Tenement: E08-1227

View on Landtracker Maps (logon required)

Extracted from MTO on 13-Jul-2025 00:42, last changed 13-Jul-2025.

Tenement Summary

Identifier:E 08/1227-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:10 BL
Purposes:Term:5 Years (Extended)
Markout:Received:07-Dec-2000 11:20
Commence:08-Apr-2002 Expiry:07-Apr-2026

Holders

Company NameSharesTotal Shares
API MANAGEMENT PTY LTD60100
RED HILL IRON LIMITED40100

Applicants on Receival

Company NameSharesTotal Shares
ADELAIDE PROSPECTING PTY LTD100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Section 67Conversion 128407FinalisedM 47/1352Dead
Amalgamation (Same Holder)Amalgamation KR5/067GrantedP 08/509Dead
Amalgamation (Same Holder)Amalgamation KR5/067GrantedP 08/510Dead
Amalgamation (Same Holder)Amalgamation KR5/067GrantedP 08/511Dead
Amalgamation (Same Holder)Amalgamation KR5/067GrantedP 08/508Dead
Section 67Conversion 384468FinalisedM 08/484-ILive
Section 67Conversion 479437FinalisedG 08/88Live

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25023-Mar-2005 10.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion.08-Apr-2002
23All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.22-Feb-2019
22All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.12-Aug-2005 21-Feb-2019
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer.08-Apr-2002 11-Aug-2005
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration programme.08-Apr-2002
43Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.22-Feb-2019
42Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Aug-2005 21-Feb-2019
41Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.08-Apr-2002 11-Aug-2005
51The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.08-Apr-2002
61The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee.
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
08-Apr-2002
77The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
  • "Programme of Works (Exp 8324) E08/1227 and E47/1141" dated 16 January 2008 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources File No. T0972/200702
  • "Programme of Work for API Management Pty Ltd on E08/1227" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
  • Programme of Works (Reg. ID 20306) for API Management Pty Ltd on E08/1341, E08/1227 & E08/1283, dated 8 September 2008, signed by Peter Winter and retained on Department of Industry and Resources file NO. T0973/200702;
  • "Programme of Work for API Management Pty Ltd on E47/1141 and E08/1227" (Exp 8573) dated 4 March 2008 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T0973/200702;
  • "Programme of Work on E08/1227, E08/1289, E08/1293, E08/1294, E08/1516, E47/1141 and E47/1693" for API Management Pty Ltd (Reg ID 22407) dated 31 July 2009 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200901;
  • "Programme of Work on E47/1280 and E08/1227 for API Management Pty Ltd" (Reg ID 26828) dated 27 April 2010 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200902
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
21-Jun-2010
76The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
  • "Programme of Works (Exp 8324) E08/1227 and E47/1141" dated 16 January 2008 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources File No. T0972/200702
  • "Programme of Work for API Management Pty Ltd on E08/1227" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
  • Programme of Works (Reg. ID 20306) for API Management Pty Ltd on E08/1341, E08/1227 & E08/1283, dated 8 September 2008, signed by Peter Winter and retained on Department of Industry and Resources file NO. T0973/200702;
  • "Programme of Work for API Management Pty Ltd on E47/1141 and E08/1227" (Exp 8573) dated 4 March 2008 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T0973/200702;
  • "Programme of Work on E08/1227, E08/1289, E08/1293, E08/1294, E08/1516, E47/1141 and E47/1693" for API Management Pty Ltd (Reg ID 22407) dated 31 July 2009 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200901
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
10-Nov-2009 20-Jun-2010
75The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
  • "Programme of Works (Exp 8324) E08/1227 and E47/1141" dated 16 January 2008 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources File No. T0972/200702
  • "Programme of Work for API Management Pty Ltd on E08/1227" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
  • Programme of Works (Reg. ID 20306) for API Management Pty Ltd on E08/1341, E08/1227 & E08/1283, dated 8 September 2008, signed by Peter Winter and retained on Department of Industry and Resources file NO. T0973/200702;
  • "Programme of Work for API Management Pty Ltd on E47/1141 and E08/1227" (Exp 8573) dated 4 March 2008 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T0973/200702
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
08-Nov-2008 09-Nov-2009
74The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
  • "Programme of Works (Exp 8324) E08/1227 and E47/1141" dated 16 January 2008 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources File No. T0972/200702
  • "Programme of Work for API Management Pty Ltd on E08/1227" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
  • Programme of Works (Reg. ID 20306) for API Management Pty Ltd on E08/1341, E08/1227 & E08/1283, dated 8 September 2008, signed by Peter Winter and retained on Department of Industry and Resources file NO. T0973/200702.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
07-Nov-2008 07-Nov-2008
73The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
  • "Programme of Works (Exp 8324) E08/1227 and E47/1141" dated 16 January 2008 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources File No. T0972/200702
  • "Programme of Work for API Management Pty Ltd on E08/1227" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
06-Nov-2008 06-Nov-2008
72The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
19-Dec-2007 05-Nov-2008
71The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
23-Feb-2006 18-Dec-2007
81The exploration activity being carried out in such a manner as to create the minimum practicable disturbance to the existing vegetation and natural landform.23-Feb-2006
92The licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of:
  • $15,000.
  • $26,500
19-Dec-2007 07-Nov-2008
91The licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of:
  • $15,000.
23-Feb-2006 18-Dec-2007
101The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Works for API Management Pty Ltd on E08/1227, E08/1294 (EXP 6611)" dated 26 APril 2007 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200701.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
20-Jun-2007 19-Dec-2007
111The Licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of:
  • $20,000.
20-Jun-2007 19-Dec-2007
121All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses.06-Nov-2008
131At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the Director, Environment Division, Department of Industry and Resources.06-Nov-2008
141Rehabilitation of the exploration activities associated with Exp 8573 is required within 2 years of the date of approval. This rehabilitation extension is granted subject to the following item:
  • Within two years of Exp 8573 being approved a Mining Lease should be granted or pending over the exploration area.
Further extensions tot he Exp 8573 rehabilitation date will be assessed in relation to the future mine plans for this area and must be approved by an Environmental Officer DoIR.
06-Nov-2008
151If condition 14 is not met with two years of Exp 8573 being approved then all disturbance associated with the Programme must be immediately rehabilitated. The pit area should be backfilled and re-contoured to avoid water pooling, compacted areas must be ripped and topsoil returned to all cleared areas.06-Nov-2008

