1289, E08/1293, E08/1294, E08/1516, E47/1141 and E47/1693" for API Management Pty Ltd (Reg ID 22407) dated 31 July 2009 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200901.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 10-Nov-2009 | |
18 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 10-Nov-2009 | |
19 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 10-Nov-2009 | |
Type | Number | Details |
Exemption from Drop-off | 302039 | Lodged 3:15 PM on 17 Oct 2008 applying for relief from the provisions of Section 65(1)(a)RECORDED 3:15 PM on 17 Oct 2008GRANTED:05 March 2009 |
Caveat | 328743 | Lodged:14:51 26 August 2009Caveat Type:Absolute CaveatCaveator:API MANAGEMENT PTY LTD
AQUILA STEEL PTY LTD
AMCI (IO) PTY LTDShares Caveated:100/100 shares RED HILL IRON LIMITEDRECORDED:14:51 26 August 2009Re: Transfer 449755 and Mortgages 431134-431135 By order of Warden Tavener pursuant to under s122D(1) Transfer and Mortgages may be registered while Caveat remains in force. |
Exemption from Drop-off | 332727 | Lodged:15:58 16 October 2009For relief from the provisions of Section 65(1)(b)RECORDED:15:58 16 October 2009GRANTED:20 October 2009 |
Bond | 333138 | Lodged:16:25 26 October 2009Bond Type:Unconditional Performance BondBond Amount:$24,000.00RECORDED:26 October 2009RETIRED - MRF:06 March 2014 |
Bond Requirement | 334155 | Requirement Date:09/11/2009Amount:$24,000.00RECORDED:10:42:44 10 November 2009FINALISED:11:35:06 06 March 2014 |
Extension of Time | 337347 | Lodged:11:12 17 December 2009Type:Form 5RECORDED:11:12 17 December 2009Extension of time until 22 December 2009 to lodge Form 5 for the year ending 18 October 2009 approvedAPPROVED:11:07:50 21 December 2009 |
Application to Amend | 339601 | Lodged:15:29 28 January 2010Amending:AddressFrom:RED HILL IRON LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638, PERTH BUSINESS CENTRE, WA, 6849To:RED HILL IRON LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:15:29 28 January 2010 |
Application to Amend | 349952 | Lodged:14:10 29 June 2010Amending:AddressFrom:RED HILL IRON LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:RED HILL IRON LTD, C/- API MANAGEMENT PTY LTD, LEVEL 2: AQUILA CENTRE, 1 PRESTON ST COMO, WA, 6157RECORDED:14:10 29 June 2010 |
Extension / Renewal of Term | 357604 | Lodged:11:40 18 October 2010Applied For Period:2 YearsRECORDED:11:40 18 October 2010GRANTED:27 October 2010Granted Period:2 YearsTerm Extended To:18/10/2012 |
Extension / Renewal of Term | 408323 | Lodged:13:30 17 October 2012Applied For Period:2 YearsRECORDED:13:30 17 October 2012GRANTED:05 November 2012Granted Period:2 YearsTerm Extended To:18/10/2014 |
Conversion | 417981 | New Tenement:M 08/501Application Date:15:15 27 Feb 2013Section:S67Converted 00:00 07 April 2014 being commencement of term of M 08/501 |
Mortgage | 431135 | Lodged:10:55:01 27 June 2014Mortgaged Shares:60/100 shares API MANAGEMENT PTY LTDMortgagee:RED HILL IRON LIMITEDREGISTERED:10:30 03 July 2014 |
Mortgage | 431134 | Lodged:10:55:01 27 June 2014Mortgaged Shares:40/100 shares RED HILL IRON LIMITEDMortgagee:API MANAGEMENT PTY LTDREGISTERED:10:30 03 July 2014 |
Application to Amend | 453057 | Lodged:10:20 15 August 2014Amending:AddressFrom:API MANAGEMENT PTY LTD, LEVEL 2 AQUILA CENTRE, 1 PRESTON STREET, COMO, WA, 6152To:API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON STREET, COMO, WA, 6152RECORDED:10:20 15 August 2014 |
Application to Amend | 453421 | Lodged:12:00 22 August 2014Amending:AddressFrom:RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 2: AQUILA CENTRE, 1 PRESTON ST COMO, WA, 6157To:RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON ST COMO, WA, 6152RECORDED:12:00 22 August 2014 |
Caveat | 456060 | Lodged:15:35 10 October 2014Caveat Type:Absolute CaveatCaveator:RED HILL IRON LIMITEDShares Caveated:60/100 shares API MANAGEMENT PTY LTDRECORDED:15:35 10 October 2014 |
Extension / Renewal of Term | 456172 | Lodged:12:50:55 14 October 2014Applied For Period:1 YearsRECORDED:12:50:55 14 October 2014GRANTED:23 December 2014Granted Period:1 YearsTerm Extended To:18/10/2015 |
Extension / Renewal of Term | 475888 | Lodged:09:31:27 14 October 2015Applied For Period:1 YearsRECORDED:09:31:27 14 October 2015GRANTED:14 December 2015Granted Period:1 YearsTerm Extended To:18/10/2016 |
Extension / Renewal of Term | 495669 | Lodged:14:56:28 17 October 2016Applied For Period:1 YearsRECORDED:14:56:28 17 October 2016GRANTED:19 December 2016Granted Period:1 YearsTerm Extended To:18/10/2017 |
Extension / Renewal of Term | 516395 | Lodged:15:40:59 13 October 2017Applied For Period:1 YearsRECORDED:15:40:59 13 October 2017GRANTED:18 December 2017Granted Period:1 YearsTerm Extended To:18/10/2018 |
