Extracted from MTO on 01-Jul-2025 00:37,
last changed 01-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 19-Oct-2005 | |
2 | 3 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 04-Oct-2024 | |
2 | 2 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 10-May-2019 | 03-Oct-2024 |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 19-Oct-2005 | 09-May-2019 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Oct-2005 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 10-May-2019 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Oct-2005 | 09-May-2019 |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Oct-2005 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Oct-2005 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 19-Oct-2005 | |
8 | 1 | No mining within 25 metres of either side of the Goldfields Gas pipeline. | 19-Oct-2005 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer. | 19-Oct-2005 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 19-Oct-2005 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer. | 19-Oct-2005 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer. | 19-Oct-2005 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer. | 19-Oct-2005 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 19-Oct-2005 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister for State Development for the purpose of protecting the Gas pipeline. | 19-Oct-2005 | |
| 1 | Consent to mine on Stock Route Reserve 9701 granted, subject to: | 19-Oct-2005 | |
16 | 1 | No mining operations being carried out on Stock Route Reserve 9701 which restrict the use of the reserve. | 19-Oct-2005 | |
17 | 5 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Proposal of Works for API Management Pty Ltd on E08/1289" (EXP 5254) dated 23 August 2006 and signed by Peter Winter, and retained on Department of Industry and Resources file No. 8579-02VOL01.
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Works for API Management Pty Ltd on E08/1289" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
- "Programme of Works for API Management Pty Ltd on E08/1289" (Reg. ID 20570) dated 8 October 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801;
- "Programme of Work on E08/1227, E08/1289, E08/1293, E08/1294, E08/1516, E47/1141 and E47/1693" for API Management Pty Ltd (Reg ID 22407) dated 31 July 2009 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200901
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 10-Nov-2009 | |
17 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Proposal of Works for API Management Pty Ltd on E08/1289" (EXP 5254) dated 23 August 2006 and signed by Peter Winter, and retained on Department of Industry and Resources file No. 8579-02VOL01.
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Works for API Management Pty Ltd on E08/1289" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
- "Programme of Works for API Management Pty Ltd on E08/1289" (Reg. ID 20570) dated 8 October 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 04-Dec-2008 | 09-Nov-2009 |
17 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Proposal of Works for API Management Pty Ltd on E08/1289" (EXP 5254) dated 23 August 2006 and signed by Peter Winter, and retained on Department of Industry and Resources file No. 8579-02VOL01.
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Works for API Management Pty Ltd on E08/1289" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 06-Nov-2008 | 03-Dec-2008 |
17 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Proposal of Works for API Management Pty Ltd on E08/1289" (EXP 5254) dated 23 August 2006 and signed by Peter Winter, and retained on Department of Industry and Resources file No. 8579-02VOL01.
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 19-Dec-2007 | 05-Nov-2008 |
17 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Proposal of Works for API Management Pty Ltd on E08/1289" (EXP 5254) dated 23 August 2006 and signed by Peter Winter, and retained on Department of Industry and Resources file No. 8579-02VOL01.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 20-Nov-2006 | 18-Dec-2007 |
18 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 20-Nov-2006 | |
19 | 2 | The licensee arranging lodgement of a Bond in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of: | 18-Dec-2007 | 06-Nov-2008 |
19 | 1 | The licensee arranging lodgement of a Bond in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of: | 20-Nov-2006 | 17-Dec-2007 |
20 | 1 | The Licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of: | 19-Dec-2007 | 06-Nov-2008 |
21 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 06-Nov-2008 | |
22 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 04-Oct-2024 | |
23 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 04-Oct-2024 | |
24 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 04-Oct-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 19-Oct-2005 | |
2 | 3 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 04-Oct-2024 | |
2 | 2 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 10-May-2019 | 03-Oct-2024 |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 19-Oct-2005 | 09-May-2019 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Oct-2005 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 10-May-2019 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Oct-2005 | 09-May-2019 |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Oct-2005 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Oct-2005 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 19-Oct-2005 | |
8 | 1 | No mining within 25 metres of either side of the Goldfields Gas pipeline. | 19-Oct-2005 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer. | 19-Oct-2005 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Gas pipeline. | 19-Oct-2005 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer. | 19-Oct-2005 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer. | 19-Oct-2005 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer. | 19-Oct-2005 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 19-Oct-2005 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister for State Development for the purpose of protecting the Gas pipeline. | 19-Oct-2005 | |
| 1 | Consent to mine on Stock Route Reserve 9701 granted, subject to: | 19-Oct-2005 | |
16 | 1 | No mining operations being carried out on Stock Route Reserve 9701 which restrict the use of the reserve. | 19-Oct-2005 | |
17 | 5 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Proposal of Works for API Management Pty Ltd on E08/1289" (EXP 5254) dated 23 August 2006 and signed by Peter Winter, and retained on Department of Industry and Resources file No. 8579-02VOL01.