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion.08-Apr-2002
23All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.22-Feb-2019
22All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.12-Aug-2005 21-Feb-2019
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer.08-Apr-2002 11-Aug-2005
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration programme.08-Apr-2002
43Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.22-Feb-2019
42Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Aug-2005 21-Feb-2019
41Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.08-Apr-2002 11-Aug-2005
51The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.08-Apr-2002
61The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee.
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
08-Apr-2002
77The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
  • "Programme of Works (Exp 8324) E08/1227 and E47/1141" dated 16 January 2008 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources File No. T0972/200702
  • "Programme of Work for API Management Pty Ltd on E08/1227" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
  • Programme of Works (Reg. ID 20306) for API Management Pty Ltd on E08/1341, E08/1227 & E08/1283, dated 8 September 2008, signed by Peter Winter and retained on Department of Industry and Resources file NO. T0973/200702;
  • "Programme of Work for API Management Pty Ltd on E47/1141 and E08/1227" (Exp 8573) dated 4 March 2008 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T0973/200702;
  • "Programme of Work on E08/1227, E08/1289, E08/1293, E08/1294, E08/1516, E47/1141 and E47/1693" for API Management Pty Ltd (Reg ID 22407) dated 31 July 2009 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200901;
  • "Programme of Work on E47/1280 and E08/1227 for API Management Pty Ltd" (Reg ID 26828) dated 27 April 2010 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200902
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
21-Jun-2010
76The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
  • "Programme of Works (Exp 8324) E08/1227 and E47/1141" dated 16 January 2008 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources File No. T0972/200702
  • "Programme of Work for API Management Pty Ltd on E08/1227" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
  • Programme of Works (Reg. ID 20306) for API Management Pty Ltd on E08/1341, E08/1227 & E08/1283, dated 8 September 2008, signed by Peter Winter and retained on Department of Industry and Resources file NO. T0973/200702;
  • "Programme of Work for API Management Pty Ltd on E47/1141 and E08/1227" (Exp 8573) dated 4 March 2008 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T0973/200702;
  • "Programme of Work on E08/1227, E08/1289, E08/1293, E08/1294, E08/1516, E47/1141 and E47/1693" for API Management Pty Ltd (Reg ID 22407) dated 31 July 2009 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T2678/200901
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
10-Nov-2009 20-Jun-2010
75The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
  • "Programme of Works (Exp 8324) E08/1227 and E47/1141" dated 16 January 2008 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources File No. T0972/200702
  • "Programme of Work for API Management Pty Ltd on E08/1227" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
  • Programme of Works (Reg. ID 20306) for API Management Pty Ltd on E08/1341, E08/1227 & E08/1283, dated 8 September 2008, signed by Peter Winter and retained on Department of Industry and Resources file NO. T0973/200702;
  • "Programme of Work for API Management Pty Ltd on E47/1141 and E08/1227" (Exp 8573) dated 4 March 2008 signed by Peter Winter and retained on Department of Mines and Petroleum File No. T0973/200702
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
08-Nov-2008 09-Nov-2009
74The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
  • "Programme of Works (Exp 8324) E08/1227 and E47/1141" dated 16 January 2008 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources File No. T0972/200702
  • "Programme of Work for API Management Pty Ltd on E08/1227" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
  • Programme of Works (Reg. ID 20306) for API Management Pty Ltd on E08/1341, E08/1227 & E08/1283, dated 8 September 2008, signed by Peter Winter and retained on Department of Industry and Resources file NO. T0973/200702.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
07-Nov-2008 07-Nov-2008
73The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
  • "Programme of Works (Exp 8324) E08/1227 and E47/1141" dated 16 January 2008 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources File No. T0972/200702
  • "Programme of Work for API Management Pty Ltd on E08/1227" (Exp 8631) dated 12 March 2008 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200702
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
06-Nov-2008 06-Nov-2008
72The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
  • "Programme of Works (EXP 6611) E08/1227 & E08/1294" dated 26 April 2007 signed by Peter Winter of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701.
  • "Programme of Works (EXP 7645) E08/1283, E08/1227, E08/1289, E08/1294, E08/1330 and E47/1141" dated 5 October 2007 signed by Piers Goodman of API Management Pty Ltd and retained on Department of Industry and Resources file no. T0973/200701
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
19-Dec-2007 05-Nov-2008
71The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Ground Disturbance Approval Application for E08/1227, E08/1283 and E08/1341" dated 22 September 2005 (EXP 3612) and retained on Department of Industry and Resources File No. 8255/02.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
23-Feb-2006 18-Dec-2007
81The exploration activity being carried out in such a manner as to create the minimum practicable disturbance to the existing vegetation and natural landform.23-Feb-2006
92The licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of:
  • $15,000.
  • $26,500
19-Dec-2007 07-Nov-2008
91The licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of:
  • $15,000.
23-Feb-2006 18-Dec-2007
101The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Works for API Management Pty Ltd on E08/1227, E08/1294 (EXP 6611)" dated 26 APril 2007 signed by Peter Winter and retained on Department of Industry and Resources File No. T0973/200701.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
20-Jun-2007 19-Dec-2007
111The Licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of:
  • $20,000.
20-Jun-2007 19-Dec-2007
121All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses.06-Nov-2008
131At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the Director, Environment Division, Department of Industry and Resources.06-Nov-2008
141Rehabilitation of the exploration activities associated with Exp 8573 is required within 2 years of the date of approval. This rehabilitation extension is granted subject to the following item:
  • Within two years of Exp 8573 being approved a Mining Lease should be granted or pending over the exploration area.
Further extensions tot he Exp 8573 rehabilitation date will be assessed in relation to the future mine plans for this area and must be approved by an Environmental Officer DoIR.
06-Nov-2008
151If condition 14 is not met with two years of Exp 8573 being approved then all disturbance associated with the Programme must be immediately rehabilitated. The pit area should be backfilled and re-contoured to avoid water pooling, compacted areas must be ripped and topsoil returned to all cleared areas.06-Nov-2008

