Extracted from MTO on 11-Jul-2025 00:37,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 05-Jun-2003 | |
2 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 05-Jun-2003 | 11-Aug-2005 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Jun-2003 | |
4 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
4 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Jun-2003 | 11-Aug-2005 |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Jun-2003 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Jun-2003 | |
7 | 1 | No interference with Geodetic Survey Stations PW 3, Stuart and WYLOO 11 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 05-Jun-2003 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 05-Jun-2003 | |
9 | 1 | No mining within 25 metres of either side of the Goldfields Gas/Petroleum pipeline (contained within FNA 3912 as shown in TENGRAPH). | 05-Jun-2003 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer. | 05-Jun-2003 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 05-Jun-2003 | |
12 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer. | 05-Jun-2003 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer. | 05-Jun-2003 | |
14 | 1 | Mining on the Safety Zone established in Condition 13 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer. | 05-Jun-2003 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 13 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 05-Jun-2003 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister for State Development for the purpose of protecting the Gas/Petroleum pipeline. | 05-Jun-2003 | |
| 1 | Consent to mine on De Grey-Mullewa Stock Route Reserve 9701 granted subject to: | 05-Jun-2003 | |
17 | 1 | No mining operations being carried out on De Grey-Mullewa Stock Route Reserve 9701 which restrict the use of the reserve. | 05-Jun-2003 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 05-Jun-2003 | |
2 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 05-Jun-2003 | 11-Aug-2005 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Jun-2003 | |
4 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
4 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Jun-2003 | 11-Aug-2005 |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Jun-2003 | |
6 | 1 | The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Jun-2003 | |
7 | 1 | No interference with Geodetic Survey Stations PW 3, Stuart and WYLOO 11 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 05-Jun-2003 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 05-Jun-2003 | |
9 | 1 | No mining within 25 metres of either side of the Goldfields Gas/Petroleum pipeline (contained within FNA 3912 as shown in TENGRAPH). | 05-Jun-2003 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer. | 05-Jun-2003 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 05-Jun-2003 | |
12 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer. | 05-Jun-2003 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer. | 05-Jun-2003 | |
14 | 1 | Mining on the Safety Zone established in Condition 13 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer. | 05-Jun-2003 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 13 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 05-Jun-2003 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister for State Development for the purpose of protecting the Gas/Petroleum pipeline. | 05-Jun-2003 | |
| 1 | Consent to mine on De Grey-Mullewa Stock Route Reserve 9701 granted subject to: | 05-Jun-2003 | |
17 | 1 | No mining operations being carried out on De Grey-Mullewa Stock Route Reserve 9701 which restrict the use of the reserve. | 05-Jun-2003 | |
Type | Number | Details |
Extension of Time | 222510 | Lodged 10:10 AM on 18 Aug 2005 to lodge late statutory declaration for Exemption from ExpenditureApproved by the Warden on 24 Aug 2005 |
Fine | 237633 | Penalty of $1,822 imposed pursuant to section 96A(5) for non-compliance with the expenditure requirements.
Date Due: 11 May 2006 Date Paid: 18 Apr 2006RECORDED 11 Apr 2006Penalty amount:$1,822.00Notification date:11/04/2006Due date:11/05/2006Pursuant to:Section 96A(5)RECORDED:11 April 2006PAYMENT RECEIVED:18 April 2006FINALISED:18 April 2006Receipt Number:23290Amount:$1,822.00 |
Exemption from Drop-off | 306H/056 | Lodged 3:55:00 PM on 26 May 2006 applying for relief from the provisions of Section 65(1)(a)GRANTED 20 Nov 2006 |
Exemption from Drop-off | 357H/067 | Lodged 4:00:00 PM on 01 Jun 2007 applying for relief from the provisions of Section 65(1)(b)GRANTED 05 Sep 2007 |
Plaint | KR6/078 | Lodged 12:15 PM on 24 Apr 2008 by CULLEN EXPLORATION PTY LTD, RED HILL IRON LTD and API MANAGEMENT PTY LTDRECORDED 12:15 PM 24 Apr 2008WITHDRAWN 11 Sep 2008 |
Extension / Renewal of Term | 292307 | Lodged 3:55:00 PM on 03 Jun 2008 applied for a period of 2 YearsRECORDED 3:55 PM 03 Jun 2008Granted Period:2 YearsTerm Extended To:04/06/2010GRANTED:30 January 2009 |
Caveat | 328755 | Lodged:14:51 26 August 2009Caveat Type:Absolute CaveatCaveator:API MANAGEMENT PTY LTD
AQUILA STEEL PTY LTD