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Works for API Management Pty Ltd on E08/1289" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
- "Programme of Works for API Management Pty Ltd on E08/1289" (Reg. ID 20570) dated 8 October 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801;
- "Programme of Work on E08/1227, E08/1289, E08/1293, E08/1294, E08/1516, E47/1141 and E47/1693" for API Management Pty Ltd (Reg ID 22407) dated 31 July 2009 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200901
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 10-Nov-2009 | |
17 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Proposal of Works for API Management Pty Ltd on E08/1289" (EXP 5254) dated 23 August 2006 and signed by Peter Winter, and retained on Department of Industry and Resources file No. 8579-02VOL01.
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Works for API Management Pty Ltd on E08/1289" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
- "Programme of Works for API Management Pty Ltd on E08/1289" (Reg. ID 20570) dated 8 October 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0714/200801.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 04-Dec-2008 | 09-Nov-2009 |
17 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Proposal of Works for API Management Pty Ltd on E08/1289" (EXP 5254) dated 23 August 2006 and signed by Peter Winter, and retained on Department of Industry and Resources file No. 8579-02VOL01.
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
- "Programme of Works for API Management Pty Ltd on E08/1289" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 06-Nov-2008 | 03-Dec-2008 |
17 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Proposal of Works for API Management Pty Ltd on E08/1289" (EXP 5254) dated 23 August 2006 and signed by Peter Winter, and retained on Department of Industry and Resources file No. 8579-02VOL01.
- "Programme of Works for RED Hill Iron Limited" on E08/1289 & E08/1294 (EXP 6893) dated 11 June 2007 signed by Jacqui Ly, and retained on Department of Industry and Resources file no. 8759-02
- "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 19-Dec-2007 | 05-Nov-2008 |
17 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Proposal of Works for API Management Pty Ltd on E08/1289" (EXP 5254) dated 23 August 2006 and signed by Peter Winter, and retained on Department of Industry and Resources file No. 8579-02VOL01.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 20-Nov-2006 | 18-Dec-2007 |
18 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 20-Nov-2006 | |
19 | 2 | The licensee arranging lodgement of a Bond in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of: | 18-Dec-2007 | 06-Nov-2008 |
19 | 1 | The licensee arranging lodgement of a Bond in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of: | 20-Nov-2006 | 17-Dec-2007 |
20 | 1 | The Licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of: | 19-Dec-2007 | 06-Nov-2008 |
21 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 06-Nov-2008 | |
22 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 04-Oct-2024 | |
23 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 04-Oct-2024 | |
24 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 04-Oct-2024 | |
Type | Number | Details |
Bond | 250547 | Lodged on 03 Nov 2006 For $10,000.00 (Security)RECORDED 03 Nov 2006RETIRED 28 Dec 2007 |
Bond | 277387 | Lodged on 05 Nov 2007 For $24,000.00 (Unconditional Performance Bond)REJECTED 05 Nov 2007RELODGED 13 Nov 2007RECORDED 13 Nov 2007RETIRED:09 July 2013 |
Bond | 225285 | Lodged on 14 Nov 2007 For $24,000.00REJECTED 14 Nov 2007 |
Bond | 278537 | Lodged on 23 Nov 2007 For $2,000.00 (Unconditional Performance Bond)RECORDED 23 Nov 2007RETIRED:09 October 2013 |
Plaint | KR5/078 | Lodged 12:15 PM on 24 Apr 2008 by RED HILL IRON LTD and API MANAGEMENT PTY LTDRECORDED 12:15 PM 24 Apr 2008WITHDRAWN 11 Sep 2008 |