Dealings

TypeNumberDetails
Application to Amend93H/034Lodged 2:00:00 PM on 15 Sep 2003 amending the address to "C/- Central Tenement Services PO Box 722 West Perth WA 6872"REGISTERED 2:00 PM 15 Sep 2003
Partial Surrender - Voluntary723H/045Lodged 4:30:00 PM on 23 Mar 2005 Surrendered Blocks: HAMERSLEY RANGE 1827 r, w; HAMERSLEY RANGE 1899 t, u, z; HAMERSLEY RANGE 1900 l, m, q, r, v, w; HAMERSLEY RANGE 1971 e; HAMERSLEY RANGE 1972 a, b, f, g, j, k, m, n, o, p, s, t, u, x, y; HAMERSLEY RANGE 1973 l, q; HAMERSLEY RANGE 2044 c, d, e, h, j, nREGISTERED 4:30 PM 23 Mar 2005
Bond227002Lodged 9:30:00 AM on 16 Nov 2005 For $15,000.00RECORDED 9:30 AM 16 Nov 2005RETIRED 20 Jun 2007
Conversion128407Lodged 8:58:00 AM on 07 Feb 2006 M 47/1352 applied for pursuant to Section 67.RECORDED 8:58 AM 07 Feb 2006LAPSED 29 Nov 2006 on grant of Exploration Licence 47/1693 being made under Section 120AA.
Exemption from Drop-off249H/056Lodged 3:17:00 PM on 23 Mar 2006 for relief from the provisions of Section 65(1)b)GRANTED 20 Sep 2006
Expiry - Partial260130Mining Lease 47/1352 lapsed on grant of Exploration Licence 47/1693 and the lease application ceased to apply to that part of the land on Retained No. of blocks 33Retained Blocks:HAMERSLEY RANGE 1754 u, z HAMERSLEY RANGE 1755 q, r, v, w, x HAMERSLEY RANGE 1827 a, b, c, d, f, g, h, j, m, n, o, s, t, u, x, y, z HAMERSLEY RANGE 1899 c, d, e, j, k, o, p HAMERSLEY RANGE 1900 a, fRetained Total:33 BL.RECORDED 12.00 Midnight 29 Nov 2006EFFECTIVE:00:00 30 November 2006
AmalgamationKR5/067Lodged 10:30:00 AM on 24 Jan 2007 to amalgamate P08/508 to 08/511 inclusive into primary tenement E08/1227-I.RECORDED 10:30 AM 24 Jan 2007GRANTED 18 Oct 2007
Extension / Renewal of TermKR154/067Lodged 10:18:00 AM on 04 Apr 2007 applied for a period of 2 YearsRECORDED 10:18 AM 04 Apr 2007GRANTED 31 Mar 2008 for a further period of 2 Years
Bond267465Lodged on 01 Jun 2007 For $20,000.00 (Unconditional Performance Bond)RECORDED 01 Jun 2007RETIRED:09 October 2013
Bond278536Lodged on 23 Nov 2007 For $6,500.00 (Unconditional Performance Bond)RECORDED 23 Nov 2007RETIRED:09 October 2013
Bond285867Lodged on 11 Mar 2008 For $11,500.00 (Unconditional Performance Bond)RECORDED 11 Mar 2008RETIRED:09 October 2013
PlaintKR3/078Lodged 12:15 PM on 24 Apr 2008 by RED HILL IRON LTD and API MANAGEMENT PTY LTDRECORDED 12:15 PM 24 Apr 2008WITHDRAWN 11 Sep 2008
Bond292343Lodged on 21 May 2008 For $5,000.00 (Unconditional Performance Bond)RECORDED 21 May 2008RETIRED:09 October 2013
Bond293324Lodged on 16 Jun 2008 For $9,000.00 (Unconditional Performance Bond)RECORDED 16 Jun 2008RETIRED:09 October 2013
Bond Requirement307535Requirement Date:07/11/2008Amount:$52,000.00RECORDED:14:25:43 07 November 2008FINALISED:00:00 10 November 2009
Extension / Renewal of Term317267Lodged:14:55 03 April 2009Applied For Period:2 YearsRECORDED:14:55 03 April 2009Granted Period:2 YearsTerm Extended To:07/04/2011GRANTED:11 June 2009
Excess Tonnage326936Lodged:08:30 31 July 2009Applying for the extraction of an additional 2,500 tonnes.RECORDED:08:30 31 July 2009GRANTED:14:33:19 14 August 2009
Caveat328740Lodged:14:51 26 August 2009Caveat Type:Absolute CaveatCaveator:API MANAGEMENT PTY LTD AQUILA STEEL PTY LTD AMCI (IO) PTY LTDShares Caveated:100/100 shares RED HILL IRON LIMITEDRECORDED:14:51 26 August 2009Affected Dealing:Transfer 43107914 day notice sent:18 September 2013Affected Dealing:Mortgage 43113414 day notice sent:18 September 2013Affected Dealing:Mortgage 43113514 day notice sent:18 September 2013Order under Section 122E(1)(c) that Caveat 328740 remain in full force and effect upon expiry of 14 day notice, signed Warden Tavener 2 October 2013.