AMCI (IO) PTY LTDShares Caveated:100/100 shares CULLEN EXPLORATION PTY LIMITEDRECORDED:14:51 26 August 2009WITHDRAWN:16:28:35 24 May 2017 |
Extension / Renewal of Term | 347925 | Lodged:15:54 01 June 2010Applied For Period:2 YearsRECORDED:15:54 01 June 2010GRANTED:16 June 2010Granted Period:2 YearsTerm Extended To:04/06/2012 |
Application to Amend | 245716 | Lodged:11:31 20 September 2011Amending:AddressFrom:CULLEN EXPLORATION PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:CULLEN EXPLORATION PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931RECORDED:11:31 20 September 2011 |
Extension / Renewal of Term | 398597 | Lodged:15:35 31 May 2012Applied For Period:1 YearsRECORDED:15:35 31 May 2012GRANTED:07 August 2012Granted Period:1 YearsTerm Extended To:04/06/2013 |
Extension / Renewal of Term | 424239 | Lodged:15:45 30 May 2013Applied For Period:1 YearsRECORDED:15:45 30 May 2013GRANTED:05 August 2013Granted Period:1 YearsTerm Extended To:04/06/2014 |
Extension / Renewal of Term | 447464 | Lodged:15:40 28 May 2014Applied For Period:1 YearsRECORDED:15:40 28 May 2014GRANTED:28 July 2014Granted Period:1 YearsTerm Extended To:04/06/2015 |
Extension / Renewal of Term | 468316 | Lodged:15:15 28 May 2015Applied For Period:1 YearsRECORDED:15:15 28 May 2015GRANTED:04 August 2015Granted Period:1 YearsTerm Extended To:04/06/2016 |
Extension / Renewal of Term | 487808 | Lodged:15:52 02 June 2016Applied For Period:1 YearsRECORDED:15:52 02 June 2016GRANTED:20 October 2016Granted Period:1 YearsTerm Extended To:04/06/2017 |
Withdrawal of Dealing | 506955 | Lodged:16:28:35 24 May 2017In respect to:Caveat 328755RECORDED:16:28:35 24 May 2017 |
Partial Surrender - Voluntary | 506959 | Lodged:08:30 25 May 2017Surrendered Blocks:HAMERSLEY RANGE 2040 c, d, e, h, j, k, o, p
HAMERSLEY RANGE 2041 a, f
HAMERSLEY RANGE 2114 a, b, f, gSurrendered Total:14 BL.REGISTERED:08:30 25 May 2017 |
Extension / Renewal of Term | 507454 | Lodged:16:28:28 01 June 2017Applied For Period:1 YearsRECORDED:16:28:28 01 June 2017GRANTED:23 November 2017Granted Period:1 YearsTerm Extended To:04/06/2018 |
Withdrawal of Dealing | 520240 | Lodged:14:50 14 December 2017In respect to:Caveat 328755REJECTED:14:50 14 December 2017 |
Application to Amend | 521641 | Lodged:08:30 15 January 2018Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON STREET, COMO, WA, 6152 and DTC :API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON STREET, COMO, WA, 6152To:Principal Place of Business : API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :API MANAGEMENT PTY LTD, GREG WALKER, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222RECORDED:08:30 15 January 2018 |
Application to Amend | 522065 | Lodged:12:06:04 22 January 2018Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, GREG WALKER, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxxxxxxx222RECORDED:12:06:04 22 January 2018 |
Excess Tonnage | 522281 | Lodged:09:01:54 25 January 2018RECORDED:09:01:54 25 January 2018GRANTED:11:48:48 31 January 2018Additional 2,500 tonnes |
Extension / Renewal of Term | 531642 | Lodged:16:12:13 31 May 2018Applied For Period:1 YearsRECORDED:16:12:13 31 May 2018GRANTED:13 August 2018Granted Period:1 YearsTerm Extended To:04/06/2019 |
Caveat | 551661 | Lodged:10:27:24 15 April 2019Caveat Type:Consent CaveatCaveator:CULLEN EXPLORATION PTY LIMITEDShares Caveated:100/100 shares API MANAGEMENT PTY LTDRECORDED:10:27:24 15 April 2019 |
Extension / Renewal of Term | 555115 | Lodged:14:04:08 31 May 2019Applied For Period:1 YearsRECORDED:14:04:08 31 May 2019GRANTED:06 August 2019Granted Period:1 YearsTerm Extended To:04/06/2020 |
Extension / Renewal of Term | 579284 | Lodged:16:05:40 03 June 2020Applied For Period:1 YearsRECORDED:16:05:40 03 June 2020GRANTED:21 July 2020Granted Period:1 YearsTerm Extended To:04/06/2021 |
Extension / Renewal of Term | 622086 | Lodged:13:13:29 10 May 2021Applied For Period:1 YearsRECORDED:13:13:29 10 May 2021GRANTED:04 August 2021Granted Period:1 YearsTerm Extended To:04/06/2022 |
Extension / Renewal of Term | 650802 | Lodged:16:08:26 02 June 2022Applied For Period:1 YearsRECORDED:16:08:26 02 June 2022GRANTED:05 August 2022Granted Period:1 YearsTerm Extended To:04/06/2023 |
Excess Tonnage | 663504 | Lodged:08:30 18 November 2022RECORDED:08:30 18 November 2022GRANTED:17:21 18 November 2022Additional 2,424 tonnes |
Extension / Renewal of Term | 677367 | Lodged:15:57:05 30 May 2023Applied For Period:1 YearsRECORDED:15:57:05 30 May 2023GRANTED:07 September 2023Granted Period:1 YearsTerm Extended To:04/06/2024 |
Application to Amend | 690423 | Lodged:10:09 21 November 2023Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, LEVEL 18, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxx222RECORDED:10:09 21 November 2023 |
Extension / Renewal of Term | 705449 | Lodged:16:05:28 30 May 2024Applied For Period:1 YearsRECORDED:16:05:28 30 May 2024GRANTED:06 August 2024Granted Period:1 YearsTerm Extended To:04/06/2025 |
Extension / Renewal of Term | 734095 | Lodged:13:23:04 22 May 2025Applied For Period:1 YearsRECORDED:13:23:04 22 May 2025 |