Bond | 293325 | Lodged on 16 Jun 2008 For $3,500.00 (Unconditional Performance Bond)RECORDED 16 Jun 2008RETIRED:09 October 2013 |
Exemption from Drop-off | 302040 | Lodged 3:15 PM on 17 Oct 2008 applying for relief from the provisions of Section 65(1)(a)RECORDED:15:15 17 October 2008GRANTED:12 March 2009 |
Bond | 304230 | Lodged 3:30 PM on 14 Nov 2008 For $20,000.00 (Unconditional Performance Bond)RECORDED 3:30 PM 14 Nov 2008RETIRED:09 October 2013 |
Bond Requirement | 307537 | Requirement Date:05/12/2008Amount:$49,500.00RECORDED:14:33:41 05 December 2008FINALISED:00:00 10 November 2009 |
Caveat | 328742 | Lodged:14:51 26 August 2009Caveat Type:Absolute CaveatCaveator:API MANAGEMENT PTY LTD
AQUILA STEEL PTY LTD
AMCI (IO) PTY LTDShares Caveated:100/100 shares RED HILL IRON LIMITEDRECORDED:14:51 26 August 2009Affected Dealing:Transfer 43108114 day notice sent:18 September 2013Affected Dealing:Mortgage 43113414 day notice sent:18 September 2013Affected Dealing:Mortgage 43113514 day notice sent:18 September 2013Order under Section 122E(1)(c) that Caveat 328742 remain in full force and effect upon expiry of 14 day notice, signed Warden Tavener 2 October 2013. |
Exemption from Drop-off | 332728 | Lodged:15:58 16 October 2009For relief from the provisions of Section 65(1)(b)RECORDED:15:58 16 October 2009GRANTED:20 October 2009 |
Bond | 333137 | Lodged:16:25 26 October 2009Bond Type:Unconditional Performance BondBond Amount:$17,500.00RECORDED:26 October 2009RETIRED:09 October 2013 |
Bond Requirement | 334153 | Requirement Date:10/11/2009Amount:$43,000.00RECORDED:10:33:57 09 July 2013FINALISED:13:20:06 06 March 2014 |
Extension of Time | 337347 | Lodged:11:12 17 December 2009Type:Form 5RECORDED:11:12 17 December 2009Extension of time until 22 December 2009 to lodge Form 5 for the year ending 18 October 2009 approvedAPPROVED:11:07:50 21 December 2009 |
Application to Amend | 339601 | Lodged:15:29 28 January 2010Amending:AddressFrom:RED HILL IRON LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638, PERTH BUSINESS CENTRE, WA, 6849To:RED HILL IRON LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:15:29 28 January 2010 |
Application to Amend | 349952 | Lodged:14:10 29 June 2010Amending:AddressFrom:RED HILL IRON LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:RED HILL IRON LTD, C/- API MANAGEMENT PTY LTD, LEVEL 2: AQUILA CENTRE, 1 PRESTON ST COMO, WA, 6157RECORDED:14:10 29 June 2010 |
Extension / Renewal of Term | 357605 | Lodged:11:40 18 October 2010Applied For Period:2 YearsRECORDED:11:40 18 October 2010GRANTED:27 October 2010Granted Period:2 YearsTerm Extended To:18/10/2012 |
Conversion | 384466 | New Tenement:M 08/483-IApplication Date:15:50 31 Oct 2011Section:S67Converted 00:00 22 October 2015 being commencement of term of M 08/483-I |
Conversion | 384468 | New Tenement:M 08/484-IApplication Date:15:50 31 Oct 2011Section:S67Converted 00:00 22 October 2015 being commencement of term of M 08/484-I |
Extension / Renewal of Term | 408322 | Lodged:13:30 17 October 2012Applied For Period:2 YearsRECORDED:13:30 17 October 2012GRANTED:30 November 2012Granted Period:2 YearsTerm Extended To:18/10/2014 |
Mortgage | 431134 | Lodged:14:35 11 September 2013Mortgaged Shares:40/100 shares RED HILL IRON LIMITEDMortgagee:API MANAGEMENT PTY LTDREGISTERED:09:30 02 October 2013 |
Bond | 431122 | Lodged:16:00 11 September 2013Bond Type:Unconditional Performance BondBond Amount:$43,000.00RECORDED:11 September 2013RETIRED - MRF:06 March 2014 |
Mortgage | 431135 | Lodged:14:35 11 September 2013REJECTED:14:35 11 September 2013Relodged:09:30 02 October 2013Mortgaged Shares:60/100 shares API MANAGEMENT PTY LTDMortgagee:RED HILL IRON LIMITEDREGISTERED:09:30 02 October 2013 |
Application to Amend | 453057 | Lodged:10:20 15 August 2014Amending:AddressFrom:API MANAGEMENT PTY LTD, LEVEL 2 AQUILA CENTRE, 1 PRESTON STREET, COMO, WA, 6152To:API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON STREET, COMO, WA, 6152RECORDED:10:20 15 August 2014 |