Bond333136Lodged:16:25 26 October 2009Bond Type:Unconditional Performance BondBond Amount:$28,000.00RECORDED:26 October 2009RETIRED:09 October 2013
Bond Requirement334149Requirement Date:10/11/2009Amount:$80,000.00RECORDED:10:15:06 10 November 2009FINALISED:13:16:12 06 March 2014
Application to Amend339601Lodged:15:29 28 January 2010Amending:AddressFrom:RED HILL IRON LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638, PERTH BUSINESS CENTRE, WA, 6849To:RED HILL IRON LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:15:29 28 January 2010
Application to Amend349952Lodged:14:10 29 June 2010Amending:AddressFrom:RED HILL IRON LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:RED HILL IRON LTD, C/- API MANAGEMENT PTY LTD, LEVEL 2: AQUILA CENTRE, 1 PRESTON ST COMO, WA, 6157RECORDED:14:10 29 June 2010
Extension / Renewal of Term369063Lodged:14:25 05 April 2011Applied For Period:1 YearsRECORDED:14:25 05 April 2011GRANTED:15 April 2011Granted Period:1 YearsTerm Extended To:07/04/2012
Excess Tonnage373335Lodged:16:10 03 June 2011RECORDED:16:10 03 June 2011REFUSED:10:31:24 21 July 2011
Conversion384468New Tenement:M 08/484-IApplication Date:15:50 31 Oct 2011Section:S67Converted 00:00 22 October 2015 being commencement of term of M 08/484-I
Extension / Renewal of Term394170Lodged:11:30 28 March 2012Applied For Period:1 YearsRECORDED:11:30 28 March 2012GRANTED:04 April 2012Granted Period:1 YearsTerm Extended To:07/04/2013
Extension / Renewal of Term420205Lodged:10:00 04 April 2013Applied For Period:1 YearsRECORDED:10:00 04 April 2013GRANTED:24 April 2013Granted Period:1 YearsTerm Extended To:07/04/2014
Mortgage431134Lodged:14:35 11 September 2013Mortgaged Shares:40/100 shares RED HILL IRON LIMITEDMortgagee:API MANAGEMENT PTY LTDREGISTERED:09:30 02 October 2013
Bond431120Lodged:16:00 11 September 2013Bond Type:Unconditional Performance BondBond Amount:$80,000.00RECORDED:11 September 2013RETIRED - MRF:06 March 2014
Mortgage431135Lodged:14:35 11 September 2013REJECTED:14:35 11 September 2013Relodged:09:30 02 October 2013Mortgaged Shares:60/100 shares API MANAGEMENT PTY LTDMortgagee:RED HILL IRON LIMITEDREGISTERED:09:30 02 October 2013
Extension / Renewal of Term443576Lodged:09:10 04 April 2014Applied For Period:1 YearsRECORDED:09:10 04 April 2014GRANTED:28 April 2014Granted Period:1 YearsTerm Extended To:07/04/2015
Application to Amend453057Lodged:10:20 15 August 2014Amending:AddressFrom:API MANAGEMENT PTY LTD, LEVEL 2 AQUILA CENTRE, 1 PRESTON STREET, COMO, WA, 6152To:API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON STREET, COMO, WA, 6152RECORDED:10:20 15 August 2014
Application to Amend453421Lodged:12:00 22 August 2014Amending:AddressFrom:RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 2: AQUILA CENTRE, 1 PRESTON ST COMO, WA, 6157To:RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON ST COMO, WA, 6152RECORDED:12:00 22 August 2014
Caveat456163Lodged:15:35 10 October 2014Caveat Type:Absolute CaveatCaveator:RED HILL IRON LIMITEDShares Caveated:60/100 shares API MANAGEMENT PTY LTDRECORDED:15:35 10 October 2014
Extension / Renewal of Term464852Lodged:08:30 31 March 2015Applied For Period:1 YearsRECORDED:08:30 31 March 2015GRANTED:23 April 2015Granted Period:1 YearsTerm Extended To:07/04/2016
Excess Tonnage472266Lodged:09:36:05 04 August 2015RECORDED:09:36:05 04 August 2015GRANTED:15:14:36 11 August 2015An additional 688 tonnes
Excess Tonnage476124Lodged:08:30 20 October 2015RECORDED:08:30 20 October 2015GRANTED:13:08:23 13 November 2015An additional 590 tonnes
Expiry - Partial476755Expired Land:Area contained within M08/484Retained Blocks:HAMERSLEY RANGE 1754 u, z HAMERSLEY RANGE 1755 q, v, w HAMERSLEY RANGE 1827 a, b, f, g, mRetained Total:10 BL.EFFECTIVE:00:00 22 October 2015