Application to Amend | 521641 | Lodged:08:30 15 January 2018Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, SAME AS CORRESPONDENCE and DTC :API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON STREET, COMO, WA, 6152To:Principal Place of Business : API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :API MANAGEMENT PTY LTD, GREG WALKER, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222RECORDED:08:30 15 January 2018 |
Application to Amend | 522048 | Lodged:11:29:43 22 January 2018Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, SAME AS CORRESPONDENCE and DTC :RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON ST COMO, WA, 6152To:Principal Place of Business : RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222From:API MANAGEMENT PTY LTD, GREG WALKER, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222RECORDED:11:29:43 22 January 2018 |
Application to Amend | 522065 | Lodged:12:06:04 22 January 2018Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxxxxxxx222RECORDED:12:06:04 22 January 2018 |
Extension / Renewal of Term | 540017 | Lodged:16:05:03 03 October 2018Applied For Period:1 YearsRECORDED:16:05:03 03 October 2018GRANTED:13 November 2018Granted Period:1 YearsTerm Extended To:18/10/2019 |
Extension / Renewal of Term | 564418 | Lodged:11:31:15 09 October 2019Applied For Period:1 YearsRECORDED:11:31:15 09 October 2019GRANTED:21 November 2019Granted Period:1 YearsTerm Extended To:18/10/2020 |
Extension / Renewal of Term | 588439 | Lodged:13:57:47 16 October 2020Applied For Period:1 YearsRECORDED:13:57:47 16 October 2020GRANTED:18 December 2020Granted Period:1 YearsTerm Extended To:18/10/2021 |
Caveat | 631946 | Lodged:08:30 08 September 2021Caveat Type:Consent CaveatCaveator:A.C.N. 649 012 395 PTY LTDShares Caveated:40/100 shares RED HILL IRON LIMITEDRECORDED:08:30 08 September 2021 |
Extension / Renewal of Term | 634171 | Lodged:09:13:57 15 October 2021Applied For Period:1 YearsRECORDED:09:13:57 15 October 2021GRANTED:17 December 2021Granted Period:1 YearsTerm Extended To:18/10/2022 |
Application to Amend | 642634 | Lodged:15:59:24 03 March 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:Principal Place of Business : RED HILL IRON LIMITED, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:15:59:24 03 March 2022 |
Application to Amend | 644795 | Lodged:10:14:18 16 March 2022Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, 1SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:10:14:18 16 March 2022 |
Application to Amend | 644796 | Lodged:10:14:18 16 March 2022Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, 1SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxxxxxxx222To:Principal Place of Business : API MANAGEMENT PTY LTD, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:10:14:18 16 March 2022 |
Extension / Renewal of Term | 660939 | Lodged:13:02:47 12 October 2022Applied For Period:1 YearsRECORDED:13:02:47 12 October 2022GRANTED:25 January 2023Granted Period:1 YearsTerm Extended To:18/10/2023 |
Application to Amend | 664619 | Lodged:14:47:21 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600To:Principal Place of Business : API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:14:47:21 02 December 2022 |
Application to Amend | 664622 | Lodged:14:56:48 02 December 2022Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600To:API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/-RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:14:56:48 02 December 2022 |
Application to Amend | 664637 | Lodged:15:32:15 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600To:Principal Place of Business : RED HILL IRON LIMITED, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, 20 WALTERS DRIVE, OSBORNE PARK, WA, 6017, xxxxxxxxx@mrl.com.au, xxxxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxxxx600RECORDED:15:32:15 02 December 2022 |
Application to Amend | 664643 | Lodged:15:36:01 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, 20 WALTERS DRIVE, OSBORNE PARK, WA, 6017, xxxxxxxxx@mrl.com.au, xxxxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxxxx600To:Principal Place of Business : RED HILL IRON LIMITED, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, 20 WALTERS DRIVE, OSBORNE PARK, WA, 6017, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, C/- REDHILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxxxx600RECORDED:15:36:01 02 December 2022 |
Extension / Renewal of Term | 688057 | Lodged:13:08:40 18 October 2023Applied For Period:1 YearsRECORDED:13:08:40 18 October 2023GRANTED:22 December 2023Granted Period:1 YearsTerm Extended To:18/10/2024 |
Application to Amend | 707845 | Lodged:14:55 26 June 2024Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222To:API MANAGEMENT PTY LTD, LEVEL 18, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222RECORDED:14:55 26 June 2024 |
Extension / Renewal of Term | 716936 | Lodged:12:59:12 15 October 2024Applied For Period:1 YearsRECORDED:12:59:12 15 October 2024GRANTED:18 December 2024Granted Period:1 YearsTerm Extended To:18/10/2025 |
Caveat | 737111 | Lodged:16:05 30 June 2025PENDING |