Application to Amend | 453421 | Lodged:12:00 22 August 2014Amending:AddressFrom:RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 2: AQUILA CENTRE, 1 PRESTON ST COMO, WA, 6157To:RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON ST COMO, WA, 6152RECORDED:12:00 22 August 2014 |
Caveat | 456059 | Lodged:15:35 10 October 2014Caveat Type:Absolute CaveatCaveator:RED HILL IRON LIMITEDShares Caveated:60/100 shares API MANAGEMENT PTY LTDRECORDED:15:35 10 October 2014 |
Extension / Renewal of Term | 456171 | Lodged:12:46:47 14 October 2014Applied For Period:1 YearsRECORDED:12:46:47 14 October 2014GRANTED:23 December 2014Granted Period:1 YearsTerm Extended To:18/10/2015 |
Extension / Renewal of Term | 475887 | Lodged:09:29:43 14 October 2015Applied For Period:1 YearsRECORDED:09:29:43 14 October 2015GRANTED:14 December 2015Granted Period:1 YearsTerm Extended To:18/10/2016 |
Expiry - Partial | 476751 | Expired Land:Area of land contained within M08/484Retained Blocks:HAMERSLEY RANGE 1537 r, v, w, x
HAMERSLEY RANGE 1609 a, b, c, d, e, f, g, h, j, k, l, m, n, o, p, r, s, t, u, w, x, y, z
HAMERSLEY RANGE 1610 a, b, f, g, l, q, v
HAMERSLEY RANGE 1681 b, c, d, e, g, h, j, k, n, o, p, s, t, u, x, y, z
HAMERSLEY RANGE 1682 a, f, l, q, r, v, w, x
HAMERSLEY RANGE 1753 e
HAMERSLEY RANGE 1754 a, b, c, d, f, g, h, j, pRetained Total:69 BL.EFFECTIVE:00:00 22 October 2015 |
Extension / Renewal of Term | 495652 | Lodged:13:03:11 17 October 2016Applied For Period:1 YearsRECORDED:13:03:11 17 October 2016GRANTED:19 December 2016Granted Period:1 YearsTerm Extended To:18/10/2017 |
Extension / Renewal of Term | 516392 | Lodged:15:13:55 13 October 2017Applied For Period:1 YearsRECORDED:15:13:55 13 October 2017GRANTED:12 December 2017Granted Period:1 YearsTerm Extended To:18/10/2018 |
Excess Tonnage | 516577 | Lodged:08:30 17 October 2017RECORDED:08:30 17 October 2017GRANTED:09:18:16 31 October 2017Additional 284 tonnes |
Application to Amend | 521641 | Lodged:08:30 15 January 2018Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, SAME AS CORRESPONDENCE and DTC :API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON STREET, COMO, WA, 6152To:Principal Place of Business : API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :API MANAGEMENT PTY LTD, GREG WALKER, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222RECORDED:08:30 15 January 2018 |
Application to Amend | 522048 | Lodged:11:29:43 22 January 2018Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, SAME AS CORRESPONDENCE and DTC :RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON ST COMO, WA, 6152To:Principal Place of Business : RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222From:API MANAGEMENT PTY LTD, GREG WALKER, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222RECORDED:11:29:43 22 January 2018 |
Application to Amend | 522065 | Lodged:12:06:04 22 January 2018Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxxxxxxx222RECORDED:12:06:04 22 January 2018 |
Extension / Renewal of Term | 540013 | Lodged:15:15:11 03 October 2018Applied For Period:1 YearsRECORDED:15:15:11 03 October 2018GRANTED:13 November 2018Granted Period:1 YearsTerm Extended To:18/10/2019 |
Extension / Renewal of Term | 564405 | Lodged:10:16:54 09 October 2019Applied For Period:1 YearsRECORDED:10:16:54 09 October 2019GRANTED:20 November 2019Granted Period:1 YearsTerm Extended To:18/10/2020 |
Extension / Renewal of Term | 588342 | Lodged:10:10:30 15 October 2020Applied For Period:1 YearsRECORDED:10:10:30 15 October 2020GRANTED:18 December 2020Granted Period:1 YearsTerm Extended To:18/10/2021 |
Excess Tonnage | 595923 | Lodged:15:17:23 15 February 2021RECORDED:15:17:23 15 February 2021GRANTED:14:48 12 March 2021Additional 2,000 tonnes |
Caveat | 631945 | Lodged:08:30 08 September 2021Caveat Type:Consent CaveatCaveator:A.C.N. 649 012 395 PTY LTDShares Caveated:40/100 shares RED HILL IRON LIMITEDRECORDED:08:30 08 September 2021 |