Excess Tonnage478080Lodged:08:30 01 December 2015RECORDED:08:30 01 December 2015GRANTED:15:48:13 04 December 2015An additional 27 tonnes
Conversion479437New Tenement:G 08/88Application Date:13:40 22 Dec 2015Section:S67Converted 00:00 26 April 2016 being commencement of term of G 08/88
Extension / Renewal of Term483983Lodged:10:24:26 30 March 2016Applied For Period:1 YearsRECORDED:10:24:26 30 March 2016GRANTED:27 May 2016Granted Period:1 YearsTerm Extended To:07/04/2017
Excess Tonnage502150Lodged:10:02:27 07 March 2017RECORDED:10:02:27 07 March 2017GRANTED:15:08:42 07 March 2017Additional 200 tonnes
Extension / Renewal of Term504076Lodged:15:10:07 06 April 2017Applied For Period:1 YearsRECORDED:15:10:07 06 April 2017GRANTED:16 June 2017Granted Period:1 YearsTerm Extended To:07/04/2018
Excess Tonnage516577Lodged:08:30 17 October 2017RECORDED:08:30 17 October 2017GRANTED:09:17:29 31 October 2017Additional 708 tonnes
Application to Amend521641Lodged:08:30 15 January 2018Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, SAME AS CORRESPONDENCE and DTC :API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON STREET, COMO, WA, 6152To:Principal Place of Business : API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :API MANAGEMENT PTY LTD, GREG WALKER, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222RECORDED:08:30 15 January 2018
Application to Amend522048Lodged:11:29:43 22 January 2018Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, SAME AS CORRESPONDENCE and DTC :RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 1, 1 PRESTON ST COMO, WA, 6152To:Principal Place of Business : RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222From:API MANAGEMENT PTY LTD, GREG WALKER, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222RECORDED:11:29:43 22 January 2018
Application to Amend522065Lodged:12:06:04 22 January 2018Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxxxxxxx222RECORDED:12:06:04 22 January 2018
Extension / Renewal of Term526973Lodged:16:23:04 03 April 2018Applied For Period:1 YearsRECORDED:16:23:04 03 April 2018GRANTED:17 April 2018Granted Period:1 YearsTerm Extended To:07/04/2019
Extension / Renewal of Term550857Lodged:12:13:39 03 April 2019Applied For Period:1 YearsRECORDED:12:13:39 03 April 2019GRANTED:09 April 2019Granted Period:1 YearsTerm Extended To:07/04/2020
Extension / Renewal of Term575608Lodged:15:32:49 06 April 2020Applied For Period:1 YearsRECORDED:15:32:49 06 April 2020GRANTED:08 April 2020Granted Period:1 YearsTerm Extended To:07/04/2021
Extension / Renewal of Term619413Lodged:12:50:17 01 April 2021Applied For Period:1 YearsRECORDED:12:50:17 01 April 2021GRANTED:08 June 2021Granted Period:1 YearsTerm Extended To:07/04/2022
Caveat631943Lodged:08:30 08 September 2021Caveat Type:Consent CaveatCaveator:A.C.N. 649 012 395 PTY LTDShares Caveated:40/100 shares RED HILL IRON LIMITEDRECORDED:08:30 08 September 2021
Excess Tonnage637190Lodged:13:32:02 08 December 2021RECORDED:13:32:02 08 December 2021GRANTED:16:07 02 March 2022Additional 55.48 tonnes
Excess Tonnage638840Lodged:12:52:23 07 January 2022RECORDED:12:52:23 07 January 2022WITHDRAWN:15:10 08 June 2022
Excess Tonnage639037Lodged:15:31:20 11 January 2022RECORDED:15:31:20 11 January 2022REFUSED:17:09 06 September 2022
Excess Tonnage639068Lodged:12:01:08 12 January 2022RECORDED:12:01:08 12 January 2022WITHDRAWN:08:26 31 May 2022
Application to Amend642634Lodged:15:59:24 03 March 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :RED HILL IRON LIMITED, C/- API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxx222To:Principal Place of Business : RED HILL IRON LIMITED, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:15:59:24 03 March 2022