Extension / Renewal of Term | 634170 | Lodged:09:11:58 15 October 2021Applied For Period:1 YearsRECORDED:09:11:58 15 October 2021GRANTED:17 December 2021Granted Period:1 YearsTerm Extended To:18/10/2022 |
Excess Tonnage | 639037 | Lodged:15:31:20 11 January 2022RECORDED:15:31:20 11 January 2022REFUSED:17:09 06 September 2022 |
Excess Tonnage | 641962 | Lodged:12:11:04 22 February 2022RECORDED:12:11:04 22 February 2022WITHDRAWN:08:15 31 May 2022 |
Application to Amend | 642634 | Lodged:15:59:24 03 March 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:Principal Place of Business : RED HILL IRON LIMITED, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:15:59:24 03 March 2022 |
Application to Amend | 644795 | Lodged:10:14:18 16 March 2022Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, 1SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:10:14:18 16 March 2022 |
Application to Amend | 644796 | Lodged:10:14:18 16 March 2022Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, 1SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxxxxxxx222To:Principal Place of Business : API MANAGEMENT PTY LTD, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:10:14:18 16 March 2022 |
Excess Tonnage | 649951 | Lodged:13:42:18 23 May 2022RECORDED:13:42:18 23 May 2022GRANTED:13:40 30 May 2022Additional 2,929 tonnes |
Excess Tonnage | 659347 | Lodged:13:04 21 September 2022RECORDED:13:04 21 September 2022GRANTED:15:05 23 September 2022Additional 10,912.74 tonnes |
Extension / Renewal of Term | 660937 | Lodged:12:54:56 12 October 2022Applied For Period:1 YearsRECORDED:12:54:56 12 October 2022GRANTED:25 January 2023Granted Period:1 YearsTerm Extended To:18/10/2023 |
Application to Amend | 664619 | Lodged:14:47:21 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600To:Principal Place of Business : API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:14:47:21 02 December 2022 |
Application to Amend | 664622 | Lodged:14:56:48 02 December 2022Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600To:API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/-RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:14:56:48 02 December 2022 |
Application to Amend | 664637 | Lodged:15:32:15 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600To:Principal Place of Business : RED HILL IRON LIMITED, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, 20 WALTERS DRIVE, OSBORNE PARK, WA, 6017, xxxxxxxxx@mrl.com.au, xxxxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxxxx600RECORDED:15:32:15 02 December 2022 |
Application to Amend | 664643 | Lodged:15:36:01 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, 20 WALTERS DRIVE, OSBORNE PARK, WA, 6017, xxxxxxxxx@mrl.com.au, xxxxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxxxx600To:Principal Place of Business : RED HILL IRON LIMITED, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, 20 WALTERS DRIVE, OSBORNE PARK, WA, 6017, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, C/- REDHILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxxxx600RECORDED:15:36:01 02 December 2022 |
Extension / Renewal of Term | 688055 | Lodged:13:07:56 18 October 2023Applied For Period:1 YearsRECORDED:13:07:56 18 October 2023GRANTED:22 December 2023Granted Period:1 YearsTerm Extended To:18/10/2024 |
Application to Amend | 707845 | Lodged:14:55 26 June 2024Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222To:API MANAGEMENT PTY LTD, LEVEL 18, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222RECORDED:14:55 26 June 2024 |
Extension / Renewal of Term | 716933 | Lodged:12:51:51 15 October 2024Applied For Period:1 YearsRECORDED:12:51:51 15 October 2024GRANTED:18 December 2024Granted Period:1 YearsTerm Extended To:18/10/2025 |
Caveat | 737110 | Lodged:16:05 30 June 2025PENDING |
Caveat | 737126 | Lodged:16:05 30 June 2025PENDING |