Application to Amend644795Lodged:10:14:18 16 March 2022Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222To:API MANAGEMENT PTY LTD, 1SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:10:14:18 16 March 2022
Application to Amend644796Lodged:10:14:18 16 March 2022Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxx222 and DTC :API MANAGEMENT PTY LTD, API MANAGEMENT PTY LTD, PO BOX 7361, CLOISTERS SQUARE, WA, 6850, xxxx@apijv.com.au, xxxxxxxxxxx222To:Principal Place of Business : API MANAGEMENT PTY LTD, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:10:14:18 16 March 2022
Extension / Renewal of Term646646Lodged:14:47:02 05 April 2022Applied For Period:1 YearsRECORDED:14:47:02 05 April 2022GRANTED:06 May 2022Granted Period:1 YearsTerm Extended To:07/04/2023
Excess Tonnage648879Lodged:14:07:17 10 May 2022RECORDED:14:07:17 10 May 2022GRANTED:08:52 25 May 2022Additional 3,100 tonnes
Excess Tonnage659347Lodged:13:04 21 September 2022RECORDED:13:04 21 September 2022GRANTED:15:05 23 September 2022Additional 6,786.5 tonnes
Application to Amend664619Lodged:14:47:21 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : API MANAGEMENT PTY LTD, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600To:Principal Place of Business : API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222 and DTC :API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:14:47:21 02 December 2022
Application to Amend664622Lodged:14:56:48 02 December 2022Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600To:API MANAGEMENT PTY LTD, LAND ACCESS TEAM, C/-RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxx600RECORDED:14:56:48 02 December 2022
Application to Amend664637Lodged:15:32:15 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600To:Principal Place of Business : RED HILL IRON LIMITED, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, 20 WALTERS DRIVE, OSBORNE PARK, WA, 6017, xxxxxxxxx@mrl.com.au, xxxxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxxxx600RECORDED:15:32:15 02 December 2022
Application to Amend664643Lodged:15:36:01 02 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : RED HILL IRON LIMITED, 1 SLEAT ROAD, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, PO BOX 1095, CANNING BRIDGE LPO, APPLECROSS, WA, 6153, xxxxxxxxx@mrl.com.au, xxxxxxx600To:Principal Place of Business : RED HILL IRON LIMITED, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, 20 WALTERS DRIVE, OSBORNE PARK, WA, 6017, xxxxxxxxx@mrl.com.au, xxxxxxx600 and DTC :RED HILL IRON LIMITED, LAND ACCESS TEAM, C/- RED HILL IRON ORE JV LAND ACCESS TEAM, LOCKED BAG 13, OSBORNE PARK DC, WA, 6916, xxxxxxxxx@mrl.com.au, xxxxxxxxx600RECORDED:15:36:01 02 December 2022
Extension / Renewal of Term672772Lodged:14:07:02 06 April 2023Applied For Period:1 YearsRECORDED:14:07:02 06 April 2023GRANTED:23 June 2023Granted Period:1 YearsTerm Extended To:07/04/2024
Extension / Renewal of Term700431Lodged:08:30 05 April 2024Applied For Period:1 YearsRECORDED:08:30 05 April 2024GRANTED:04 June 2024Granted Period:1 YearsTerm Extended To:07/04/2025
Application to Amend707845Lodged:14:55 26 June 2024Amending:Address (Including DTC Details)From:API MANAGEMENT PTY LTD, LEVEL 14, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222To:API MANAGEMENT PTY LTD, LEVEL 18, 225 ST GEORGES TERRACE, PERTH, WA, 6000, xxxx@apijv.com.au, xxxxxxxxx222RECORDED:14:55 26 June 2024
Extension / Renewal of Term728833Lodged:11:51:47 20 March 2025Applied For Period:1 YearsRECORDED:11:51:47 20 March 2025GRANTED:03 June 2025Granted Period:1 YearsTerm Extended To:07/04/2026
Caveat737108Lodged:16:05 30 June 2025PENDING
Caveat737124Lodged:16:05 30 June 2025PENDING

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202620-Mar-2025 10783581$7,840.0010 BL22-Oct-2015 $7,840.00$0.00
Rental202529-Feb-2024 10518406$7,470.0010 BL22-Oct-2015 $7,470.00$0.00
Rental202417-Mar-2023 10338857$7,110.0010 BL22-Oct-2015 $7,110.00$0.00
Rental202317-Mar-2022 10249005$6,770.0010 BL22-Oct-2015 $6,770.00$0.00
Rental202226-Mar-2021 10189891$6,150.0010 BL22-Oct-2015 $6,150.00$0.00
Rental202113-Mar-2020 10137084$6,010.0010 BL22-Oct-2015 $6,010.00$0.00
Rental202001-Apr-2019 10090885$5,670.0010 BL22-Oct-2015 $5,670.00$0.00
Rental201928-Mar-2018 1900002690 API MANAGEMENT$5,350.0010 BL22-Oct-2015 $5,350.00$0.00
Rental201830-Mar-2017 MT-210010996308-EF$5,176.0010 BL22-Oct-2015 $5,176.00$0.00
Rental201717-Mar-2016 MT-210010533527-EF$5,006.0010 BL22-Oct-2015 $5,006.00$0.00
Rental201605-Nov-2015 (REFUND) MT-210010243246-EFPERTH$4,675.7033 BL30-Nov-2006 $11,425.00$0.00
Rental201601-Apr-2015 MT-210010243246-EF$16,100.70
Rental201504-Apr-2014 06-134321PERTH$15,691.5033 BL30-Nov-2006 $15,691.50$0.00
Rental201404-Apr-2013 06-420205PERTH$15,384.6033 BL30-Nov-2006 $15,384.60$0.00
Rental201328-Mar-2012 06-107755PERTH$14,965.5033 BL30-Nov-2006 $14,965.50$0.00
Rental201205-Apr-2011 92156PERTH$15,982.8933 BL30-Nov-2006 $15,982.89$0.00
Rental201105-May-2010 78806PERTH$15,652.5633 BL30-Nov-2006 $15,652.56$0.00
Rental201003-Apr-2009 63338PERTH$15,020.9433 BL30-Nov-2006 $15,020.94$0.00
Rental200906-May-2008 51136PERTH$7,670.1933 BL30-Nov-2006 $7,670.19$0.00
Rental200804-Apr-2007 2789KARRATHA$7,318.0833 BL30-Nov-2006 $7,318.08$0.00
Rental200715-Feb-2007 (REFUND) 23964PERTH$105.1635 BL23-Mar-2005 $5,415.74$0.00
Rental200705-May-2006 23964PERTH$5,520.90
Rental200605-May-2005 10663PERTH$3,465.0035 BL23-Mar-2005 $3,465.00$0.00
Rental200509-Jun-2004 72608PERTH$6,729.8070 BL08-Apr-2002 $6,729.80$0.00
Rental200416-Apr-2003 59386PERTH$6,514.2070 BL08-Apr-2002 $6,514.20$0.00
Rental200308-Dec-2000 2256KARRATHA$6,344.8070 BL08-Apr-2002 $6,344.80$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$70,000.00false
2025$70,000.0029-May-2025 $260,556.00$235,040.00$0.00$2,494.00$9,022.00$14,000.00$0.00false
2024$70,000.0029-May-2024 $207,244.00$164,690.00$0.00$19,969.00$8,585.00$14,000.00$0.00false
2023$70,000.0031-May-2023 $359,486.63$337,367.63$0.00$0.00$8,119.00$14,000.00$0.00false
2022$70,000.0007-Jun-2022 $213,147.89$173,918.08$0.00$0.00$7,452.73$31,777.08$0.00false
2021$70,000.0007-May-2021 $89,739.57$57,026.60$0.00$10,471.95$7,285.02$14,956.00$0.00false
2020$70,000.0005-Jun-2020 $114,930.74$83,165.67$0.00$5,677.57$6,932.50$19,155.00$0.00false
2019$70,000.0005-Jun-2019 $143,982.63$123,394.57$0.00$0.00$6,588.06$14,000.00$0.00false
2018$70,000.0021-May-2018 $82,076.02$53,980.47$0.00$8,002.50$6,414.05$13,679.00$0.00false
2017$70,000.0002-Jun-2017 $110,859.06$86,179.56$0.00$0.00$6,203.50$18,476.00$0.00false
2016$86,917.0003-Jun-2016 $3,522,818.56$3,120,490.97$0.00$75,001.00$15,277.59$312,049.00$0.00false
2015$99,000.0028-May-2015 $2,348,240.46$2,090,274.60$0.00$17,307.82$31,630.58$209,027.46$0.00false
2014$99,000.0004-Jun-2014 $346,385.00$273,110.00$0.00$0.00$18,653.00$54,622.00$0.00false
2013$99,000.0006-Jun-2013 $4,735,902.00$4,102,629.00$0.00$0.00$17,879.00$615,394.00$0.00false
2012$99,000.0005-Jun-2012 $25,110,311.00$24,810,348.00$0.00$0.00$18,784.00$281,179.00$0.00false
2011$99,000.0003-Jun-2011 $14,068,917.00$12,217,983.00$0.00$0.00$18,237.00$1,832,697.00$0.00false
2010$99,000.0002-Jun-2010 $13,503,063.00$11,229,423.00$0.00$10,392.00$17,364.00$2,245,884.00$0.00false
2009$66,000.0005-Jun-2009 $14,992,737.00$12,476,868.00$0.00$8,989.00$9,709.00$2,497,171.00$0.00false
2008$66,000.0005-Jun-2008 $5,151,982.11$4,269,684.81$0.00$19,510.67$8,849.67$853,936.96$0.00false
2007$51,500.0005-Jun-2007 $2,133,662.00$1,771,965.00$0.00$384.00$6,920.00$354,393.00$0.00false
2006$31,500.0002-Jun-2006 $273,288.00$197,070.00$0.00$32,845.00$3,959.00$39,414.00$0.00false
2005$63,000.0001-Jun-2005 $66,953.00$49,234.00$0.00$0.00$8,749.00$8,970.00$0.00false
2004$63,000.0003-Jun-2004 $69,238.00$50,689.00$0.00$0.00$9,188.00$9,361.00$0.00false
2003$63,000.0023-May-2003 $78,636.00$56,734.00$0.00$0.00$8,796.00$13,106.00$0.00false

Bond

Bond NumberNameSuretyAmountBond DateStatusStatus DateTypeCeasedOther Affected Tenements
431120Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$80,000.00 (Inital)11-Sep-2013 Retired - MRF06-Mar-2014 Unconditional Performance Bondtrue
334149Bond Requirement$80,000.0009-Nov-2009 Finalised06-Mar-2014 Unconditional Performance Bondtrue
333136Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$28,000.00 (Inital)26-Oct-2009 Retired09-Oct-2013 Unconditional Performance Bondtrue
307535Bond Requirement$52,000.0007-Nov-2008 Finalised10-Nov-2009 true
293324Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$9,000.00 (Inital)16-Jun-2008 Retired09-Oct-2013 Unconditional Performance Bondtrue
292343Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$5,000.00 (Inital)21-May-2008 Retired09-Oct-2013 Unconditional Performance Bondtrue
285867Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$11,500.00 (Inital)11-Mar-2008 Retired09-Oct-2013 Unconditional Performance Bondtrue
278536Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$6,500.00 (Inital)23-Nov-2007 Retired09-Oct-2013 Unconditional Performance Bondtrue
267465Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$20,000.00 (Inital)01-Jun-2007 Retired09-Oct-2013 Unconditional Performance Bondtrue
227002Bond - Unconditional Performance BondRED HILL IRON LIMITED$15,000.00 (Inital)16-Nov-2005 Retired20-Jun-2007 Unconditional Performance Bondtrue

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
07-May-2007 Tenement ApplicationNT Cleared